AGENCY REQUEST FOR STATE BUILDING COMMISSION ACTION MARCH 2014 AGENCY: Department of Administration on behalf of the Department of Veterans Affairs and the Wisconsin Historical Society DOA CONTACT: Mary Deering, (608) 261-2293, [email protected] DFD CONTACT: RJ Binau, (608) 267-6927, [email protected] PROJECT REQUEST: Request the release of $1,214,300 BTF-Planning to complete the predesign phase for the New Museum Complex. PROJECT NUMBER: 00D1W PROJECT DESCRIPTION: In October 2013, the SBC authorized the release of $345,000 Building Trust Funds (BTF) to continue the planning of the New Museum Complex by initiating a Visitor Experience Plan (VEP). At the October meeting, the SBC was informed that a future request would be forthcoming in early 2014 to release funds to finish the VEP. As described at that meeting, this plan is an essential initial project component and will provide the critical foundation for the subsequent design. This BTF request will fund the completion of the VEP which will include the development of interpretive plans and recommendations about exhibit, program, and support spaces. It will specify how visitors will approach, enter, and experience the museum complex. The final VEP will also address the complex challenges associated with incorporating two museums in one facility. In addition, the work funded through this request will provide the gift fundraising campaign with critical tools needed to continue fundraising efforts for the project. It will also ensure the project stays on track through continued project planning and management. PROJECT JUSTIFICATION: The VEP takes nine months to complete and must be finalized by fall 2014 in order to prepare an accurate request for the 2015-17 Capital Budget. It is important to note that both agencies are utilizing the same VEP consultant, resulting in efficiencies and savings of approximately $260,000 BTF. The New Museum Complex will serve as the new home to both the Wisconsin Historical Museum and the Wisconsin Veterans Museum in Madison. The current facilities are inadequate in size and lack the necessary environmental conditions to properly preserve collections of Wisconsin’s historical artifacts. The poor condition of the current museums negatively impacts the visiting public, limits attendance, and poses a risk to collections of significant historical and economic value. BUDGET/SCHEDULE: N/A PREVIOUS ACTION: In October 2013, the SBC approved the release of $345,000 BTF – Planning for the continued preliminary design of the New Museum Complex. AGENCY REQUEST FOR STATE BUILDING COMMISSION ACTION MARCH 2014 AGENCY: Department of Administration DOA CONTACT: Mary Deering, (608) 261-2293, [email protected] DFD CONTACT: RJ Binau, (608) 267-6927, [email protected] LOCATION: Hill Farms Building D 4702 and 4706 University Avenue Madison, WI PROJECT REQUEST: Request the following: a) Approve the Design Report; and b) Authority to construct the Hill Farms Building D Crime Lab Expansion for an estimated total cost of $5,221,700 PRSB. PROJECT NUMBER: 12D2N PROJECT DESCRIPTION: This project will renovate 11,540 GSF of vacant laboratory space at the Hill Farms Building D to expand the Department of Justice’s (DOJ) Madison Crime Laboratory – DNA Databank Program. Currently, the Madison Crime Laboratory occupies the first and second floors of the adjacent Hill Farms Building L. This project will remodel the existing layout to comply with current lab functions, building codes, and federal standards. The scope includes updates to the existing mechanical, plumbing, data/communications infrastructure; updates to the electrical infrastructure; and expansion of the existing penthouse and basement mechanical rooms to accommodate the additional equipment. The new space will contain six shared lab stations, a chemistry lab, a high-density storage room, sweeping room, extraction room, quant/post amp room, robotic room, and support spaces. PROJECT JUSTIFICATION: This project will create safe, secure, and efficient space for a modern laboratory dedicated to DNA analysis of DNA and the entry of that analysis into the local, state, and national DNA Databank. 2013 Wisconsin Act 20 expanded DOJ’s practice of DNA collection to include taking samples at the time of arrest for some felonies and serious sex-related offenses. As a result, there will be an increase in the number of DNA samples requiring analysis. Act 20 also added 26 new FTE positions to accommodate the additional workload. This expansion will provide the necessary laboratory space needed to fulfill the increased DNA collection and analysis requirements. BUDGET/SCHEDULE: Construction Design DFD Mgt Contingency Equipment TOTAL $4,030,500 $374,600 $178,600 $434,500 $203,500 $5,221,700 SBC Approval A/E Selection Design Report Bid Opening Start Construction Substantial Completion Final Completion PREVIOUS ACTION: This project was enumerated in 2013 Wisconsin Act 20 for $5,221,700 PRSB. Mar 2014 Nov 2013 Mar 2014 May 2014 Jul 2014 Feb 2015 May 2015 DESIGN REPORT DIVISION OF FACILITIES DEVELOPMENT 101 East Wilson Street, 7th Floor Post Office Box 7866 Madison, WI 53707 Hill Farms Building D Crime Lab Expansion Madison, WI Project Number: 12D2N For the: Department of Administration Project Manager: Beth Alderman Architect/Engineer: Mayer Helminiak Architects, LLC Mequon, WI Type of Project: Major Project / Remodeling 1. Project Description: This project will renovate 11,540 GSF of vacant laboratory space at the Hill Farms Building D to expand the Department of Justice’s (DOJ) Madison Crime Laboratory – DNA Databank Program. Currently, the Madison Crime Laboratory occupies the first and second floors of the adjacent Hill Farms Building L. This project will remodel the existing layout to comply with current lab functions, building codes, and federal standards. The scope includes updates to the existing mechanical, plumbing, data/communications infrastructure; updates to the electrical infrastructure; and expansion of the existing penthouse and basement mechanical rooms to accommodate the additional equipment. The new space will contain six shared lab stations, a chemistry lab, a high-density storage room, sweeping room, extraction room, quant/post amp room, robotic room, and support spaces. 