Contract 3-14 Sidewalk Repair

City of Ptatteville
STAFF REPORT AI\D FISCAL
NOTE
Title: Contrrct 3-14 Sidewalk
Policy Analysis Statement:
Brief Description And Analysis Of Proposal:
This project involves the repair of sidewalk areas throughout the City and grinding trip hazards on city sidewalks that aren't replaced.
The Council approved the budget of $40,000 for the total project. Søff opened four bids on April 1,2074. The bid tabulation is
enclosed. Low bidder for replacement of sidewalks is J and T Concrete Construction with a bid of $27,956.50.
The low bidder for the gdnding of the sidewalk is Sidewalk Savers, LLC for 163 grinds for $6,683.00.
Recommendation:
Staff recommends award of Contract 3-140 Sidewalk Repair, to J and T Concrete Construction with a bid of
trip hazards to Sidewalk Savers LLC for a maximum of
$27,956.50, and awarding the grinding of sidewalk of
$6,683.00.
Impact Of Ailoptins Proposal:
It will allow the City to repair sidewalks throushout the Citv.
Fiscal Estimate:
Fiscal Effect (check/circle all that applv)
)t No fiscal effect
_
_
_
_
Creates new expenditure account
Creates ne\À/ revenue account
Increases expenditures
Increases revenues
Increases/decreases fund balance
Budset Effect:
_X_ Expenditure authorized in budget
_
-
No change to budget required
Expenditure not authorized in budget
Budeet amendment required
Vote Required:
Fund
_X_Majority
Two-Thirds
Narrative/assumptions About Long Range Fiscal Effect:
This proiect is part of our CIP and will help us get back on track with Sidewalk Repairs
Account Number
Prepared Bv:
Department: PublicWorks
Prepared By:
Date: April1,2014
Howard B. Crofoot, P.E.
CITY OF PLATTEVILLE
Department of Public Works
Bidders'List
Contract: 3 - L4
Sidewalk Repair
Bid Opening: Tuesday April 1, 2OL4 LO:OO a.m.
608/34L-9997
Sidewalk Savers, LLC
Safe Step LLC
2658 Pasadena Blvd.
P.O. Box 411
Wauwatosa, Wl 53226 Hortonville,Wi.ï4g44
4L4/6s9-7283
e2O/2O2-Oss4
s
s
Lawinger Brothers Construction J and T Concrete
275 Lilly Street
425 W. Florence
Platteville, Wl 53818
Livingston, Wi
608/348-4s46
Sidewalk
Repair: S
Grinding:
Total Price
Quote:
35,233.80
27.9s6.s0
s
S
S
Construction
St.
gS.Zgg.gO
27.956.50
s
6683.00
5
7824.00
ooss.oo 5
7824.oo