2007 ISOE Asian ALARA Symposium OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2006 September 12-14, 2007, Seoul, Korea Yoshihisa Hayashida Safety Information Division Japan Nuclear Energy Safety Organization (JNES) Nuclear Power Plants in Japan as of March 31, 2007 In Operation Under Construction On Planning BWR PWR Total No. of Units 32 23 55 Output (MWe) 30,101 19,366 49,467 No. of Units 1 1 2 Output (MWe) 1,373 912 2,285 No. of Units 9 2 11 Output (MWe) 11,869 3,076 14,945 Nuclear Power Plants in Japan Shika 志賀 in Operation (PWR 23, BWR 32) as of March 31, 2006 55 Units Oma Fugen ふげん ( Namie-Odaka Tomari (2003 ) (on a decommissioning stage since 年より廃止措置準備中 2003) Kashiwazaki-kariwa Higashi Dori 2 Monju (FBR)) TEPCOHigashi Dori 1 Tsuruga 敦賀 2 Mihama Onagawa 女川 Fukushima 福島第一 Daiichi 7 8 Fukushima Daini Oi Tokai (On the decommissioning stage since 1998) Takahama 3 Tokai No. 2 Shimane Kaminoseki Hamaoka Genkai Sendai 出力規模 Output scale 50万kW未満 Less than 500,000kW In operation Under Construction Less than 100万kW未満 1,000,000kW More than 100万kW以上 1,000,000kW On planning stage 5 Ikat a Total 55 Units 49,467MWe 合計 出力 47,122MWe (PWR53基 23 units, BWR 32 units ) Trend of Capacity Factor in Japanese plants 100 90 Capacity Factor (%) 80 70 60 50 40 30 20 Mean BWR PWR 10 0 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 Fiscal Year Individual Dose in Fiscal Year 2006 (April 2006 – March 2007) Plants Units Persons mSv /person BWR PWR 32 44,129 1.0 23 22,718 1.1 GCR 1 1,293 0.02 Total 56 66,895 1.0 Trend of Individual Average Dose in Japanese plants 350 5 IndividualA verage D ose 4 300 N o.of W oker exceeding 20m S v/y 3 200 2 150 100 1 50 0 0 '87 '88 '89 '90 '91 '92 '93 '94 '95 '96 '97 '98 '99 '00 '01 '02 '03 '04 '05 '06 FiscalY ear P erson m Sv/person 250 Collective Dose in Fiscal Year 2006 (April 2006 – March 2007) Plants Units Person-Sv Person-Sv /unit 42.43 1.33 BWR 32 PWR 23 24.97 1.09 GCR Total 1 56 0.03 67.43 0.03 1.23 (LWR) Trend of BWR Average Collective Dose per Reactor in Japanese Plants Exposure C apacity Factor 100 90 80 (%) 70 60 50 40 30 20 10 0 4 C apacity Factor Exposure,person-Sv/unit 5 3 2 1 0 '90 '91 '92 '93 '94 '95 '96 '97 '98 '99 '00 '01 '02 '03 '04 '05 '06 FiscalY ear Trend of PWR Average Collective Dose per Reactor in Japanese Plants Exposure C apacity Factor 5 100 80 (%) 4 70 3 60 50 2 40 30 1 20 10 0 0 '90 '91 '92 '93 '94 '95 '96 '97 '98 '99 '00 '01 '02 '03 '04 '05 '06 FiscalYear C apacity Factor Expsure,P erson-Sv/unit 90 Trend of Maintenance Exposure at Japanese BWRs Plant Name Onagawa-1 Onagawa-2 Onagawa-3 Higashidori Fukushima No.1-1 Fukushima No.1-2 Fukushima No.1-3 Fukushima No.1-4 Fukushima No.1-5 Fukushima No.1-6 Fukushima No.2-1 Fukushima No.2-2 Fukushima No.2-3 Fukushima No.2-4 Kashiwazaki・K-1 Kashiwazaki・K-2 Kashiwazaki・K-3 Kashiwazaki・K-4 Kashiwazaki・K-5 Kashiwazaki・K-6 Kashiwazaki・K-7 Hamaoka-1 Hamaoka-2 Hamaoka-3 Hamaoka-4 Hamaoka-5 Shika-1 Shika-2 Shimane-1 Shimane-2 Tokai No.2 Tsuruga-1 FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 