2. Authorized Budget and Funding Source: This project was enumerated in 2013 Wisconsin Act 20 for $5,221,700 PRSB. 3. Schedule: Submission of Documents for Final Review: Bid Opening: Start of Construction: Substantial Completion / Occupancy: 4. Budget Summary: Construction: Design: DFD Mgt: Contingency: Equipment: Total Project Cost: $4,030,500 $374,600 $178,600 $434,500 $203,500 $5,221,700 April 2014 May 2014 July 2014 February 2015 AGENCY REQUEST FOR STATE BUILDING COMMISSION ACTION MARCH 2014 AGENCY: Department of Natural Resources DNR CONTACT: DFD CONTACT: Steve Krallis, (608) 266-0160, [email protected] RJ Binau, (608) 267-6927, [email protected] PROJECT REQUEST: Request the following: a) Authority to construct various maintenance and repair projects for an estimated total cost of $2,297,100 ($1,437,100 STWD and $860,000 FED); and b) Permit the Division of Facilities Development to adjust individual project budgets. LOCATION Blue Mound State Park – Iowa Co. Richard Bong State Recreational Area – Kenosha Co. Northern Highland American Legion State Forest- Oneida Co. TOTAL PROJ. NO. 13A1U 13E6L 13I4M PROJECT TITLE STWD FED TOTAL Pool and Splash Pad Renovation Vern Wolf Lake Dam Repair and Renovation $700,000 $700,000 $1,400,000 $284,400 N/A $284,400 Campground Connection Trail $452,700 $160,000 $612,700 $1,437,100 $860,000 $2,297,100 Blue Mound State Park – Pool and Splash Pad Renovation (13A1U): Project Description and Justification: This project will renovate the existing 40 year-old 4,000 SF pool and surrounding deck into a 2,000 SF pool with an interactive, camping-themed, 2,000 SF splash pad. The maximum pool depth will remain at four feet. An accessible route from the parking lot to the bath house will be constructed. This project will also replace existing plumbing and mechanical systems located within the pool house. The pool house’s interior spaces will be renovated to create ADA compliant restrooms, changing areas, and showers. Lockers and benches will be provided in each of the changing areas. The admissions office will also be renovated and a new well will be installed to provide a dedicated water source for the facility as the existing water line is at the end of its useful life. The current pool structure and systems are failing and requiring frequent repairs. A systems failure could occur at any point, causing the pool to close permanently. This renovation will significantly reduce the operating expenses associated with the pool while providing a much needed revenue stream for the park. Budget/Schedule: Construction Design DFD Mgt Contingency Equipment TOTAL $995,800 $111,000 $43,200 $80,000 $170,000 $1,400,000 SBC Approval Bid Opening Start Construction Substantial Completion Final Completion Mar 2014 Jul 2014 Sep 2014 Jun 2015 Dec 2015 Richard Bong State Recreation Area – Vern Wolf Lake Dam Repair and Renovation (13E6L): Project Description and Justification: This project will repair and renovate the Vern Wolf Lake Dam which will bring it into compliance with dam safety and construction administrative rule standards. Vern Wolf Lake is a 93-acre lake located in Kenosha County at the Richard Bong State Recreation Area, which is eight miles southeast of Burlington on State Highway 142. In spring 2013, the Vern Wolf Lake Dam was compromised during a series of heavy rainfall events. DNR staff conducted a successful controlled draw down, and subsequent inspections determined the dam required extensive repair and renovation. The lake has remained drained since the events. This project will restore recreational opportunities at the lake including fishing. The project scope includes a new spillway and repairs to the embankment. It constructs a new fixed crest drop inlet spillway structure and a new conduit through the existing embankment breach channel. New embankment fill will be placed to restore the breach channel and new rip rap will be placed on both the upstream and downstream sides of the spillway. Budget/Schedule: Construction Design DFD Mgt Contingency TOTAL $189,200 $48,200 $9,100 $37,900 $284,400 SBC Approval Bid Opening Start Construction Substantial Completion Final Completion Mar 2014 Jul 2014 Sep 2014 Dec 2014 Dec 2014 Northern Highland American Legion State Forest – Campground Connection Trail (13I4M): Project Description and Justification: This project will construct a new paved trail to connect three campgrounds within the Northern Highland American Legion State Forest (NHAL). The new trail will incorporate existing trails, woods, and roads, and will avoid the old railway grade which is part of the snowmobile trail system. The new trail will be approximately five miles long, starting at Indian Mounds Campground on State Highway 47, going through Clear Lake Campground on Woodruff Road, and connecting to existing bike lanes at County Highway J to provide access to the Carrol Lake Campground. The NHAL consists of 316,965 acres and is located in parts of Oneida, Vilas, and Iron Counties. It is the busiest multiple use recreation area in the state with over two million users per year. This project will greatly improve safety for bicyclists and pedestrians traveling between campgrounds or to local businesses. Currently, there are no official crossings on State Highway 47 or bike lanes on Woodruff Road. Budget/Schedule: Construction DFD Mgt Contingency Other Fees TOTAL $522,900 $23,100 $52,300 $14,400 $612,700 SBC Approval Bid Opening Start Construction Substantial Completion Final Completion Mar 2014 May 2014 Jun 2014 Sep 2014 Jan 2015 CORRESPONDENCE/MEMORANDUM DATE: March 5, 2014 TO: Summer R. Strand, Secretary State Building Commission FROM: Dan Olson, Chief Facilities Management Department of Natural Resources State of Wisconsin SUBJECT: Stewardship Small Project Release The Department of Natural Resources, in cooperation with the Department of Administration, requests the release of $250,000 Stewardship Property Development funds authorized under s. 20.866 (2) (ta), Wis. Stats. This $250,000 will be used for the Friends groups and nonprofit conservation organizations (NCO) match grants authorized under s. 23.098, Wis. Stats. If approved, bonding will be provided as a grant. The Friends groups and NCOs are authorized to receive up to $250,000 in matching funds each fiscal year for projects at DNR properties. No individual project can exceed $20,000 in a fiscal year. There will be only one round of Friends groups and NCO applications this fiscal year. A total of 19 Friends groups and NCO projects with a total of $237,373 in Stewardship matching grants have been approved (see attached). The total estimated cost of 2014 projects is $677,288. If in any year the total requested does not equal or exceed $250,000, any remaining balance to the Stewardship matching funds will revert to the general property development category of the Stewardship program. Friends Groups Knowles-Nelson Stewardship Grants 2014 Project Friends Groups/NCO Property Project Total 2014 Cost Cash In-Kind 1 Friends of Aztalan State Park Aztalan State Park Conceptual Design for Visitor Center $ 40,000 $ 20,000 2 Friends of Council Grounds Council Grounds State Park Beach Shelter $ 27,296 $ 12,553 $ 3 Friends of Crex Crex Meadows Crex Meadows Kitchen Upgrades $ 40,000 4 Friends of Harrington Beach Harrington Beach State Park Accessible Cabin - Interior Construction 5 Heritage Hills Foundation Heritage Hills State Park 6 Friends of High Cliff State Park High Cliff State Park 7 Friends of Horicon Marsh 8 Ice Age Alliance 9 Grant $ Requested $ 20,000 1,095 $ 13,648 $ 20,000 $ 20,000 $ 40,000 $ 20,000 $ 20,000 Fort Howard Guardhouse Accessible Ramp $ 26,700 $ 13,350 $ 13,350 General Store Floor and Foundation Upgrades $ 40,000 $ 20,000 $ 20,000 Horicon Marsh Information Kiosk and Entryway Redesign $ 32,800 $ 16,400 $ 16,400 Ice Age Trail Mobile Skills Crew Program - Trail Construction $ 241,801 $ 138,063 $ 83,738 $ 20,000 Kettle Moraine Natural History KMSF- SU Association Scuppernong Springs Prairie Restoration $ 40,000 $ 20,000 $ 20,000 10 Friends of Kohler-Andrae Kohler-Andrae State Park Ancient Shores Trail - Boardwalk and Signs $ 15,000 $ 7,500 $ 7,500 11 Friends of Kohler-Andrae Kohler-Andrae State Park $ 10,000 $ 5,000 $ 5,000 12 Friends of Lapham Peak Lapham Peak $ 15,000 $ 7,500 $ 7,500 13 Friends of Lapham Peak Lapham Peak $ 15,000 $ 7,500 $ 7,500 14 Friends of Lapham Peak 15 Friends of Mirror Lake Lapham Peak Mirror Lake State Park $ 10,000 $ 5,691 $ $ 2,500 $ 2,500 $ 2,500 $ 716 $ 5,000 2,475 $ 18,000 $ 9,000 $ 9,000 $ 40,000 $ 20,000 $ 20,000 $ 5,000 $ 2,500 $ 2,500 $ 15,000 $ 7,500 $ 7,500 $ 677,288 $ 351,866 16 17 18 19 Friends of Navarino Nature Center Friends of Peninsula State Park Friends of Red Cedar State Trail & Hoffman Hills Friends of Rock Island Navarino Wildlife Area Peninsula State Park Red Cedar Trail Rock Island State Park Invasive Species Removal and Habitat Restoration Snowmaking Pump & Controls Butterfly Garden Accessibillity Improvements & Nature Center Exhibits South Hill Invasive Species Removal Construct Firewood Shed at Office Energy Conservation Building Improvements Siding Upgrades Nature Center Renovation - Center Design and Sewer Line Upgrade Depot Visitor Center Upgrades - Parking and Service Window Lighthouse Exterior Preservation Painting Trim $ 88,049 $ 237,373 AGENCY REQUEST FOR STATE BUILDING COMMISSION ACTION MARCH 2014 AGENCY: Department of Veterans Affairs DVA CONTACT: DFD CONTACT: Susan Mattix, (608) 264-6093, [email protected] RJ Binau, (608) 261-2435, [email protected] PROJECT REQUEST: Request the following: a) Authority to construct various renovation projects for an estimated total cost of $6,494,000 ($2,455,900 GFSB – Programmatic Remodeling and Renovation; $2,388,100 PRSB; $1,500,000 FED; and $150,000 Agency Cash); b) Transfer all approved GFSB All Agency allocation to the Department of Veterans Affairs Infrastructure appropriation; and c) Permit the Division of Facilities Development to adjust individual project budgets. LOCATION Wisconsin Veterans Home at Union GroveRacine Co. Wisconsin Veterans Home at Union GroveRacine Co. TOTAL PROJ. NO. 13A2M 12L2L PROJECT TITLE GFSB FED PRSB Shemanske Hall Renovation - New Community Based Outpatient Clinic Above-Ground Building Connectors $1,170,000 $1,500,000 N/A Agency Cash $150,000 $1,285,900 N/A $2,388,100 N/A $2,455,900 $1,500,000 $2,388,100 $150,000 TOTAL $2,820,000 $3,674,000 $6,494,000 Wisconsin Veterans Home at Union Grove - Shemanske Hall Renovation- New Community Based Outpatient Clinic (13A2M): Project Description and Justification: This project will renovate space at Shemanske hall to create a new Community Based Outpatient Clinic (CBOC). The CBOC will have spaces for admissions, patient exams, public toilets, offices, a conference room, a break/locker room, storage, and video communications with physicians at regional clinics and hospitals. Renovation work will include the demolition of walls, plumbing and electrical fixtures, wiring and piping, flooring, and ceilings. Construction consists of new walls, ADA-compliant rest rooms, data and telephone lines, security, lighting, ceilings, flooring, and an emergency generator. In April 2012, the US DVA announced that it was accepting Request for Lease Proposals for the relocation of the CBOC currently in Wallace Hall at Union Grove. The Wisconsin DVA’s proposal to house the new CBOC at Shemanske Hall was accepted. As a result of that award, this project will renovate Shemanske Hall to accommodate the new CBOC. Budget/Schedule: Construction Design DFD Mgt Contingency TOTAL $2,276,700 $215,400 $100,200 $227,700 $2,820,000 SBC Approval A/E Selection Bid Opening Start Construction Substantial Completion Mar 2014 Aug 2013 Apr 2014 May 2014 Aug 2014 Wisconsin Veterans Home at Union Grove – Above-Ground Building Connectors (12L2L): Project Description and Justification: This project will construct new enclosed connectors that will provide over 700 linear feet of secure and environmentally controlled space for member mobility and access to staff for care, food, laundry, and other supporting operations. Work includes selected demolition at points of connection to existing buildings, construction of new foundations, walls, and roof. Interior systems include Wi-Fi and cellular amplification, nurse call pull stations, emergency telephone, security cameras, wander guard member monitoring, lighting, ceilings, flooring, and hand rails. Space includes sitting areas and access to outdoors. When work is completed, Shemanske Hall, Fairchild Hall, and Gates Hall will be interconnected with Maurer Hall and Boland Hall. DVA will submit a grant application to the USDVA State Homes Construction Grant Program. If awarded, the federal grant will cover up to 65% of construction. Budget/Schedule: Construction Design DFD Mgt Contingency Other Fees Equipment TOTAL $2,790,000 $274,600 $120,600 $223,200 $9,800 $255,800 $3,674,000 SBC Approval A/E Selection Bid Opening Start Construction Substantial Completion Final Completion Mar 2014 Jan 2013 Jun 2014 Jul 2014 Dec 2014 Feb 2015 UNION GROVE - VETERAN’S HOME Building Connectors Preliminary Schematic Schemanske Boland Mauer Fairchild Gates Project #12L2L Existing Connectors STATE OF WISCONSIN DEPARTMENT OF VETERANS AFFAIRS AGENCY REQUEST FOR STATE BUILDING COMMISSION ACTION MARCH 2014 AGENCY: University of Wisconsin System UWSA CONTACT: DFD CONTACT: Alex Roe, (608) 265-0551, [email protected] RJ Binau, (608) 267-6927, [email protected] LOCATION: UW-La Crosse, La Crosse County PROJECT REQUEST: Request the following: a) Authority to purchase an approximate 0.19 acre parcel of land and improvements known as the Fairgrounds Substation for $30,000 GFSB-Land and Property Acquisition; b) Authority to