Abstract of costing for the work “Construction of Mandir Complex” at University area, Chittagong. 1. Main Mandir Tk. 1,00,65,700/- 2. Nut Mandir Tk. 41,08,700/- 3. Academic Building Tk. 1,72,67,360/- 4. Land Development, Road, Boundary Wall, Pond etc. Tk. 73,72,240/- Total Tk. 3,51,16,000/- (Taka three Crore Fifty One Lac Sixteen Thousand Only) Detail Estimate for the work “Main Mandir” at Chittagong University Area, Chittagong. 1. Cast in Site pile a. b. c. d. e. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Pile Length – 25′0˝ No of Pile – 56 nos Dia of Pile – 18˝ Dia Stone Chips 4500 cft @ 250/- p/cft Sylhet Sand 2500 cft @ 90/- p/cft Cement 1020 Bag @ 460/- p/cft Labour (Piler and Pile Cap) L.S. M.S. Rod 20mm – 5.5 Ton @ 60,000/- p/ton 10mm – 2.5 Ton @ 60,000/- p/ton Structure and Finishing a. RCC. Works. Stone Chips 5000 cft @ 250/- p/cft Sylhet Sand 1500 cft @ 90/- p/cft Local Sand 1500 cft @ 30/- p/cft Brich chips 5200 cft @ 70/- p/cft Cement 1250 bag @ 460/- p/cft M.S rod 10mm—10 ton 12mm—3.50 ton 8mm—0.50 ton 17.50 Ton @ 60,000/20mm—2 ton 16mm—1.00 ton Labour Finishing Work 1st Clan Brick 42,000 nos @ 8,000/Picked Brick 27,000 nos @ 8,000/Cement 450 Bag @ 460/Plastering Work Local Sand 8,500 Cft @ 30/Cement 300 Bag @ 460/Labour M/C Brick work L.S. Tiles 7,500 Sft @ 100/Sand 1500 Sft @ 30/Cement 250 Bag @ 460/Labour L.S. S.S. Railing 3260 Sft Do Labour Door (Glaged) 400 Sft L.S. Door (Wooden) 484 Sft L.S. Window (Grilld Glass) 2 nos L.S. Electrification in/c light fan L.S. Painting (Illation) L.S. Collapsible Gate 442 Sft @ 500/Orientation Works L.S. Super Vision L.S. G.l., Wire, Satleet other essential materials L.S. Tk. Tk. Tk. Tk. 11,25,000/2,25,000/4,69,200/2,80,000/- Tk. Tk. Tk. 3,30,000/3,30,000/27,79,200/- Tk. Tk. Tk. Tk. Tk. 12,50,000/1,35,000/45,000/36,400/5,75,000/- Tk. 10,50,000/- Tk. 5,00,000/- Tk. Tk. Tk. 3,36,000/2,16,000/2,07,000/- Tk. 2,55,000/Tk. 1,38,000/Tk. 2,22,000/Tk. 7,50,000/Tk. 45,000/Tk. 1,15,000/Tk. 1,50,000/Tk. 1,63,000/Tk. 32,600/Tk. 60,000/Tk. 2,42,000/Tk. 22,500/Tk. 2,00,000/Tk. 1,00,000/Tk. 2,21,000/Tk. 2,50,000/Tk. 1,50,000/Tk. 20,000/Total Tk. 1,00,65,700/(One Crore Sixty Fine Thousand Seven Hundred Only) Detail Estimate for the work “Construction of a Nut Mandir” at Chittagong University Area for Sanatan Dharma Parishad, Chittagong. 1. Pre Cast pile Pile no – 80nos Size – 8˝ Dia Length – 15̒-0˝ a. Stone Chips – Pile 425 cft Do Pile Cap 468 Cft 893 cft say 1000 cft@ 250/- cft b. M.S Rod 6mm—3000 kg 12mm—600 kg 10mm—1300 kg c. Cement 225 Bag @ 460/- p/cft d. Sylhet Sand 600 cft @ 90/- p/cft e. Labour Piling Tk. 24,000/Pile Cap 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Tk. Say 5 Ton @ 60,000/- Structure and Finishing a. Stone Chips 2500 cft b. Sylhet Sand 1500 cft c. Cement 570 bag 10˝ Brick Work 1st Clam Brick 13,000 nos @ 8,000/C.C. Picked Brick 13,500 nos -DoBrick Flal