1.4 0.8 0.7 0.6 4.13 1.07 0.2 0.3 0.4 0.5 0.95 1.42 0.62 0.61 0.2 0.3 0.32 8.57 1.33 2.0 2.7 10.8 15.5 4.43 1.18 4.1 16.9 5.4 1.65 8.71 7.94 2.22 2.6 6.34 1.6 5.9 1.94 11.15 5.56 4.94 2.0 12.72 1.6 5.63 9.43 2.97 3.6 2.4 0.8 2.8 4.4 7.19 4.7 1.9 0.8 2.05 0.6 1.4 1.79 3.71 1.2 0.9 1.4 0.6 1.7 1.1 2.98 1.1 1.2 0.8 1.8 1.3 3.19 3.31 1.67 0.7 0.6 0.8 0.6 3.65 0.76 1.0 1.2 1.2 1.9 5.61 4.09 1.68 0.6 0.8 1.91 0.48 4.07 0.91 0.8 1.7 0.95 1.7 3.57 1.47 0.56 0.3 0.5 0.5 0.58 2.0 1.75 1.97 1.85 0.9 2.16 0.7 1.2 0.64 2.99 0.78 0.3 0.3 0.3 1.2 0.8 1.07 2.27 0.2 0.3 0.4 1.3 0.64 0.81 0.8 2.7 2.4 2.98 2.59 3.89 2.5 9.23 1.5 1.93 1.8 1.1 2.0 1.9 4.98 5.08 2.9 3.7 0.8 2.4 1.12 0.7 4.31 1.55 1.48 0.2 0.9 1.6 1.8 0.9 1.1 3.03 1.1 1.31 1.1 0.5 2.1 2.2 < 1.5 1.5 3.0 > 4.5 1.1 0.98 0.4 3.7 3.51 man.Sv 3.0 man.Sv 4.5 man.Sv man.Sv 2.81 9.92 0.3 0.7 5.94 5.01 0.9 0.49 2.98 7.33 2.21 1.1 2.43 1.4 3.0 1.4 3.36 1.5 1.3 0.59 5.56 1.47 Trend of Maintenance Exposure at Japanese PWRs name Tomari-1 Tomari-2 Mihama-1 Mihama-2 Mihama-3 Takahama-1 Takahama-2 Takahama-3 Takahama-4 Ohi-1 Ohi-2 Ohi-3 Ohi-4 Ikata-1 Ikata-2 Ikata-3 Genkai-1 Genkai-2 Genkai-3 Genkai-4 Sendai-1 Sendai-2 Truruga-2 FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 0.59 0.46 0.54 0.53 0.6 0.74 0.83 0.45 0.46 0.4 0.38 0.52 0.57 0.51 0.59 0.5 0.59 1.71 1.61 2.01 1.44 2.43 0.98 0.78 1.7 1.39 1.02 2.59 0.54 0.75 0.41 0.88 2.54 1.31 1.08 1.31 1.33 0.71 1.07 1.08 1.86 1.09 1.28 1.43 0.97 0.55 0.62 1.28 1.16 1.18 1.29 0.84 1.19 0.85 1.22 1.07 0.81 1.29 2.35 1.22 1.95 1.38 1.22 1.2 0.79 1.43 1.03 1.52 1.05 1.7 1.13 3.4 3.52 3.78 2.41 1.95 1.75 1.72 2.19 4.94 4.42 1.92 1.60 1.5 1.72 1.68 2.1 0.74 0.62 0.7 0.59 0.88 1.66 2.92 0.99 2.8 0.53 0.46 0.57 0.7 0.58 0.82 0.56 0.98 1.0 1.48 1.2 2.2 1.69 1.0 1.38 0.86 1.15 1.26 0.92 1.29 2.66 1.62 1.11 2.28 0.68 0.3 0.3 0.53 0.71 0.68 1.3 1.1 2.3 1.32 1.39 1.37 1.56 0.8 0.87 0.85 0.67 1.76 1.69 1.67 2.09 1.2 0.86 0.71 0.56 0.42 0.43 0.61 1.05 1.22 1.66 1.39 0.45 0.61 0.58 1.31 1.29 1.12 1.1 1.14 1.00 0.95 1.15 1.33 1.59 2.08 1.41 1.22 0.89 1.12 1.12 1.22 1.76 1.96 1.05 0.94 0.84 0.68 1.68 0.86 1.29 3.58 1.22 < 1 2 > 1 3 man.Sv 2 man.Sv 3 man.Sv man.Sv Collective Dose During Outage vs. Year of Commercial Operation Started (BWR: 1996 - 2006) 18 BW R3 & BW R2 BW R4 BW R5 ABW R 16 P erson.Sv/O utage 14 12 10 8 6 4 2 0 1965 1970 1975 1980 1985 1990 1995 2000 FiscalYear of C om m ercialO peration S tarted 2005 Collective Dose During Outage vs. Year of Commercial Operation Started (PWR: 1996 - 2006) 6 2 LO O P 3 LO O P 4 LO O P P erson.Sv/O utage 5 4 3 2 1 0 1965 1970 1975 1980 1985 1990 1995 2000 Fiscal Y ear of C om m ercial O peration S tarted 2005 BWR Average Collective Dose per Reactor by Country 3.5 3.0 JA P A N P erson-Sv/unit 2.5 U SA 2.0 G ER M A N Y 1.5 S W ED EN FIN LA N D 1.0 S W IT ZER LA N D 0.5 0.0 95 96 97 98 99 00 01 02 FiscalY ear 03 04 05 06 PWR Average Collective Dose per Reactor by Country 2.5 2 P erson-Sv/unit JA P A N U SA 1.5 G EA M A N Y FR A N C E 1 B ELG