construct a 15kV Switchgear project for an estimated total cost of $4,530,000 ($2,491,500 GFSB − Utility Repair and Renovation and $2,038,500 PRSB); and c) Transfer all approved GFSB All Agency allocation to the UW Infrastructure Maintenance appropriation. PROJECT NUMBER: 13A2S PROJECT DESCRIPTION: This project will purchase the approximately 0.19 acre Fairgrounds Substation property from Xcel Energy located within the campus boundary between the Heating Plant and Mitchell Hall. Two independent appraisals were conducted and established a fair market property value of $35,000. Xcel Energy has agreed to sell the property for $30,000. Once the sale is completed, the substation’s existing antiquated equipment will be removed and replaced with new state-owned 15kV service switchgear, two 7,500 kVA transformers, and two capacitor banks. A brick veneer screen wall will be constructed around the perimeter of the substation. Also, this project will replace the campus 5kV electrical switchgear. A new main-tiemain 5kV circuit breaker line-up will be installed including 13 branch circuit breakers, metering cubicles, auxiliary power cubical, and DC control power supply. New electrical metering will be installed on the electrical service at each individual campus building and connected to the campus building automation system. Lastly, the project will construct new power conduit and signal conduit ductbanks to four existing service pits. A new 5kV looped power cable will be installed from the new 5kV switchgear to pit P22. PROJECT JUSTIFICATION: The purchase of the substation and the replacement of the antiquated equipment will allow the campus to purchase power at a 15kV bulk primary rate. This will result in an annual utility cost savings of about 2% or approximately $28,600 per year based on current electrical rates and current campus electrical usage. The existing open energized buss structures will be eliminated to afford greater electrical safety. Replacement of transformers in the same general location will avoid the high cost of conduit and power cable relocation. The existing switchgear was installed in 1967. This switchgear has reached the end of its useful life and repair parts are difficult to obtain. The installation of a main-tie-main configuration switchgear served by two utility feeds provides needed reliability and redundancy. Enhanced building electrical metering connected to the campus automation system is needed to collect and compile building specific energy use data to better manage energy use. Over the next four years, a new student union, a new chiller, and a new science lab building will be constructed on the campus and the current distribution system lacks the capacity to provide an uninterrupted power supply to these new structures. BUDGET/SCHEDULE: Construction Design DFD Mgt Contingency Other Fees Land Acquisition TOTAL PREVIOUS ACTION: None. $3,508,600 $308,000 $161,600 $526,800 $25,000 $30,000 $4,560,000 SBC Approval A/E Selection Bid Opening Start Construction Substantial Completion Final Completion Mar 2014 Feb 2013 Jul 2014 Aug 2014 Jun 2016 Sep 2016 SUBSTATION PROPERTY CAMPUS BOUNDARY AGENCY REQUEST FOR STATE BUILDING COMMISSION ACTION MARCH 2014 AGENCY: University of Wisconsin System UWSA CONTACT: DFD CONTACT: Alex Roe, (608) 265-0551, [email protected] RJ Binau, (608) 267-6927, [email protected] LOCATION: UW-Madison, Dane County PROJECT REQUEST: Request the following: a) Approve the Design Report; and b) Authority to construct the Alumni Park project for an estimated total cost of $8,000,000 Gift Funds. PROJECT NUMBER: 13L1B PROJECT DESCRIPTION: This project will create a 1.6 acre green space known as Alumni Park that will run from Langdon St. north to the shore of Lake Mendota, east of the Memorial Union, and connect to the east edge of the Below Alumni Center. The plaza area of the park will include alumni recognition spaces, landscape plantings, seating and gathering areas, and iconic University images. Loading dock operations for the Memorial Union, Red Gym, and Pyle Center will be relocated below grade – beneath a portion of what is currently Lot 1. The design and construction of Alumni Park, the loading dock, and proposed adjacent program space must be completed concurrently to integrate the systems and landscape features. PROJECT JUSTIFICATION: The 2005 Campus Master Plan designated this area for redevelopment, calling for additional green space at the Lot 1 and plaza development between the Red Gym and the Memorial Union. In 2010, the Wisconsin Alumni Association approached UW-Madison with a proposal to implement the master plan recommendation by creating a space to foster social activity and celebrate the positive impact that the university and its graduates have made around the world. BUDGET/SCHEDULE: Construction Design DFD Mgt Contingency Equipment Other Fees TOTAL $5,920,000 $707,000 $272,000 $415,000 $579,000 $107,000 $8,000,000 SBC Approval Bid Opening Start Construction Substantial Completion Final Completion Mar 2014 Jan 2015 Apr 2015 Jun 2017 Sep 2017 PREVIOUS ACTION: This project was enumerated in 2011 Wisconsin Act 32 for $8,000,000 Gift Funds as the Alumni Plaza project. DESIGN REPORT DIVISION OF FACILITIES DEVELOPMENT 101 East Wilson Street, 7th Floor Post Office Box 7866 Madison, WI 53707 Alumni Park University of Wisconsin-Madison Madison, WI Project Number: 13L1B For the: University of Wisconsin System Project Manager: Erik Sande Architect/Engineer: Uihlein/Wilson Architects (in Association with Moody-Nolan) Milwaukee, Wisconsin Type of Project: Major Project / New Construction / Remodeling 1. Project Description: This project will create a 1.6 acre green space known as Alumni Park that will run from Langdon St. north to the shore of Lake Mendota, east of the Memorial Union, and connect to the east edge of the Below Alumni Center. The plaza area of the park will include alumni recognition spaces, landscape plantings, seating and gathering areas, and iconic University images. Loading dock operations for the Memorial Union, Red Gym, and Pyle Center will be relocated below grade – beneath a portion of what is currently Lot 1. The design and construction of Alumni Park, the loading dock, and proposed adjacent program space must be completed concurrently to integrate the systems and landscape features. 2. Authorized Budget and Funding Source: This project was enumerated in 2011 Wisconsin Act 32 for $8,000,000 Gift Funds as the Alumni Plaza project. 