Matrix of changes for the 2015 National Standard Plumbing Code

Matrix of changes for the
2015 National Standard Plumbing Code
July 23, 2014
Item #
Section Number
Person Submitting Change
2013 SupplementTabled Items
13-25 Section 3.4.6 Limits on Lead
NSPC Committee
13-63 Table 3.1.3 - Part XI
NSPC Committee
13-65 Table 3.1.3 - Part XI
NSPC Committee
13-77 Table 3.4.3 PP
NSPC Committee
13-86 4.2.14.5 Heat Fusion Joints
NSPC Committee
13-91A Table 5.2
NSPC Committee
13-100 5.5.1.d Exception
NSPC Committee
13-111 7.4.4 & 7.4.9 Water Closets
NSPC Committee
13-118 Section 7.10.4
NSPC Committee
13-121 Drinking Water Facilities
NSPC Committee
13-125 7.16.4 Required Locations for Floor Drains
NSPC Committee
13-126 7.16.4 a Floor Drains in Toilet Rooms
NSPC Committee
13-129 7.21.5 c Laundry Trays
NSPC Committee
13-173 10.15.2 c
NSPC Committee
13-177 10.15.6 j
NSPC Committee
13-179 10.15.6 Mixed Water Update
NSPC Committee
13-187 10.16.7 Water Heater Vacuum Relief
NSPC Committee
13-190 10.20.2 f Lead Free
NSPC Committee
Committee Action
Item #
Section Number
Person Submitting Change
13-192 10.20.4
NSPC Committee
13-194 10.20.4 d Lead Free
NSPC Committee
13-195 10.20.8 ASSE 7010
NSPC Committee
13-195a Table 11.4.1 Shower Stall DFU's
NSPC Committee
13-203 12.4.1 b Vent Terminals
NSPC Committee
13-207
13.1.1 Where Required
NSPC Committee
13-213 15.3 Leak Testing
NSPC Committee
13-214 15.3.2 Exception
NSPC Committee
2015 NSPC Proposed Changes
14-1
1.2 Adopting Agency & AHJ
NSPC Committee
14-2
1.2 Backflow Definitions
NSPC Committee
14-3
1.2 Compensating Valves
NSPC Committee
14-4
1.2 Deleted Definitions
NSPC Committee
14-5
1.2 Local Ventilating Pipe
NSPC Committee
14-6
1.2 Revised Definitions
NSPC Committee
14-7
1.2 RP Backflow Preventer
NSPC Committee
14-8
1.2 Sewage & Waste
NSPC Committee
14-9
1.2 Sewage Pump
NSPC Committee
14-10 1.2 Stack
NSPC Committee
14-11 1.2 Storm Drains
NSPC Committee
14-12 2.3.1 Uses for Drainage Fittings
Donald Jones
14-13 2.4.3 Obstruction to Flow
Ron George
Committee Action
Item #
Section Number
Person Submitting Change
14-14 2.4.5 Accessible Joints
NSPC Committee
14-15 2.6.3 Initial Back-fill
NSPC Committee
14-16 2.9 Pipe Protection
NSPC Committee
14-17 2.23 Dead Ends
NSPC Committee
14-18 2.25.5 Sanitary Floor Sinks
NSPC Committee
14-19 2.26 Elevator Pits
NSPC Committee
14-20 2.30 Swimming Pools
NSPC Committee
14-21 Table 3.1.3 Update (Parts I - XI)
NSPC Committee
14-22 Tables 3.1.3, 3.5, 3.7 ASTM D2751
NSPC Committee
14-23 3.3.8 c Pressure Tanks and Vessels
Donald Jones
14-24 Table 3.4 Updates
NSPC Committee
14-25 Table 3.4 ASTM D2672
NSPC Committee
14-26 3.4.1.2 Stainless Steel
Nick Azmo
14-27 Table 3.4.2 ASTM D3035 ASTM F714
NSPC Committee
14-28 Table 3.4.2 Updates
NSPC Committee
14-29 3.4.6 Limits on Lead
NSPC Committee
14-30 Tables 3.5 - 3.7 ASTM F1760
NSPC Committee
14-31 Tables 3.5 - 3.8 Updates
NSPC Committee
14-32 4.2.11.2 Mechanical
Daniel O'Gorman
14-33 4.2.14.5 AWWA C906
NSPC Committee
14-34 4.2.14.6 ASTM F1498
NSPC Committee
14-35 4.2.15 Slip Joints
Pete Hammer
Committee Action
Item #
Section Number
Person Submitting Change
14-36 4.2.18 Heat Fusion
NSPC Committee
14-37 4.3.8 Aboveground/Underground
NSPC Committee
14-38 4.3.8 Joints
Daniel O'Gorman
14-39 5.1 Separate Traps for Each Fixture
Ron George
14-40 5.3 General Requirements for Traps
Ron George
14-41 5.3.7 Drum Trap Solids Interceptors
NSPC Committee
14-42 5.4.6 Installation of Cleanouts
NSPC Committee
14-43 5.5.1.d Backwater Valves
NSPC Committee
14-44 6.1 & 6.2 AHJ
NSPC Committee
14-45 7.2 Accessibility Standards
NSPC Committee
14-46 7.3.5 Wall-hung Supports
NSPC Committee
14-47 7.4.4 Delete WC Accessibility
NSPC Committee
14-48 7.4.8 Water Closets with Pumps
NSPC Committee
14-49 7.5.1 Urinals
NSPC Committee
14-50 7.6.1 Lavatory Air Gaps
NSPC Committee
