Intelligently Connected Pipe S-Lay Installation Using the patented GMC Mechanical Connector, installation operations can be optimised for both S-lay and J-lay installations offshore. Experience where it counts. Innovation where it matters. GMC Mechanical Connector Key Features: • Binary concentrically grooved connector • Multiple metal-to-metal nib seals • ID & OD preloaded contact shoulder • Highly fatigue resistant (=DNV B1) • Excellent torsional slip resistance • Unlimited fast make-break cycles • Wide range of sizes (6¨to 48¨) DNV ISO21329 ‘Statement of Conformity’ HOU-01-SC-42039783 The GMC Mechanical Connector is the core technology behind GMC’s Intelligently Connected Pipe (ICP), which delivers a more robust pipeline, whilst simplifying and reducing installation costs. ICP allows the time consuming joining operation to be performed onshore, off the critical path. During offshore operations, only the fast coupling of the male and female connector is performed by a single connector station. As a result, with better planning and with more efficient technology, the offshore installation contractor can effectively reduce the stand-by time and the actual operation time of the installation vessel and personnel. BARGE BPZ-01 S-LAY CONCEPT Since 1990 ICP Installation: Barge BPZ-01 S-Lay Concept Barge bpz-01 Vessel Key Features Length o.a. : 73.16 m Breath” 21.95 m Depth: 4.69 m Max Draught: 3.91 m Deck Capacity: 32 T / m2 1000 m2 Free Deck Cargo Accommodation: 53 Persons Gross Tonnage (GT):1916 Net Tonnage (NT): 574 Winches: 2 x Skagit RB 90W PR 3 Drums Generator: 1 x Cummins 240 Watts Anchors: 6 x Standard Anchor 15,000 lbs (8.2 T) Anchor Cable: Diameter 1 ½” Length 2500 ft S-Lay Option General Arrangement PIPELAY CYCLE • Vessel crane loads triple joint onto firing line roller boxes • Crane rigging removed • Powered rollers engage triple joint with catenary connector • Connection tool engaged and joint made • Make up tool disengaged • Clear connection station area • Release collar clamp and pipe out pipeline using A & R system, whilst simultaneously moving vessel MODULAR EQUIPMENT • • • • • • • • 150 MT Connection Station 150 MT A&R Winch & Pop-up Turning Sheave 19 m Stinger System 1 x Triple Joint Pipe Rack 1 x Triple Joint Walking Beam 9 x Driven Elevating Roller Boxes 1 X HPU ICP Installation: Barge BPZ-01 S-Lay Concept ICP Connection Station A compensated connection station is required to mechanically connect the ICP joints. This is a development of an existing tool used for riser installation, and is installed towards the stern of the vessel. In operation, the pipe string is retained by a collar clamp that engages with a groove on the female connector at the end of the pipeline. A male end of a second pipe joint is then engaged with the clamped joint and a hydraulic tool used to make the mechanical connection. The connector station is mounted on rails with hydraulic cylinders with an accumulator pack to compensate for vessel motions . It compensates for acceleration and deceleration differences between the vessel & pipe maintaining the back tension at a sufficient level. Hence, reduce the uncontrolled load due to displacement at the surface, maintain load through the sagbend and reduce induced loads at the seabed touchdown point. An accumulator pack (separate unit) is connected to the cylinder by means of hydraulic piping. A position sensor is connected to the trolley to measure the position of the trolley. Outline Specification Up to 12¨OD Pipe L x W x H: 7.3 m x 2 m x 2 m 600 kW Power Environmental (Temperature: -10° - 45°C, Humidity: 0 to 95%) Maritime (saline), direct exposure to sunlight & rain Modular Containerised System – control includes Motion Reference Unit Connector System Opening suitable for 1M OD inline sleds 250 MT mechanical connector clamp load, and 8,000 psi injection pressure Compensation System 150 MT Passive Heave capacity 8 -16s Period Max min +/- 2.5m heave comp in a linear direction Speed Paying In 30 (m/min) Speed Paying Out 36 (m/min) Battery of accumulators based on Nitrogen Nitrogen generator included A&R Winch System An A & R winch is required to deploy the pipeline with a maximum capacity of 150Mt. The winch will be connected to the pipe via a pop up clamp and an internal pipe clamp, similar to that illustrated. 150 MT A&R winch 500 m of 77 mm diameter wire rope 150 MT 180° turning sheave 150 MT internal pipe clamp including sealant GMC ICP Installation: Barege BPZ-01 S-Lay Concept PRIMARY STINGER SYSTEM • • • • • 19 m Stinger plus 6 Roller Boxes 70 MT Stinger Winch A-Frame Barge Frame Pendants PIPELAY PARAMETERS ICP Product Range Sizes Material / Grade Options Nominal Size* O.D. API X65 API T95 API P110 API Q125 6 inch 168 mm 7 7 7 7 8 inch 219 mm 7 7 7 7 10 inch 273 mm 7 7 7 7 12 inch 324 mm 7 7 7 7 14 inch 356 mm 7 7 7 7 *Custom sizes available on request ICP Coating Options External Coatings Pipe Diameters 6” 8” 10” 12” 14” 3-layer Polyethylene 7 7 7 7 7 3-layer Polypropylene 7 7 7 7 7 Fusion Bonded Epoxy (FBE) 7 7 7 7 7 Dual Layer FBE 7 7 7 7 7 • Onshore pre-bonded triple joints • Max lay tension 150 MT • Lay ≤10¨pipe, ≤150 m water depths • Can lay 12” pipe in shallow water depths • Various coating options 7 7 7 7 +44 (0)118 945 0320 _________ GMC Inc 738 Hwy 6 South Suite 900 Houston, TX 77079 United States Internal Coatings Inconel Mechanical Cladding GMC Limited 100 Longwater Ave Reading, RG2 6GP United Kingdom 7 +1 832.300.1480 ABOUT GMC GMC is an industry leader in innovative engineering, project management, and installation solutions and products, from the seabed to the surface, for offshore oil and gas SURF, drilling, and production projects. Established in 1990, GMC has offices in the UK and USA. _________ [email protected] www.gmcltd.net GMC Limited © 2014 | All Rights Reserved 04/14
© Copyright 2024 ExpyDoc