Program NO DIG BERLIN 2015 SYPOSIUM NO DIG BERLIN in conjunction with INTERNATIONAL PIPELINE SYMPOSIUM A two-day SYMPOSIUM provides unique opportunities for specialists to exchange information and share their experiences with trenchless technology. NO DIG BERLIN/ ILBS 80.00 EUR valid from 24 to 25/03/2015, incl. trade visitor pass (2 days) NO DIG BERLIN 2015 GALA-Buffet Tickets available mid of february: www.nodigberlin.com Ticket Online Shop: www.wasser-berlin.de/en/ www.nodigberlin.com Exhibition Sponsors Gold Silver Symposium in conjunction with Bronze WASSER BERLIN INTERANTIONAL 2015 has sharpened its profile as a world-leading exhibition for pipeline construction. 24 – 27 March 2015 www.nodigberlin.com · Berlin Exhibition Grounds Trenchless technology will be highlighted again as part of NO DIG BERLIN 2015 and supplemented by the traditional CONSTRUCTION SITE DAY (SCHAUSTELLE WASSER BERLIN INTERNATIONAL), hosted by the Berlin Waterworks. Construction Site Day: 80.00 EUR Organisers: Supportet by: as of January 2015 Partners: Contact: Dagmar Eichhorn Expert for International Affairs German Society for Trenchless Technology e.V. Messedamm 22 · 14055 Berlin · Germany Phone. +49(0)30/3038-2398 · [email protected] Special Supporter national Societies of ISTT: Australia New Zealand Spain Portugal Austria Italy Brazil Japan Bulgaria Netherlands Hong Kong USA Canada Mexico Poland Colombian Russian Federation China South Africa Czech Republic Turkey Finland Ukraine France United Kingdom NO DIG BERLIN 2015 in conjunction with INTERNATIONAL PIPELINE SYMPOSIUM Hall 1.2 / Room Stuttgart Tuesday, March 24 OPENING SESSION 10:00 – 12:00 17:00 – 17:30 Opening Session (Marshall-Haus), GSTT AWARD WELCOME NO DIG BERLIN / ILBS 13:00 Derek Choi, ISTT, Hong Kong Prof. Jens Hölterhoff, GSTT, Germany Manfred Vogelbacher, rbv, Germany Ulf Altmann, DVGM, Germany SESSION 1: TESTING & ASSESSMENTS/ASSET MANAGEMENT Moderator: Christoph Kreutz 13:30 – 14:00 14:00 – 14:30 14:30 – 15:00 15:00 – 15:30 15:30 – 16:00 FIELD MEASUREMENTS FOR THE APPLICATION OF TRENCHLESS TECHNOLOGY ON DISTRICT HEATING Dr. Ingo Weidlich, Fernwärme-Forschungsinstitut in Hannover, Germany DETERMINATION OF HOOP STRENGTH AND STIFFNESS IN SHORT AND LONG TERM TESTING OF PIPES AND LINERS John Gumbel, JG Pipeline Consultancy Ltd, United Kingdom Wednesday, March 25 16:30 – 17:00 9:00 – 9:30 9:30 – 10:00 10:30 – 11:00 New enhanced Ultrapipe® glass fabrics for UV curable liners Kees den Besten, Owens Corning, The Netherlands Lunch 14:00 – 14:30 Trenchless installation: Which method is the most appropriate? Manfred Hochbein, Gelsenwasser, Germany 14:30 – 15:00 The dynamic stresses of jacking pipes and their verification Dr. Ulrich Bohle, Steinzeug-Keramo GmbH, Germany 15:00 – 15:30 Preliminary test on modified clays for brine based drilling fluids MSc. Dianne den Hamer, Ghent University, Belgium Increasing requirements move boundaries in Pipe Jacking Peter Schmaeh, Herrenknecht AG, Germany 15:30 – 16:00 Direct Pipe pipeline installation in the Netherlands H.M.G Kruse, Deltares, The Netherlands Cases study on application of rectangular shield jacking machine Ms.Trisha Sun, GX trenchless Pte Ltd., Singapore 16:00 – 16:30 Aspern Relief Sewer: An Interesting Combination of Different Construction Methods Thomas Milkovics, Magistrat der Stadt Wien, Austria 16:30 – 17:00 Emscher – A Project for Generations: Contract Section 30, Europe’s Largest Pipe-Jacking Site Christian Korndörfer, Wayss & Freytag Ingenieurbau AG, Germany Moderator: Steffen Ertelt GW 301 – Current developments in certification Christoph Kreutz, rbv e.V., Germany Verena Schrader, DVGW CERT GmbH, Germany COMPLEX CONSTRUCTION PROJECTS WITH PIPE LINERS – LARGE PROFILES, OVAL PROFILES, SPECIAL PROFILES Gunter Kaltenhäuser, RELINEEUROPE, Germany 13:30 – 14:00 SESSION 3: HDD / PIPE BURSTING Applied technologies for economical sustainability in due consideration of trenchless laying techniques Steffen Ertelt, Duktus Rohrsysteme Wetzlar GmbH, Germany The Keyhole technology for installation and renewal of supply property service connections Elmar Koch, Tracto Technik GmbH & Co., Germany Gerd Rettschlag, SWG, Germany SESSION 4: RENOVATION / REHABILITATION Moderator: Dr. H.-J. Bayer 11:00 – 11:30 Challenges for Network Construction in Berlin Dr. Joachim Reichert, Berliner Wasserbetriebe, Germany 11:30 – 12:00 Ductile cast iron pipe system – pioneer of trenchless pipeline construction and renovation methods Jürgen Rammelsberg, EADIPS®/FGR®, Germany SESSION 2: CIPP 16:00 – 16:30 Vegetation and infrastructure, is there a conflict? Trees in proximity to piping – Practical experience Michael Honds, Sachveständigenbüro M. Honds, Germany Moderator: Ulrich Bohle 10:00 – 10:30 Moderator: Gunter Kaltenhäuser 12:30 – 13:00 SESSION 5: PIPE JACKING / MICROTUNNELING Water loss analysis Mag. Ulrike Rabmer-Koller, Rabmer Management und Beteiligungs GmbH, Austria Welding and assessing pipelines made of PE – Changes in the DVS rules with regard to electrofusion and heated plate welding Jan Zimmermann, Schweißtechnische Lehr- und Versuchsanstalt Nord gGmB, Germany Systematic comparison of the four main national methods ASTM F1216, WRc-SRM, DWA-A 143-2 and 3R-2014 applicable to flexible liners of both circular and non-circular cross-sections Jean-Marie JOUSSIN, French Society for Trenchless Technology, France 12:00 – 12:30 Implementing Spiral-Wound technology in Ansbach, Germany – Illustration of the cost effectiveness, technical feasibility and ecological advantages of trenchless rehabilitation technologies. Jochen Kuhn, Abwasserentsorgung Ansbach AöR (awean), Germany NO DIG BERLIN 2015 GALA-BUFFET 19:00 Thursday, March 26 CONSTRUCTION SITE DAY (Schaustelle WASSER BERLIN INTERNATIONAL) all day
© Copyright 2024 ExpyDoc