IU M K O R EA 0.5 0 95 96 97 98 99 00 01 02 Fiscal Y ear 03 04 05 06 From 2003 to 2005 er i H a ck1 D u t ,2 an ch O e A 1,2 ys te rno ld r S u F C re sq itzp ek ue at ha ric n k G r na an 1,2 d G C l ulf in to Fe n rm M B r ont i2 un ic H o sw ello pe ick C o n C 1,2 r P e ope eek ac r S 1 t h V e B o atio n tt rm on om t Y 2,3 D r ank es e de e n 2, 3 R i P il gr ve i m rB e C o L a nd Sa 1 lu l m bi le 1 a( Ni ,2 W n NP Br e M ow il 2) n's e P t .1 Fe ,2 r Q ua ry 1 d C i ,2,3 tie s 1, 2 Pe rry Li m 1.5 1 2.5 2 3 M IN :0.81 M A X:3.66 4 From FY2004 to FY2006 Fukushim adaiicni Tokaidaini 3.5 Tsuruga O nagaw a Shika Kashiw azakikariw Fukushim adain a H am aoka Shim an H igashidori P erson-Sv/U nit BWR Three Year Rolling Average by Plant in USA and Japan M IN :0.81 M A X:3.66 0.5 0 U SA Japan From 2003 to 2005 1,2 Wate rford 3 Turk ey P t. 3,4 Crys tal R iver 3 Beav er Va lley 1 ,2 Ocon ee 1 ,2,3 South Texa s 1,2 Diab lo Ca nyon 1,2 Sale m 1,2 Surry 1,2 Calv ert C liff 1,2 San Onofr e 2,3 Sequ oyah 1,2 Watt s Ba r1 Mills tone 2,3 Arka nsas 1,2 Calla way St. L ucie Ft. C alhou n Palis ades Davis -Bes se Senda Tsuruga G enka i Ikata 1.5 TMI M iham a Tom ari 1 Harr is Farle y 1,2 Prair ie Isla nd 1 ,2 Sum mer 1 Ginn a Vogtl e 1,2 Pt. B each 1,2 Kew aune e India n Pt. 3 Byro n 1,2 North Anna Robin son 2 Wolf Gree k1 Pal V erde 1,2,3 Cata wba 1,2 Braid wood 1,2 India n Pt. 2 Com anch e Pk 1,2 McG uire 1,2 O hi Turuga 2 Cook 0 Seab rook P erson-Sv/U nit PWR Three Year Rolling Average by Plant in USA and Japan 2.5 From FY2004 to FY2006 M IN :0.51 M A X :1.84 M IN :0.43 M A X :2.1 0.5 U SA Japan Dose Rate at PLR Piping in Japanese BWR and US BWR >4.0 3.5-4.0 3.0-3.5 9 2.5-3.0 8 2.0-2.5 3 4 5 6 7 O utage N um ber 1.5-2.0 2 Japan USA 1.0-1.5 1 Median:1.55 mSv/h 0.5-1.0 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 <0.5 12 10 8 6 4 2 0 U S P lant(Ferm i-2) Japan(H am aoka-3) Number of plants m Sv/h Median:0.89 mSv/h Japan mSv/h at PLR Piping Japan:2000.12-2003 USA :2005.1 Operation Period and Maintenance Period by Country from 1996 to 2005 Operating period (days) 0 100 200 Outage (days) 0 20 Capacity Factor 90% 40 Capacity Factor 80% 60 80 USA Finland 100 Korea Japan 120 Switzerland Belgium 140 300 400 500 600 700 Further Exposure reduction Japanese utilities are continuing the approach for further exposure reduction. Regulatory side will encourages and support their activity. The effort of the improvement on inspection way for nuclear facilities is continued in Japan. Summary BWR average collective dose per reactor for 2006 decreased 3 years in a row, and the value of 1.33 person-Sv is the lowest in the past. Average collective dose per reactor for PWRs shows a stable trend in general in around 1 person-Sv. Relatively much maintenance work is performed in Japanese plants. It is expected that the improvement of inspection way and utility’s ALARA activity will promote to decrease the exposure in Japanese plants. Thank you for your attention !!
© Copyright 2024 ExpyDoc