3. Schedule: Submission of Documents for Final Review: Bid Opening: Start of Construction: Substantial Completion / Occupancy: 4. Budget Summary: Construction: Design: DFD Mgt: Contingency: Equipment: Other Fees: Total Project Cost: $5,920,000 $707,000 $272,000 $415,000 $579,000 $107,000 $8,000,000 October 2014 January 2015 April 2015 June 2017 Alumni Park 11.11.2013 AGENCY REQUEST FOR STATE BUILDING COMMISSION ACTION MARCH 2014 AGENCY: University of Wisconsin System UWSA CONTACT: DFD CONTACT: Alex Roe, (608) 265-0551, [email protected] RJ Binau, (608) 267-6927, [email protected] LOCATION: UW-Madison, Dane County PROJECT REQUEST: Request the following: a) Approve the Design Report; b) Authority to increase the project budget of Phase II of the Memorial Union Renovation project by $4,500,000 Gift Funds; c) Authority to construct Phase II of the Memorial Union Renovation project for an estimated total cost of $46,585,000 ($30,000,000 Gift Funds; $9,000,000 PRSB; and $7,585,000 PR-Cash). PROJECT NUMBER: 09K1K PROJECT DESCRIPTION: This project is the second and final phase of a renovation to the Memorial Union. This renovation will improve the building’s functionality, circulation, life safety, and service functions. Phase II will construct 26,599 GSF of new space and renovate 119,227 GSF of existing space in the central and east wings of the Memorial Union. A majority of the work addresses the building infrastructure, including installation of new fire protection/alarm systems, and a major upgrade/ replacement of all MEP systems. Work on the exterior envelop includes replacement of deteriorated roofs, curtain walls, selective exterior masonry, and terra cotta. Food service venues will be upgraded and replaced and a new service elevator will be installed. Hazardous materials will be abated and life safety/security systems will be upgraded. Restroom and path of travel improvements will be made to meet current ADA requirements. The new space will consist of a small addition for mechanical, electrical, and life safety systems, a new exit stair, and a new underground loading dock to serve the Memorial Union, Red Gym, and Pyle Center. Finally, Phase II will renovate the Memorial Union Terrace, providing improvements to meet ADA requirements, manage storm water, and upgrade site circulation and lighting. The additional $4,500,000 in Gift Funds will renovate the Rathskeller and servery, the Trophy Room, Tripp Commons, and seven other meeting rooms in the east wing. It will also fund a specialized system of soil retention required for the construction of the below-grade loading dock. PROJECT JUSTIFICATION: The 224,500 GSF Memorial Union was completed in 1928. The building welcomes more than five million people a year, and is second only to the State Capitol in its number of out-of-town visitors. More than 21,000 meetings and functions are held each year, ranging from student groups to wedding receptions and large conferences. The Wisconsin Union Directorate also produces more than 1,000 student led programs and events, in addition to the thousands of Hoofer classes, trips, meetings, and boat use. With no substantial renovation of infrastructure in these wings since the building was initially constructed, the plumbing, mechanical, and electrical systems are long past their usable life and in need of replacement. The basic building systems are antiquated and not flexible enough to meet the facility’s multi-purpose use requirements. Fire, life safety, and security systems fall short of current standards. Existing food service production facilities and back of house support facilities are either not present in the building or contain deficiencies that negatively affect the Union’s quality of service. The basement production kitchen is in need of upgrades and space reconfiguration. Production storage areas are not close to the spaces they serve and the existing service elevator in the east wing is undersized. BUDGET/SCHEDULE: Construction Design DFD Mgt Contingency Equipment Other Fees TOTAL $37,056,000 $3,224,000 $1,607,000 $2,503,000 $1,652,000 $543,000 $46,585,000 SBC Approval A/E Selection Design Report Bid Opening Start Construction Substantial Completion Final Completion Mar 2014 Mar 2010 Mar 2014 Jan 2015 Apr 2015 Jun 2017 Sep 2017 PREVIOUS ACTION: This project was enumerated in 2013 Wisconsin Act 20 for $42,085,000 ($9,000,000 PRSB; $7,585,000 PR-Cash; and $25,500,000 Gift Funds). DESIGN REPORT DIVISION OF FACILITIES DEVELOPMENT 101 East Wilson Street, 7th Floor Post Office Box 7866 Madison, WI 53707 Memorial Union Renovation Phase II UW-Madison Madison, WI Project Number: 09K1K For the: University of Wisconsin System Project Manager: Erik Sande Architect/Engineer: Uihlein/Wilson Architects (in Association with Moody-Nolan) Milwaukee, Wisconsin Type of Project: Major Project / New Construction / Remodeling 1. Project Description: This project is the second and final phase of a renovation to the Memorial Union. This renovation will improve the building’s functionality, circulation, life safety, and service functions. Phase II will construct 26,599 GSF of new space and renovate 119,227 GSF of existing space in the central and east wings of the Memorial Union. A majority of the work addresses the building infrastructure, including installation of new fire protection/alarm systems, and a major upgrade/ replacement of all MEP systems. Work on the exterior envelop includes replacement of deteriorated roofs, curtain walls, selective exterior masonry, and terra cotta. Food service venues will be upgraded and replaced and a new service elevator will be installed. Hazardous materials will be abated and life safety/security systems will be upgraded. Restroom and path of travel improvements will be made to meet current ADA requirements. The new space will consist of a small addition for mechanical, electrical, and life safety systems, a new exit stair, and a new underground loading dock to serve the Memorial Union, Red Gym, and Pyle Center. Finally, Phase II will renovate the Memorial Union Terrace, providing improvements to meet ADA requirements, manage storm water, and upgrade site circulation and lighting. The additional $4,500,000 in Gift Funds will renovate the Rathskeller and servery, the Trophy Room, Tripp Commons, and seven other meeting rooms in the east wing. It will also fund a specialized system of soil retention required for the construction of the below-grade loading dock. 2. Authorized Budget and Funding Source: This project was enumerated in 2013 Wisconsin Act 20 for $42,085,000 ($9,000,000 PRSB; $7,585,000 PR-Cash; and $25,500,000 Gift Funds). 