2015 EDITION STANDARD CONTRACT DOCUMENTS SUMMARY OF REVISIONS SECTION November 4, 2014 REMOVED/ADDED/REVISED Section A - General Specifications (GS) GS-2 GS-9 GS-9 Updated list of equipment required in Field office (remove fax/answering machine) Added London Hydro Pole Support and Forestry Assistance contact names Updated phone extension for London Hydro Forestry Assistance Section B – Part 1 – Standards for Road (SR) DWG Updated DWG SR-3.0 Concrete Curb Setbacks Section B – Part 2 – Standards for Sewer and Water (SW) 407.05.05 407.07.16 407.07.24 441.05.04.04 441.05.04.04 441.05.04.04 441.05.10 441.05.10 441.05.20.01 441.05.21 441.05.24 441.07.19 441.07.23.01 442.05.05 DWG Materials-Adjustment Units – delete subsection 407.05.05 paragraph 2 and 3 Amendments to 407.07.16 – Installation of Frames with Grates or Covers – paragraph 1 deleted and replaced with paragraph. Paragraphs 2 and 3 deleted in its entirety Delete and replace 1st paragraph in subsection 407.07.24 – Leakage Test in new subdivisions Add paragraph to Joint Thrust Restraints – restraints to be torqued a) Add approved restrainer for pressure pipe b) Add approved bell and spigot push on joints c) Add approved restraining pipe to mechanical joint fittings Fire hydrant laterals changed from ductile iron to PVC in subsection 441.05.10 Approved box for 25 mm curb stop Add subsection 441.05.20.01- Water Tightness Approved end seals for casing spacers in subsection 441.05.21 Zinc Anode shall have tracer wire- subsection 441.05.24 Fire hydrant laterals changed from ductile iron to PVC in subsection 441.07.19 Addition of paragraph to 441.07.23.01 – General – specs used in design of all new infrastructure Delete subsection 442.05.05 paragraph b) and replaced with approved test flush mount test stations Updated DWG SW-6.1 – PDC Riser Type I Updated DWG SW-6.3 – PDC Vertical Riser Installation Updated DWG W-CS-1 sheet1 – Standard Hydrant and Valve Installation Added DWG W-CS-1 sheet2 – Tracer Wire Installation Added DWG W-CS-72 – Casing Detail Added DWG W-CS-74 – Typical Air Valve Chamber City of London |2014 Edition Page 1 of 3 2015 EDITION STANDARD CONTRACT DOCUMENTS SUMMARY OF REVISIONS SECTION November 4, 2014 REMOVED/ADDED/REVISED Section B – Part 3 – Traffic Signals and Street Lighting (STS) 106.07.01 106.07.06 602 602 614.05.10 615.05.03.01 615.05.03.02 617.05.01.01 620.07.02.02 620.07.06 620.07.08.01 620.07.10.04.01 620.07.10.04.01 620.07.10.04.02 Approved Suppliers DWGs List of qualified contractors is updated The requirements for Temporary Electrical Work has been expanded to include traffic signal communications and roadway/sidewalk lighting levels Prefabricated Service Boxes Model numbers for Quazite and Synertech Type I boxes has been updated and a new Type II has been added Electrical Junction Boxes Model numbers for Quazite has been updated. A Synertech Type I box and a new Type II has been added Power Supply Pedestal Assembly Updated model numbers Aluminum Poles, Base Mounted Deleted 3.3 m pole Added 3.6 m pole Steel Poles, Base Mounted Deleted 3.0 m pole Added 3.6 m pole Deleted reference to POWCO New specification for HPS lamps. PM Castings Ltd. (Model # CBL-VCT (3 section and 4 section) added as an approved manufacture New section for Traffic Signal Pre-Emption Equipment Enhanced requirement for transportation of the traffic signal controller Deleted Quadrapole loops Added a 2.0m X 12.0 m Simple loop and a 1.0 m X 1.0 m Diamond Simple loop Loop Layout is amended to include a reference to STS 9.0. Section for Matrix Detection System is added Added a specification for Cast Iron Detectable Warning Plates Rigid Arm Dual End Brackets Added PM Castings Ltd. Detection Equipment Econolite Canada Inc.(Auto Scope) Fortran (Matrix) Tacel (Sensys) Tactile Plates East Jordan Iron Works Inc. IronPed LLC Neenah Foundry STS-4.01, STS-4.04, STS-5.02, STS-5.04, STS-6.01, STS-7.02, STS-7.03, STS-7.06, STS-8.01, STS-8.02, STS-9.0, STS-9.04, STS-9.05, STS-9.07, STS-9.08, STS-9.09, STS-9.10, STS-11.01, STS-11.02, STS-11.03, STS-11.04, STS-11.05, STS-11.06, STS-11.08, STS-11.09 City of London |2014 Edition Page 2 of 3 2015 EDITION STANDARD CONTRACT DOCUMENTS SUMMARY OF REVISIONS November 4, 2014 Section B – Part 4 – General Conditions of Contract (SGC) SGC-19 Increased liquidated damages to $1000/calendar day Changed working days to calendar days Section B – Part 5 – Tree Planting and Preservation (TPP) No changes presented Section B – Part 6 – Parks and Open Spaces (SPO) DWG DWG DWG DWG Added DWG SPO-1.8 – Concrete Paving with Mesh Updated DWG SPO-2.1 – Typical Play Area Layout Updated DWG SPO-2.3 – Play Area Section at Drainage Hole Added DWG SPO-2.5 – Play Area section at Depressed Curb Section E - Forms Notification and Acknowledgment of Designated Substances on Project updated Edition 2014 but not added to document. Added this year. City of London |2014 Edition Page 3 of 3
© Copyright 2024 ExpyDoc