Saling -Do- 14,450 nos -DoPlaster Work Local Sand (320 + 2180) = 2500 Cft @ 30/- p/Cft Cement (390 + 52) = 442 Bag @ 460/- p/cft M.S Rod 16mm—2400 kg 10mm—4500 kg 8.5 Ton @ 60,000/8mm—1600 kg S.S. Railing 672 Sft @ 500/- p/sft Construction Labour L.S. Orientation Works L.S. Electrification in/c light fan L.S. Painting L.S. Tiles Work L.S. Total 2,50,000/Tk. 3,00,000/- Tk. Tk. 1,03,500/54,000/- Tk. Tk. 28,080/7,59,580/- Tk. Tk. Tk. 6,25,000/1,35,000/2,62,200/- Tk. Tk. 1,04,000/1,08,000/Tk. 1,15,600/- Tk. Tk. 75,000/2,03,320/- Tk. 5,10,000/- Tk. Tk. Tk. Tk. Tk. 3,36,000/3,50,000/1,00,000/85,000/70,000/Tk. 2,70,000/41,08,700/- Tk. Detail Estimate for the work Five Storied Academic building for Sanatan Dharma Parishad at Chittagong University Area, Chittagong. Ground Floor A. Cast in Sit pile Pile Length – 25̒0˝ No of Pile – 72 nos Dia of Pile – 18˝ Dia Stone Chips 5600 cft @ 250/- p/cft Sylhet Sand 3000 cft @ 90/- p/cft Cement 1300 Bag @ 460/- p/cft Labour (3,60,000/- + 1,20,000/-) L.S. M.S. Rod 1371 Kg @ 60,000/- p/Kg 20mm – 10mm – B. C. Tk. Tk. Tk. Tk. Tk. 14,00,000/2,70,000/5,98,000/4,80,000/7,84,260/- Tk. 35,32,260/- Tk. Tk. Tk. Tk. 4,50,000/90,000/30,000/5,70,000/- Tk. Tk. Tk. Tk. Tk. Tk. 88,000/80,000/5,52,000/90,000/3,78,760/1,40,000/- Tk. Tk. 1,20,000/1,68,000/Tk. Tk. Tk. 1,98,000/2,50,000/Tk. Tk. Tk. 1,76,000/72,53,020/- Tk. 1,72,67,360/- Structure RCC. Works. Brick Chips 3000 cft @ 150/- p/cft Sylhet Sand 1000 cft @ 90/- p/cft Local Sand 1000 cft @ 30/- p/cft M.S. Rod 4500 Kg @ 60,000/- p/Kg Brick Work in/c Plaster 1st Clam Brick 11,000 nos @ 8,000/Picked Brick 10,000 nos @ 8,000/Cement 1200 Bag @ 460/Sand (Plastr/ B.Work) 3000 Cft @ 30/Total Raj Labour L.S. Painting L.S. D. Door & Windows Wooden Door 6nos @20,000/- each Windows (Grill & Shutter) 14nos @12,000/- each E. Sanitation & Water Supply L.S. 1,90,000/F. S.S. Railing 396 Sft L.S. G. Septic Tank & Sewage line L.S. H. S. Tubewell in/co/h tank L.S. 2,50,000/I. Electrification L.S. Total Ground Floor 1st Floor Tk. 32,20,760/2nd Floor Tk. 32,20,760/rd 3 Floor Tk. 32,20,760/4th Floor Tk. 32,20,760/Building Cost Total Essential Works To be Done Internal Road 1. Earth Work for base of the brick parement cutting/ pilling etc. L.S. in/ c land develipment 2. Brick Flat Soling 2000 sft L.S. 3. Brick on End Dging 450 sft L.S. 4. H.B.B. Soling L.S. 5. Bitumarus Carpetting in/ c Top Finishing 2000 sft L.S. 6. Gardening 580 sft L.S. Internal Drainage System 10″ Drain in/c Slab cover 360′ sft 20″ Drain in/c Slab cover 90′ sft Boundary Wall 6′ Hight 582 sft in/.c 6′-0′ etc RCC Piller & Barbed Earth/ Sand Filling Gate 2 nos Excavation of a Pond (Padma Pukur) 2nos Ghatla Total Tk. 2,54,375/- Tk. Tk. Tk. Tk. Tk. 1,54,000/13,240/1,90,000/15,60,000/1,00,000/- Tk. Tk. 4,50,000/1,80,000/- Tk. Tk. Tk. Tk. Tk. Tk. 18,35,000/19,50,000/3,10,000/2,00,000/2,30,000/73,72,240/-
© Copyright 2024 ExpyDoc