3. Schedule: Submission of Documents for Final Review: Bid Opening: Start of Construction: Substantial Completion / Occupancy: October 2014 January 2015 April 2015 June 2017 4. Budget Summary: Construction: Design: DFD Mgt: Contingency: Equipment: Other Fees: Total Project Cost: $37,056,000 $3,224,000 $1,607,000 $2,503,000 $1,652,000 $543,000 $46,585,000 Memorial Union/Alumni Park MUR Phase II Alumni Park 11.11.2013 AGENCY REQUEST FOR STATE BUILDING COMMISSION ACTION MARCH 2014 AGENCY: University of Wisconsin System UWSA CONTACT: DFD CONTACT: Alex Roe, (608) 265-0551, [email protected] RJ Binau, (608) 267-6927, [email protected] LOCATION: UW-Oshkosh, Winnebago County PROJECT REQUEST: Request the following: a) Authority to accept a gift-in-kind of the Alumni Welcome and Conference Center valued at $7,800,000; and b) Authority to release $4,600,000 ($3,100,000 Gift Funds and $1,500,000 PR-Cash) to the UW-Oshkosh Foundation. PROJECT NUMBER: 12L1Q PROJECT DESCRIPTION: This request is to accept a gift-in-kind from the UW-Oshkosh Foundation. The gifted land and newly constructed improvements will serve as the Alumni Welcome and Conference Center for the UW-Oshkosh campus. The new facility includes meeting rooms and banquet facilities, and will house several outreach functions including the UW-Oshkosh Foundation, Alumni Affairs, the Business Success Center, and Conference and Event Services. In addition, a satellite Admissions Office will be relocated to this new building. The construction connected the structure to the campus sewer, water distribution lines, and electric/telecommunications duct bank. The building’s functionality includes connectivity to the campus network, telecommunications system, including voice over internet protocol capabilities, wireless access, security cameras, and an emergency notifications/clock system. The brick and stone building is compatible in design with the Student Recreation and Wellness Center to the north and the Gruenhagen Conference Center to the east. This request also seeks the release of $4.6 million to the UW-Oshkosh Foundation. The “gift funds” are the remainder of the insurance settlement from the River Center flood discussed below. These funds represent the amount the State agreed to pay for the construction of the new facility. The building was constructed in compliance with Wis. Stat. s. 16.85 (12) regarding buildings constructed for UWS. PROJECT JUSTIFICATION: This building replaces the River Center which was built in 1967, and contained 51,596 GSF of space on two levels. It was rendered unusable after a flooding incident in June 2008. In February 2012, the SBC authorized the use of $693,000 from the insurance settlement to demolish the River Center. After much investigation regarding the damage to the River Center, it was determined that a new building would create a signature front door to the campus and restore conference room space lost in the flood. In addition, the ability to incorporate an alumni and public presence with conferencing capabilities will serve the campus well in the future. BUDGET/SCHEDULE: N/A PREVIOUS ACTION: The funding for the state’s share of this project was appropriated in 2013 Wisconsin Act 20 for $4,600,000 ($3,100,000 Gifts and $1,500,000 PR-Cash). AGENCY REQUEST FOR STATE BUILDING COMMISSION ACTION MARCH 2014 AGENCY: University of Wisconsin System UWSA CONTACT: DFD CONTACT: Alex Roe, (608) 265-0551, [email protected] RJ Binau, (608) 267-6927, [email protected] LOCATION: UW-Whitewater, Walworth County PROJECT REQUEST: Request the following: a) Approve the Design Report; and b) Authority to construct the Student Success Center Addition to Laurentide Hall for an estimated total cost of $4,500,000 GFSB ($2,500,000 GFSB and $2,000,000 ExistingGFSB). PROJECT NUMBER: 10B1X PROJECT DESCRIPTION: This project will construct a three-story 18,390 GSF addition to Laurentide Hall (formerly Carlson Hall). The addition will house Campus Tutorial Services. The first floor of the addition will include one Supplemental Instruction (SI) Computer lab, and two Large Group SI labs; the second floor will include a Tutoring Center, Supplemental Instruction Lab, work room and collaboration room; and the third floor will contain three Large Group SI rooms, one computer lab, two collaboration rooms, an SI Lab, and the Director’s Office. The three-story addition will include two entrances one of which connects the addition to Laurentide Hall, a separate elevator, and two stair wells servicing the addition. Separate restrooms will be provided in the addition to accommodate students. The exterior enclosure is designed to match the exterior of Laurentide Hall. Chilled water, hot water, electrical service, and the fire protection systems will be extended from the existing building. The heating and cooling system will be a stand-alone system with an indoor air-handling unit and VAV units for auxiliary zone heating. Site work will include an extension of the existing pedestrian walkways, parking lot modifications, landscaping, and connections to domestic water, sanitary, and storm systems. PROJECT JUSTIFICATION: Since the 1970s, Campus Tutorial Services has been housed in the basement of McCutchan Hall, an old residence hall that was converted into office space. This location provides only 5,307 SF for the entire tutoring program and it lacks the visibility, accessibility, air conditioning, technology, and available space for the rapidly growing program. Campus Tutorial Services offers academic assistance and enrichment for undergraduate and graduate students at UW-Whitewater by utilizing a peer-driven, cooperative learning model. There is no cost for using the services. This support increases the retention of freshman and sophomores, and the ability to deliver tutoring services. Campus Tutorial Services supports student success and increased graduation rates, and reinforces essential learning outcomes. During the past four years, the program has seen a more than a 200% percent increase of tutors employed and students served. In the fall of 2012, UW-Whitewater received a UW System Growth Agenda for Wisconsin grant to help support the Pathways for Success program, which will also utilize the Student Success Center. BUDGET/SCHEDULE: Construction Design DFD Mgt Contingency Equipment Other Fees TOTAL $3,583,000 $335,000 $154,000 $265,000 $156,000 $7,000 $4,500,000 SBC Approval A/E Selection Design Report Bid Opening Start Construction Substantial Completion Final Completion Feb 2014 Jun 2010 Mar 2014 Jul 2014 Sep 2014 Jul 2015 Dec 2015 PREVIOUS ACTION: This project was enumerated in 2013 Wisconsin Act 20 for $4,500,000 ($2,500,000 GFSB and $2,000,000 Existing-GFSB). DESIGN REPORT DIVISION OF FACILITIES DEVELOPMENT 101 East Wilson Street, 7th Floor Post Office Box 7866 Madison, WI 53707 Student Success Center Addition to Laurentide Hall University of Wisconsin-Whitewater