Main Procedures under the Mandatory Window Inspection Scheme (MWIS) Owners receive MWIS statutory notices Owners appoint Qualified Person(1) (QP) to carry out prescribed inspection(4) S c ena r io 2: R epa ir ( 4) is requ ired aft e r in sp ec tion (Af te r t he in sp e ct ion, if o wn er s appo int t he sa me QP ( 3 ) for su pe rv is ion o f re pa ir) S c ena r io 1: No repa ir ( 4) is re qu ire d aft er in sp ect ion If prescribed inspection is completed within 7 days after the date of appointment QP submits Form MWI 5 (2) to notify the Building Authority (BA) of his appointment for inspection and completion of the inspection and to certify that no repair is required Other cases or Step 1: QP submits Form MWI 1(2) to notify the Building Authority (BA) of his appointment for inspection, and personally carries out the inspection Step 2: QP notifies the BA with Form MWI 2a(2) of completion of the inspection and certifies that no repair is required If prescribed inspection and prescribed repair are completed within 7 days after the date of appointment QP submits Form MWI 5(2) to notify the Building Authority (BA) of his appointment for inspection and supervision of repair and completion of the inspection and the necessary repair Other cases or Step 1: QP submits Form MWI 1(2) to notify the Building Authority (BA) of his appointment for inspection and supervision of repair, and personally carries out the inspection Step 2: Owners appoint registered contractor(5) to carry out the necessary prescribed repair under the supervision of the same QP Step 3: QP notifies the BA with Form MWI 3(2) of completion of the inspection and the necessary repair Scenario 3: Re pa ir ( 4) is re qu ired af te r ins pe ct ion (Af te r t he in sp e ct ion, if o wn er s appo int ano th er QP ( 3 ) fo r su p e rv is io n of repa ir) QP submits Form MWI 1(2) to notify the Building Authority (BA) of his appointment for inspection, and personally carries out the inspection The QP who carried out the inspection notifies the BA with Form MWI 2(2) of completion of inspection and submits inspection report (including the repair proposal) to the BA Owners appoint another QP for supervision of repair The QP appointed for supervision of repair submits Form to notify the BA of his appointment for supervision of repair END Notes (1) The QP list is available for viewing on the BD’s website <http://www.bd.gov.hk> under the “Access to Information” section. Owners appoint registered contractor(5) to carry out the necessary repair under the supervision of the QP (2) The relevant specified forms and the samples of the completed specified forms are available for viewing on the BD’s website <http://www.bd.gov.hk> under the “Public Forms” section. (3) The QP appointed for prescribed inspection may be the same as or different from the QP for supervision of prescribed repair. (4) The standard and requirement of inspection and repair is specified in the Code of Practice for Mandatory Building and Window Inspection The QP appointed for supervision of repair notifies the BA with Form MWI 4(2) of completion of the necessary repair Schemes issued by the Buildings Department, which is available for viewing on the above BD’s website. (5) If the QP appointed for prescribed inspection or supervision of prescribed repair is a registered general building contractor or registered minor works contractor (RMWC) in respect of windows, he may also act as the contractor to carry out the prescribed repair. However, the RMWC can only carry out those class, type and item of minor works under which he is registered. (06/2014) END
© Copyright 2025 ExpyDoc