Ariba system – Ariba Spend Management How to submit a bid A brief guide Operative guide for partecipating to SE on line tenders 1 Ariba system – Ariba Spend Management On myHome portal select an event for submit a bid Operative guide for partecipating to SE on line tenders 2 Ariba system – Ariba Spend Management Read event rules, eventually published documents and then select „Prepare bid“ Operative guide for partecipating to SE on line tenders 3 Ariba systém – Ariba Spend Management Sometimes is needed to allow downloading files before – click on the click on the message bar at the top of the page Operative guide for partecipating to SE on line tenders 4 Ariba system – Ariba Spend Management Enter requested files or fill in bid values (content depends on event type and specific tender conditions) , below is an example of bidding in Technical-Economic phase Operative guide for partecipating to SE on line tenders 5 Ariba system – Ariba Spend Management Select „Submit Entire Response“ and confirm „OK“ Operative guide for partecipating to SE on line tenders 6 Ariba system – Ariba Spend Management When you insert a bid you can revise it. All bids submitted by you in this online event you can find at „Response History“. In „Event messages“ you can find all messages for this event. Operative guide for partecipating to SE on line tenders 7 Ariba system – Ariba Spend Management Otherwise looks bidding in the English auction, after inserting values appears ranking or even lowest price - leading offer Operative guide for partecipating to SE on line tenders 8 Ariba system – Ariba Spend Management In Dutch auction system shows the gradually increasing price. You only has to accept it. Operative guide for partecipating to SE on line tenders 9 Info This brief guide is meant only to point out how to submit bids. Here are not described the differrencies between the bidding using all existing phase types: • RFI – is used for the submission of documents, • RFP – is used for submission of the technical bid, • RFQ – is used for the submission of economic bid, • RFQ technical economic for multienvelopes – it is combined submission, which may include bidding for all of the above phase types. Bids in the RFQ may be submitted as: • Sealed envelopes, • Closed English Auction, • Opened English Auction, • Dutch auction. END Operative guide for partecipating to SE on line tenders 10
© Copyright 2024 ExpyDoc