3rd ENPCOM meeting in Extremadura Innovation in energy managment of production activities and the possible role of the public Local experienses from Arvika Presented by Thomas Malmstedt Manager of the Arvika District Heating company and Arvika Hydropower company Arvika in Sweden Distance to: Stockholm: 400 km Oslo: 165 km Gothenburg: 250 km Heating plant Lycke The company started in 1996 The main plant, Lycke, was built in 2000 It is located between two steel industries to enable waste heat recovery Main plant data: Biomass, woodchips, bark Biomass, pellets Industrial waste Availability, baseproduction 18 MW 6,5 MW 2,5 MW >98% Annual sales of heat, 110-120 GWh CO2-reduction, yearly ca 30 kton (more than 90 % reduction) Arvika District Heating System 2013, Mix of fuel Industrial waste and renewable fuel vs fossil oil Used fuel 0,5% 2,8% 1,2% 0,4% Bark, flis, grot 4% Rökgaskondensor 0,1% Spillvärme, Gjuteriet 15,4% 0,2% 0,3% 2,3% Spillvärme, Volvo Spillvärme, Schott Spillvärme, Smedjan Spillvärme & Förnyelsebart Eldningsolja, fossil Deponigas Mosseberg 14,7% 62,0% Rötgas Vik Pellets 96% Eldningsolja 4 Eldningsolja 1 Cooperation - industrial waste heat Nya Gjuteriet AB Arvika Smide AB Volvo Construction Equipment The partnership began in 2003 -Replaced fossilfired boilers, 20 MW -Installed equipment for district heating -Installed equipment for recycling of waste heat from furnaces. -Annual sales of heat, 30-35 GWh -Annual purchases of waste heat, 4 GWh -CO2-reduction, yearly, 8500 ton Local cooperation Glava Energy Center is situated in the community of Arvika, about twenty kilometers south of the town. It´s goal is to be a developing centre on a regional, national and international level and be open to companies and organisations, active in the field of renewable and efficient energy. It is also a centre of energy for children and young people to learn about energy. It has grown up because of FEM, a big transnational European project, about energy and the interest of a local company, and manufactures parts/panels for solar energy. A newly constructed solarpark is put into operation this month Total area 6000 m2, 1 MW/1 GWh
© Copyright 2024 ExpyDoc