14-51 7.6.5 Wash Fountains
NSPC Committee
14-52 7.8.2 Waste and Overflow
NSPC Committee
14-53 7.8.4 Bathtub Backflow
NSPC Committee
14-54 7.9 Whirlpool Baths
NSPC Committee
14-55 7.10.4 Shower Outlets
NSPC Committee
14-56 7.10.6 Shower Pan Test
NSPC Committee
14-57 7.11 Sinks
NSPC Committee
Committee Action
Item #
Section Number
Person Submitting Change
14-58 7.12 Drinking Water Facilities
NSPC Committee
14-59 7.15.1 ASSE 1021
NSPC Committee
14-60 7.16 Floor Drains
NSPC Committee
14-61 7.18.1 Special Installations
NSPC Committee
14-62 7.19 CSA B125.3
NSPC Committee
14-63 7.21 Required Plumbing Fixtures
NSPC Committee
14-64 7.21.6.e Hand Washing Facilities
NSPC Committee
14-65 7.21.6 e Hand Washing Facilities
Michael Baker
14-66 7.22 ref 10.18.1
NSPC Committee
14-67 7.24 Emergency Eyewash
NSPC Committee
14-68 Chapter 8 Miscellaneous
NSPC Committee
14-69 9.1.3 Air Breaks
NSPC Committee
14-70 10.1 Potable Water Supply
NSPC Committee
14-71 10.5.1 Air Gaps
NSPC Committee
14-72 10.5.5.b Urinal Vacuum Breakers
NSPC Committee
14-73 10.5.6 Backflow Certification
NSPC Committee
14-74 10.5.14 Backflow Matrixes
Nick Azmo
14-75 Table 10.8.3 Overflow Pipes
NSPC Committee
14-76 10.12 Shutoff Valves
NSPC Committee
14-77 10.12.2 Building Valve
NSPC Committee
14-78 10.12.4 Dwelling Units
NSPC Committee
14-79 10.13 CSA B125.6
NSPC Committee
Committee Action
Item #
Section Number
Person Submitting Change
14-80 10.14.7 and 10.16.7
NSPC Committee
14-81 10.15.1 Hot Water Supply
NSPC Committee
14-82 10.15.2 Hot Water Temp Maintenance
NSPC Committee
14-83 10.15.2c Recirculation
Greg Towsley
14-84 10.15.6 Mixed Water Temperature Control
NSPC Committee
14-85 10.15.6 Hand Washing
NSPC Committee
14-86 10.15.7 Thermal Expansion Control
NSPC Committee
14-87 10.15.9.3 Drainage
Michael Baker
14-88 10.15.11 Domestic HW Heaters
NSPC Committee
14-89 10.16.3 Temperature Relief Valve
NSPC Committee
14-90 10.16.3 Temperature Relief Valve
Donald Jones
14-91 10.16.6 Relief Valve Discharge Piping
NSPC Committee
14-92 10.16.6 Relief Valve Discharge Piping
Ron Barbarulo
14-93 10.20.8 ASSE 7010
NSPC Committee
14-94 Table 11.4.1 GPM to DFU
NSPC Committee
14-95 11.4.4 Floor Drains
NSPC Committee
14-96 11.5.2 Drain Stack Sizing
NSPC Committee
14-97 11.5.3 Branch Drains
NSPC Committee
14-98 11.6 Effect of Offsets
NSPC Committee
14-99 11.6.3 Length of Stack Vents
NSPC Committee
14-100 11.7.4 Pneumatic Ejectors
NSPC Committee
14-101 11.7.6 ASME/CSA
NSPC Committee
Committee Action
Item #
Section Number
Person Submitting Change
14-102 11.9 Base of Stack Connections
NSPC Committee
14-103 12.3.1 Venting Drain Stacks
NSPC Committee
14-104 12.6.1 Vent Slope
NSPC Committee
14-105 12.8.2 Future Vent
NSPC Committee
14-106 12.8.2 Aggregate Size of Vent
Daniel O'Gorman
14-107 12.13 Battery Venting
NSPC Committee
14-108 12.14 Subdrain Sump Pumps
NSPC Committee
14-109 Table 12.16 (2012)
NSPC Committee
14-110 12.16.4 Size Vents
NSPC Committee
14-111 13.1.6 Draining Areaways
NSPC Committee
14-112 13.1.9 Trench Drains
NSPC Committee
14-113 13.1.13 Water-operated Sump Pumps
NSPC Committee
14-114 13.4.1 Improper Connections
NSPC Committee
14-115 13.5 Roof Drains
NSPC Committee
14-116 13.6 Sizing of Storm Drain Piping
NSPC Committee
14-117 13.7 Area Drains and Trench Drains
NSPC Committee
14-118 14.3.2 ASSE 6000
NSPC Committee
14-119 15.3 Testing
NSPC Committee
14-120 Chapter 17 Private Systems
NSPC Committee
14-121 17.9.1 Pitless Adapters
NSPC Committee
14-122 18.1 Trailer Coach
NSPC Committee
14-123 18.5.3 Trailer Parks
NSPC Committee
Committee Action
Item #
Section Number
Person Submitting Change
14-124 19.1, 19.2 Referenced Standards
NSPC Committee
14-125 Appendix D - Examples A & B
NSPC Committee
14-126 F.2 References
NSPC Committee
14-127 Appendices H & J - delete
NSPC Committee
14-128 Appendix J
NSPC Committee
Committee Action