Gemini Wind Farm Van Oord Offshore Wind Projects Dredging and Marine Contractors 1 Gemini Project – 2 contractors strategy contract strategy Gemini - Client Van Oord – BOP Contractor Siemens – WTG Supply Design, procurement and installation of: • • • • • WTG foundations HV stations In-field cables Export cables Installation of wind turbines Supply of Wind Turbines 2 Scope – BOP Contract Gemini • 55 km north of Schiermonnikoog • 120 km sailing distance from Eemshaven Engineering, Procurement and Construction of: • Wind Turbine foundations (150 x Monopile + Transition Piece) • Offshore High Voltage Stations (2x) • Export cables (sea & land) (208 km) • In-field cables (140 km) • Scour protection ( 330,000 mton) Installation of: • Wind turbines (150x) 3 3 Gemini – Supply Chain GEMINI Siemens Van Oord (BOP Contractor) EEW and SIF Monopiles Supply Smulders / SIF joint venture Aalborg Transition Pieces Supply Supply WTG NKT Cables NSW Van Oord Van Oord Siemens / Van Oord Van Oord FICG Consortium Export Cable Supply Infield Cables Supply Installation Monopiles & Transition Pieces Export & Infield Cable Installation WTG Installation Scour Protection OHVS and Onshore Substation 4 Foundations - Monopiles Monopiles (150 pcs) •Weight: 670 – 916 mT •Length: 59 – 73 m •Diameter: 5.5 – 7.0 m 5 5 Foundations – Transition Pieces Transition Pieces (150 pcs) •Weight: 192 mT •Length: 21 m •Diameter: 5.5 m 6 6 Supply of Foundations • SIF Roermond: 75 MP’s • EEW Rostock: 75 MP’s • SIF/Smulders JV (Hoboken): 150 TP’s • Marshalling Port: Eemshaven 7 Foundation Transport Shipping Routes 8 New Installation Vessel - Aeolus 9 • Length 139.40 m, width 38.00 m • Full jack-up, pay load: 6500 tons • Water Depth for jacking up to 45 m • Crane capacity 990 ton @ 30 meters 9 Monopile installation Dredging and Marine Contractors 10 Infield Cable Installation 11 11 Installation Logistics – WTG’s 12 12 Export Cable • • • • 13 Cable Supplied by NKT, Cologne, Germany Delivered by river barge to Rotterdam or Eemshaven 2 AC 220 kV AC Cables , +/- 100 km each, approx. 90 kg / m 7 Load outs of cable sections 13 Export Cable route The route of the cable is divided into three different parts: •Offshore •Near shore •Shallow •Installation Depth between 1.5 and 3 m 14 Joint locations Near shore 14 Offshore Part – Nexus NEXUS • Length over all • Breadth • Deadweight • Carrousel • Crane • Accommodation • DP 2 15 120 m 28 m 8300 tons 5000 tons 120 tons 89 pers. 15 Nexus Cable Laying Vessel 16 16 Cable Burial Offshore Part – Jan Steen Jan Steen + ROV Trencher • Length over all 77 m • Breadth 19 m • Deadweight 1853 tons • Crane 60 tons • DP 2 17 17 Cable route shallow part No access allowed from 15-05 to1-09 Tidal restricted 18 18 Shallow Part – Laying & Burial 19 19 Shallow Part – Laying & Burial (2) 20 20 OHVS Installation 21 Rock Installation Scour Protection & Rock crossings 22 Project Support Gemini • Port of Eemshaven Quay space, storage, cranes, forklifts, operators • Vessel consumables fuel, water, provisions • Site facilities Offices, accommodation, transport, catering, security • Maritime services Tugs, ROV, diving, safety, communication, logistics • Tools & equipment for vessels & in harbour • Personnel Secretaries, catering, account managers, logistics, marine vessel coordination, security, safety inspectors, document control 23 23 Contact 24 Van Oord Offshore Wind Projects bv Jan Blankenweg 2 4207 NH Gorinchem T +31 88 8265100 F +31 88 8265110 E [email protected] 24
© Copyright 2024 ExpyDoc