DAVID E. CANTOR, PE, CCM, DBIA Project Manager PROJECT EXPERIENCE Alta Engineering Group Inc., Project Manager EXPERIENCE: Construction executive with over 20 years of engineering, construction and development experience in municipal, industrial, commercial and residential markets. Diverse project experience includes civil engineering design, construction, construction management and constructability review on subdivisions, maintenance facilities, corporation yards, airports, refineries, wineries, commercial and residential buildings and various heavy civil and rail works EDUCATION: § BS Civil Engineering, University of California, Davis, 1990 REGISTRATION: § CA Registered Professional Civil Engineer No. 51375 § CA Contractors License A & B #790346 and #987637 CERTIFICATIONS: § CCM, Certified Construction Manager § DBIA, Design Build Certified Professional § Caltrans Local Assistance R.E. Certification § Qualified SWPPP Developer & Practitioner (QSD/QSP) Certification #00196 Hopland PUD Water System, Hopland, CA Project manager for general contractor on new water distribution system for Hopland PUD. Project included approximately 2 miles of new water distribution lines in Caltrans R/W along Hwys 101 & 175, installation of mains on two bridge crossings over Russian River (bridges owned by Caltrans) and two new bolted steel water tanks plus access roads. Responsible for encroachment permit, traffic plans and bridge hanger submittals through Caltrans. Int’l Terminal Expansion / Elevated People Mover, San Francisco Int’l Airport Project engineer responsible for on-site daily coordination with field crews, Airport, PG&E, Caltrans and General Contractor Staff. Included both day and night crew work and coordination between the two crews. Project included ductile iron and welded steel pipe water mains, electrical duct banks and vault installation. Impacts with Caltrans for hwy 101/380 R/W. Managed shutdown coordination and noticing with Airport and individual Airline staff representatives. Provided shoring designs as necessary. Administer company safety program – drug testing requirements, weekly safety meetings, OSHA logs, and incident reports. Eastside Trunk Sewer, Rohnert Park, CA CM/Inspector on 48” lined RCP sewer installation. Included bore/micro tunnel under US Hwy 101 . O’Reilly Facility, Sebastopol, CA Project manager for site development and utilities for new commercial office development. Included widening of Hwy 116 and new signal installation and intersection improvements on Hwy 116. Coordination with Caltrans for permitting, signal acceptance, lane routing, and traffic closures. Ragle Ranch / SE Area Infrastructure Project, Santa Rosa, CA Project Manager for regional developer responsible for master planned project consisting of three separate subdivisions (with phased maps) and extensive off-site infrastructure construction. In total the on-site development included 433 residential units (mix of single family detached and townhome units), two apartment sites (3 buildings – 44 units), open space and parks on a total of approximately 90 acres. Off-site work included construction of a new 1.5 million gallon reservoir, new high pressure water system and pump station, approx. ¾ mile of new trunk sewer in existing streets, and widening, reconstruction and reconfiguration of approx. 1 mile of existing public streets adjacent to Sonoma County Fairgrounds requiring extensive coordination with Fairground operations. Early project activities included coordination with existing land owners and/or tenants to vacate properties, abatement David E. Cantor Project Manager of lead and asbestos materials in existing structures, and coordination with local fire and police to utilize existing structures for training exercises prior to demolition and clearing activities. West College Maintenance Facility Phase 2 & 3, Santa Rosa, CA. Construction Manager for multi-faceted project consisting of demolition of abandoned treatment plant facilities and construction of new 26,000sf administration building, 10,000sf shops building, two vehicle maintenance buildings, vehicle wash facility, reclaimed water pump station, emergency generator replacement, 450 space parking lot re-construction and all associated site utilities, grading and paving. SMART – Sonoma Marin Area Rapid Transit, Marin & Sonoma Counties, CA Assist with rail alignment reviews, budget estimating for misc. structure rehabilitations, and station facilities. Constructability reviews of Operations & Maintenance Facility preliminary design alternatives. Shell Oil Clean Fuels Project, Coke Handling Facility, Martinez, CA Project Manager for general engineering contractor responsible for managing site development and building construction for project in Shell Oil Refinery. Project included construction of a 2 story office and shops building, 40,000sf coke handling facility building foundation, truck loading and wash structures and all associated site utilities, grading, and paving. Responsibilities included all subcontracting and coordination of the various building trades associated with the building, submittal processing, punch list, final inspection, and acceptance. Also served as company safety representative coordinating with refinery staff and existing plant operations. Shell Oil Clean Fuels Project, Electrical Substation and Process Equipment Civil Contract, Martinez, CA. Project Engineer for subcontractor to Bechtel Corp. on a project involving electrical and process equipment foundations, 150-footdiameter tank foundation, and all associated underground utilities, process piping (welded steel, fiberglass, ductile) grading, and paving. Additionally, handled all QA/QC functions and served as company safety officer.
© Copyright 2024 ExpyDoc