Project Date Subject 01 : Installation of a 2000kVA Transformer in the Power Room of New Hangar at MIA (RFQ205) :16 October 2014 :Open Tender Clarification No.1 We (bidders) request the work plan of the new hangar construction to clarify when the transformer room is ready for use. When can the contractor install the transformer inside the transformer room? Reply:The contractor may start the installation in the PT room at the beginning of December 2014, but the exact date will be confirmed by CAM. 02 BoQ Item 2, mentioned to supply a 2000kVA transformer, however the drawing ref. TR02 mentioned 1600kVA transformer. Please clarify which transformer capacity is correct. Reply:The contractor is obligated to follow the BoQ Item 2 to supply and install a 2000kVA transformer. 03 BoQ Item 15, mentioned cable ref. Cu 5(3x1x400+1x400) and the drawings mentioned Cu 4(3x1x400+1x400). Please clarify which cable reference is correct. Reply: The contractor is obligated to follow the BoQ Item 15 to supply and install Cu 5(3x1x400+1x400) cable. 04 Please explain and clarify BoQ Item 17. In order to justify the use of 5400m of cables, to which substations do we need to lay the cables from the New Hangar? Reply:One cable is from New Hangar to SS6 and another one is from New Hangar to SS10. If the bidders have other suggestions or options, please provide for our reference. (*Options or suggestions will not be considered during the tender evaluation, options or suggestions are just for reference only) 05 According to our understanding, we need to cut the ring at two different points. One is from SS6 and the other from SS10. We would like to know the design criteria from CAM and when we are allowed to make those two cuts. Reply:The design criteria shall be equivalent to or higher than the standard of the existing cables, and the final permission for those two cuts will be confirmed by ADA. 06 Please explain and clarify BoQ Item 19, what is the main design concept to use the 11kV joints? OTF-5-A01 Reply:As the existing HV ring cables need to be cut to connect the new one, so it is required to use the 11kV cable joint to connect them. 07 Please provide more information and location for BoQ Item 18. Reply:Please refer to the Tender Document Section 8, photo P.29 – P.37. 08 For BoQ Item15, please kindly confirm whether only the cable to the LV fuse Board (QGBT) or the 3200A LV Fuse Board (QGBT) is needed. Reply:According to the BoQ Item 15, the contractor undertakes to supply and install the cable from PT room LV switch board to new hangar QGBT and is terminated to the 3200A ACB which is inside new hangar QGBT. OTF-5-A01
© Copyright 2024 ExpyDoc