Whitewater, WI Project Number: 10B1X For the: University of Wisconsin Project Manager: Wendy von Below Architect/Engineer: Strang, Inc. Madison, Wisconsin Type of Project: New Construction / Remodeling 1. Project Description: This project will construct a three-story 18,390 GSF addition to Laurentide Hall (formerly Carlson Hall). The addition will house Campus Tutorial Services. The first floor of the addition will include one Supplemental Instruction (SI) Computer lab, and two Large Group SI labs; the second floor will include a Tutoring Center, Supplemental Instruction Lab, work room and collaboration room; and the third floor will contain three Large Group SI rooms, one computer lab, two collaboration rooms, an SI Lab, and the Director’s Office. The three-story addition will include two entrances one of which connects the addition to Laurentide Hall, a separate elevator, and two stair wells servicing the addition. Separate restrooms will be provided in the addition to accommodate students. The exterior enclosure is designed to match the exterior of Laurentide Hall. Chilled water, hot water, electrical service, and the fire protection systems will be extended from the existing building. The heating and cooling system will be a stand-alone system with an indoor air-handling unit and VAV units for auxiliary zone heating. Site work will include an extension of the existing pedestrian walkways, parking lot modifications, landscaping, and connections to domestic water, sanitary, and storm systems. 2. Authorized Budget and Funding Source: This project was enumerated in 2013 Wisconsin Act 20 for $4,500,000 ($2,500,000 GFSB and $2,000,000 Existing-GFSB). 3. Schedule: Submission of Documents for Final Review: Bid Opening: Start of Construction: Substantial Completion / Occupancy: May 2014 July 2014 September 2014 July 2015 4. Budget Summary: Construction: Design: DFD Mgt: Contingency: Equipment: Other Fees: Total Project Cost: $3,583,000 $335,000 $154,000 $265,000 $156,000 $7,000 $4,500,000 AGENCY REQUEST FOR STATE BUILDING COMMISSION ACTION MARCH 2014 AGENCY: University of Wisconsin System UWSA CONTACT: Alex Roe, (608) 265-0551, [email protected] DFD CONTACT: RJ Binau, (608) 267-6927, [email protected] LOCATION: UW System, Statewide PROJECT REQUEST: Request the following: a) Authority to construct various maintenance and repair projects for an estimated total cost of $9,521,700 ($506,800 GFSB – Facility Maintenance and Repair; $1,081,300 GFSB – Utility Repair and Renovation; $3,973,500 PRSB; and $3,960,100 Cash); b) Transfer all approved GFSB All Agency allocations to the UW Infrastructure Maintenance appropriation; and c) Permit the Division of Facilities Development to adjust individual project budgets. FACILITY MAINTENANCE AND REPAIR INST PROJ. NO. PROJECT TITLE MIL 14A2Z Chemistry Bldg Loading Dock Drive Replacement $ FM&R SUBTOTALS $ HEALTH, SAFETY, AND ENVIRONMENTAL PROTECTION INST PROJ. NO. PROJECT TITLE MSN 14A2M Campus Arc Flash Hazard Analysis $ HS&E SUBTOTALS $ UTILITY REPAIR AND RENOVATION INST PROJ. NO. PROJECT TITLE GBY 13H1P Soccer Field Lighting Replacement MSN 13L2L Camp Randall IT Infrastructure Upgrade MSN 13K2J Langdon St. Utility Renovation UR&R SUBTOTALS GFSB 506,800 $ 506,800 $ PRSB GFSB PRSB - $ $ GFSB $ $ $ $ MARCH 2014 TOTALS $ - $ $ CASH GIFT/GRANT - $ - $ - $ $ TOTAL 506,800 506,800 - $ $ CASH GIFT/GRANT 2,187,700 $ 2,187,700 $ - $ $ TOTAL 2,187,700 2,187,700 $ $ $ $ 3,973,500 3,973,500 $ $ $ $ CASH 358,000 1,014,500 399,900 1,772,400 GIFT/GRANT $ $ $ $ - $ $ $ $ TOTAL 358,000 4,988,000 1,481,200 6,827,200 GFSB 1,588,100 $ PRSB 3,973,500 $ CASH GIFT/GRANT 3,960,100 $ - $ TOTAL 9,521,700 1,081,300 1,081,300 PRSB PROJECT DESCRIPTION: Facility Maintenance and Repair MIL – 14A2Z – Chemistry Building Loading Dock Drive Replacement ($506,800): This project replaces the concrete loading dock service drive to the Chemistry Building. Project work includes site preparation, demolition and removal of approximately 22,000 SF of reinforced concrete pavement, repair and augmentation of underground storm water system as required, installation of approximately 22,000 SF of new reinforced concrete pavement, and application of new pavement markings and striping. The loading dock service drive serving the Chemistry Building is in poor condition with significant cracked pavement and heaved pavement sections in multiple locations. Previous concrete pavement patching was completed, but those repairs are now also damaged and further patching procedures are not cost effective. Health, Safety, and Environmental Protection MSN – 14A2M – Campus Arc Flash Hazard Analysis ($2,187,700): This project surveys, provides analysis, and installs arc flash labeling for building electrical equipment in UW-Madison facilities. Occupational Safety and Health Administration (OSHA) regulations require all persons working on energized electrical equipment to read equipment labels and follow the safety guidelines included in National Fire Protection Association (NFPA) 70E. Project work includes providing engineering services required for an electrical arc flash hazard analysis of approximately 13.5 million gross square feet of space in approximately 210 buildings on the UW-Madison campus, and approximately 305 off-campus buildings. Offcampus facility locations include the Arboretum, Trout Lake Research Station, Charmany Farm, etc. NFPA 70E requires facility owners to perform an arc flash hazard analysis prior to allowing a worker to perform a task on energized equipment. The National Electrical Code (NEC) mandates that a warning label must be placed on electrical equipment that may remain energized during maintenance or repair. Equipment that needs to be labeled includes switchboards, panel boards, control panels, and motor control centers. In order to print the label for each piece of equipment, an analysis is needed to determine the thermal energy hazard possible from an arc flash. OSHA requires that employers protect employees from workplace hazards. If OSHA is called in following an incident, they will determine if compliance with NFPA 70E would have prevented or lessened the injury and they may cite the employer for not using NFPA 70E to protect their employees. The effects of an electrical arcing fault can be devastating. The intense thermal energy can cause severe burns in a fraction of a second to faculty, staff, and students who are exposed to live electrical equipment. Other considerations include loss of life, potential litigation fees, loss of process and research, potential fines, and escalation of insurance premiums. A hazardous arc flash can occur in any electrical device, regardless of