Preparation status for the experiment at J-PARC (P-15) Hiroaki Ohnishi RIKEN Overview of the detector 1m Magnet CDH Aerogel Cherenkov CDC Beam Target chamber T0 CDC Kaon Decay Veto Bea m Veto CDH Beam Position Chamber • Three major components. – Solenoid magnet – Cylindrical Detector Hodoscope (CDH) – Scintillation counter – Cylindrical Drift Chamber (CDC) JFY06 budget JFY06+07 budget JFY07 budget 1m Beam Line tracker Solenoid magnet • 1st meeting together with NEC-TOKIN engineer has been done on 26/July/2006. • Basic lists of specification for the solenoid magnet we are agreed on the meeting – construct normal magnet, not super conducting magnet. – Size of the magnet inside (volume for detector), Φ=1.2m, length=1.2m – Maximum field strength can be achieved ~ 0.7 T – Solenoid magnet will be covered with ion case, to keep uniformity of the magnetic field inside, but must have Φ=0.35m (diameter) hole on the end cap plates to keeping space for the cables of CDC/CDH getting out from solenoid – Keep deviation of the field strength around tracker volume must be within 1% – End cap ion plates must be dismountable easily to keep accessibility to the detector inside for maintenance purpose • 2nd meeting scheduled on 8/Aug/2006 (tomorrow) RIKEN-CDS magnet (Solenoid 電磁石)磁極内部仕様 正面 1.0 m 磁極口径 1.2 m 磁極長 1.2 m 磁場強度 0.7 T 電磁石鉄蓋に穴を開ける 0.30m 直径 磁場一様性に関する要求 (最低条件) 下図 斜線部内 について1%未満である 側面 0.1 m 0.3 m 0.3 m 0.15 m 0.3 m 0.3 m 0.2 m 0.3 m 0.1 m 1.2 m 1.2 m 0.1 m 0.1 m 0.3 m Design done by NEC-TOKIN 350kW 20t ~ ¥37M Schedule • Submission of manuscript for public announcement for bid (入稿原稿投稿) • public announcement for bid • Closing date for bid (入札締切り) • Judging committee meeting for technical feasibility evaluation for biding companies • bid opening • Purchase order will be issued • Delivery of the solenoid • checking of incoming goods (検収) 1st/Sep 20th/Sep 10th/Nov 17th/Nov 20th/Nov 21st/Nov 28th/Feb/07 28th/Feb/07 Key point Specification of the solenoid must be fixed by mid Aug. i.e. in a week PMTs • PMTs for CDH also will be purchased using JFY06 budget • CDH will be installed inside solenoid, so that PMTs must have high resistively against high magnetic field Fine mesh phototube will be our choice. • Hamamatsu H8409-70(R7761) will be our 1st choice. – – – – – – Gain 4x106 at 0T, 1x106 at 0.5T Size 1.5 inch, 10cm long with HV divider chain Pulse linearity within 2% deviation up to 350 mA Transition time spread (TTS) ~ 350 ps (FWHM) \260k / tube We will purchase 50 tubes ~ \10M • Even, H8409-70 will be only available product in the world, contract at direct (随意契約) with Hamamatsu will not be accepted by RIKEN office… • Preparation for the biding process have been started. ( contract with ~ \10M is rather easy. It will takes a couple of weeks.) • Contract will be made on beginning of September • PMTs will be delivered to us by end of Feb/2007
© Copyright 2024 ExpyDoc