WATER AND SEWER COST AS OF JANUARY 1, 2015 WATER METERS ¾” 1" 1½” 2" Water Meter .................... $ 60.00 Water Meter .................... $ 270.00 Water Meter .................... $ 365.00 Water Meter .................... $ 490.00 WATER CONNECTIONS LESS METER * ¾” 1" 1½” 2" Water Connection Less Meter .................... $ 1,225.00 Water Connection Less Meter .................... $ 1,360.00 Water Connection Less Meter .................... $ 2,275.00 Water Connection Less Meter .................... $ Cost Plus 15% COMPLETE WATER CONNECTIONS ¾” 1" 1½” 2" * Complete Water Connection ...................... $ 1,285.00 Complete Water Connection ...................... $ 1,630.00 Complete Water Connection ...................... $ 2,640.00 Complete Water Connection ...................... $ Cost plus 15% SEWER CONNECTIONS * 4" 6" 6" 6" Sewer Connection ...................................... $ 1,640.00 Sewer Connection to M.H. in Street .......... $ Cost Plus 15% Sewer Connection to M.H. on Outfall….... $ Cost Plus 15% Sewer Connection to New M.H. ................ Installed by Contractor SIDEWALK CUTS Sidewalk Cut ..................................................... $ 450.00 SPECIAL PRIVILEGE CHARGE - WATER AND SEWER, MAIN LINE CAPITAL CHARGE (MLCC) AND ACREAGE FEES Special Privilege Charge for Water .................................. $ Special Privilege Charge for Sewer .................................. $ Main Line Capital Charge (County ) ................................ $ Acreage Charge for Sewer ( Hanes Mall Blvd. Area) ...... $ Acreage Charge for Sewer ( Deep River Area)…………. $ Acreage Charge for Sewer ( Lower Abbott’s Crk Area).. $ Acreage Charge for Sewer ( Martins Mill Creek Area) ... $ Acreage Charge for Sewer ( Leak Creek Area) ……….... $ Stratford Road Impact Fee ................................................ $ 21.00 / Foot 45.00 / Foot 2,500.00 / Connection 512.99 / Acre 2,196.15 / Acre 2,196.15 / Acre 2,196.15 / Acre 425.00 / Acre 4,300.00 / Acre * Note: These prices include the cost of pavement repair under the jurisdiction of the City of Winston-Salem. In areas where the pavement repair is not under the controlling jurisdiction of the City of Winston-Salem or another jurisdiction with similar policies, the cost shall be estimated by staff and a deposit shall be required. The actual repair cost will be tracked and charged back against the deposit with a 15% overhead charge. H:\Chuckie’s Stuff\WScost_14.wpd
© Copyright 2024 ExpyDoc