voltage, in which the energy is high enough to sustain an arc. Utility Repair and Renovation GBY – 13H1P – Soccer Field Lighting Replacement ($358,000): This project replaces the structurally compromised field lighting system with a new system that is more energy efficient and provides adequate illumination levels on the soccer field. Project work includes replacement of six lighting poles, forty-eight sports lighting fixtures, the associated underground wiring, and lighting controls. The new lighting system will provide a minimum of 50 foot-candles on the playing field as recommended by the Illuminating Engineering Society of North America guidelines. The new system will provide required illumination with minimum energy demand while minimizing light trespass and light pollution. The project will also install a field sound system capable of providing adequate audio signal level for events. Once completed, the lighting system will meet NCAA Division 1 standards. In May 2013, the six 1968 vintage wooden lighting poles were inspected to determine their structural integrity. The inspection report certified that three of the poles were structurally compromised, due to severe longitudinal cracking and exterior rotting around the bases. The condition of these poles presents a significant danger and must be replaced. The other three poles were certified to be sound, but the inspection report recommended these poles should be inspected more frequently due to their age and exterior characteristics. The university determined that it would be best to remove the poles prior to the fall sports season, with the understanding that games would need to be played during daylight hours. The six poles have been removed. MSN – 13L2L – Camp Randall Information Technology Infrastructure Upgrade ($4,988,000): This project will construct the structured cabling and power infrastructure necessary to support full Wi-Fi and video screen distribution throughout the fan areas of Camp Randall stadium, including seating bowls, boxes, and concourses. The project includes the installation of wire, conduit, and electric power sources. A study of wireless access point density and coverage was completed to confirm the number and placement of wireless access points. This project will construct five telecommunications intermediate distribution frame (IDF) rooms and modestly upgrade all other exiting IDF rooms to accommodate the increased cabling. The structured cabling will tie into the video distribution and media management that will be located in the Kohl Center. UW-Madison is issuing a separate Request for Proposals to procure all the necessary end- use electronic components including the Wi-Fi connectors and video equipment to implement this upgrade. This upgrade will allow the UW-Madison Division of Intercollegiate Athletics to greatly improve wireless coverage for all fan areas, and provide an improved and unique fan experience using modern technology. The expanded capabilities will allow official messaging, application development, and video/test distribution to be sent to fans’ smart phones and video monitors throughout the stadium’s concourses and suites. This upgrade is similar to those being made by other conferences across the country to address an industry challenge of improving game day experiences for fans within stadiums. MSN – 13K2J – Langdon Street Utility Renovation ($1,481,200): This project renovates central campus utilities along Langdon St. between the Memorial Union and the Memorial Library. The project will replace chilled water supply and return piping from just east of the take-off to the Red Gym to the Memorial Library. Domestic water piping will be replaced from an existing valve located near the west wing of the Memorial Union to the Pyle Center. A new accessible tunnel will be constructed to replace a brick utility tunnel to hold high pressure steam pumped condensate return, compressed air, and domestic water for the Library Mall fountain. Due to site restrictions, this work will require pipe boring. None of the utility work included in this project is directly related to Phase II of the Memorial Union Renovation or Alumni Park projects. However, the proximity of these utilities could cause significant disruption to the Memorial Union operations without this renovation. The arched brick utility tunnel, which is approximately 70 years old, is a safety concern because it is both difficult and dangerous to access. Due to the proximity of the tunnel to Lake Mendota, significant leaking of water occurs into the tunnel after rain events or during times of high water level of the lake. The chilled water piping was installed in the mid-1960s and is some of the oldest chilled water piping on campus. Piping of this vintage has failed in several locations including near Lathrop Hall and in front of the Memorial Union. Piping failures result in significant localized flooding and the loss of chilled water system pressure at the utility plants can impact the ability to provide cooling to all campus facilities. Approximately two-thirds of the domestic water piping included in this project was installed in 1894. When the Pyle Center was constructed in 1954, the remainder of the water piping included in this project was installed. This piping is at or beyond its useful life and should be replaced. PROJECT JUSTIFICATION: UWS and DFD continue to work with each institution to develop a comprehensive campus physical development plan, including infrastructure maintenance planning. Submitted All Agency project proposals, infrastructure planning issues, and the UW All Agency funding targets set by DFD are thoroughly reviewed and considered. This request represents high priority UWS infrastructure maintenance, repair, renovation, and upgrade needs and focuses on existing facilities and utilities, targets the known maintenance needs, and addresses outstanding health and safety issues. Where possible, similar work throughout a single facility or across multiple facilities has been combined into a single request to provide more efficient project management and project execution. BUDGET/SCHEDULE: GFSB – Facility Maintenance and Repair .................................................................... GFSB – Utility Repair /Renovation ............................................................................... PRSB . ..... ............ ..... ..... ............................................................................................. Cash ... ..... ………………………………………………………………………….. $506,800 $1,081,300 $3,973,500 $3,960,100 Total Requested Budget ........... $9,521,700 PREVIOUS ACTION: None.
© Copyright 2024 ExpyDoc