2015 EDITION STANDARD CONTRACT
DOCUMENTS SUMMARY OF REVISIONS
SECTION
November 4, 2014
REMOVED/ADDED/REVISED
Section A - General Specifications (GS)
GS-2
GS-9
GS-9
Updated list of equipment required in Field office (remove fax/answering machine)
Added London Hydro Pole Support and Forestry Assistance contact names
Updated phone extension for London Hydro Forestry Assistance
Section B – Part 1 – Standards for Road (SR)
DWG
Updated DWG SR-3.0 Concrete Curb Setbacks
Section B – Part 2 – Standards for Sewer and Water (SW)
407.05.05
407.07.16
407.07.24
441.05.04.04
441.05.04.04
441.05.04.04
441.05.10
441.05.10
441.05.20.01
441.05.21
441.05.24
441.07.19
441.07.23.01
442.05.05
DWG
Materials-Adjustment Units – delete subsection 407.05.05 paragraph 2 and 3
Amendments to 407.07.16 – Installation of Frames with Grates or Covers – paragraph 1
deleted and replaced with paragraph. Paragraphs 2 and 3 deleted in its entirety
Delete and replace 1st paragraph in subsection 407.07.24 – Leakage Test in new
subdivisions
Add paragraph to Joint Thrust Restraints – restraints to be torqued
a) Add approved restrainer for pressure pipe
b) Add approved bell and spigot push on joints
c) Add approved restraining pipe to mechanical joint fittings
Fire hydrant laterals changed from ductile iron to PVC in subsection 441.05.10
Approved box for 25 mm curb stop
Add subsection 441.05.20.01- Water Tightness
Approved end seals for casing spacers in subsection 441.05.21
Zinc Anode shall have tracer wire- subsection 441.05.24
Fire hydrant laterals changed from ductile iron to PVC in subsection 441.07.19
Addition of paragraph to 441.07.23.01 – General – specs used in design of all new
infrastructure
Delete subsection 442.05.05 paragraph b) and replaced with approved test flush mount
test stations
Updated DWG SW-6.1 – PDC Riser Type I
Updated DWG SW-6.3 – PDC Vertical Riser Installation
Updated DWG W-CS-1 sheet1 – Standard Hydrant and Valve Installation
Added DWG W-CS-1 sheet2 – Tracer Wire Installation
Added DWG W-CS-72 – Casing Detail
Added DWG W-CS-74 – Typical Air Valve Chamber
City of London |2014 Edition
Page 1 of 3
2015 EDITION STANDARD CONTRACT
DOCUMENTS SUMMARY OF REVISIONS
SECTION
November 4, 2014
REMOVED/ADDED/REVISED
Section B – Part 3 – Traffic Signals and Street Lighting (STS)
106.07.01
106.07.06
602
602
614.05.10
615.05.03.01
615.05.03.02
617.05.01.01
620.07.02.02
620.07.06
620.07.08.01
620.07.10.04.01
620.07.10.04.01
620.07.10.04.02
Approved
Suppliers
DWGs
List of qualified contractors is updated
The requirements for Temporary Electrical Work has been expanded to
include traffic signal communications and roadway/sidewalk lighting levels
Prefabricated Service Boxes
Model numbers for Quazite and Synertech Type I boxes has been updated
and a new Type II has been added
Electrical Junction Boxes
Model numbers for Quazite has been updated. A Synertech Type I box and a
new Type II has been added
Power Supply Pedestal Assembly
Updated model numbers
Aluminum Poles, Base Mounted
Deleted 3.3 m pole
Added 3.6 m pole
Steel Poles, Base Mounted
Deleted 3.0 m pole
Added 3.6 m pole
Deleted reference to POWCO
New specification for HPS lamps.
PM Castings Ltd. (Model # CBL-VCT (3 section and 4 section) added as an
approved manufacture
New section for Traffic Signal Pre-Emption Equipment
Enhanced requirement for transportation of the traffic signal controller
Deleted Quadrapole loops
Added a 2.0m X 12.0 m Simple loop and a 1.0 m X 1.0 m Diamond Simple
loop
Loop Layout is amended to include a reference to STS 9.0.
Section for Matrix Detection System is added
Added a specification for Cast Iron Detectable Warning Plates
Rigid Arm Dual End Brackets
Added PM Castings Ltd.
Detection Equipment
Econolite Canada Inc.(Auto Scope)
Fortran (Matrix)
Tacel (Sensys)
Tactile Plates
East Jordan Iron Works Inc.
IronPed LLC
Neenah Foundry
STS-4.01, STS-4.04, STS-5.02, STS-5.04, STS-6.01, STS-7.02, STS-7.03, STS-7.06,
STS-8.01, STS-8.02, STS-9.0, STS-9.04, STS-9.05, STS-9.07, STS-9.08, STS-9.09,
STS-9.10, STS-11.01, STS-11.02, STS-11.03, STS-11.04, STS-11.05,
STS-11.06, STS-11.08, STS-11.09
City of London |2014 Edition
Page 2 of 3
2015 EDITION STANDARD CONTRACT
DOCUMENTS SUMMARY OF REVISIONS
November 4, 2014
Section B – Part 4 – General Conditions of Contract (SGC)
SGC-19
Increased liquidated damages to $1000/calendar day
Changed working days to calendar days
Section B – Part 5 – Tree Planting and Preservation (TPP)
No changes presented
Section B – Part 6 – Parks and Open Spaces (SPO)
DWG
DWG
DWG
DWG
Added DWG SPO-1.8 – Concrete Paving with Mesh
Updated DWG SPO-2.1 – Typical Play Area Layout
Updated DWG SPO-2.3 – Play Area Section at Drainage Hole
Added DWG SPO-2.5 – Play Area section at Depressed Curb
Section E - Forms
Notification and Acknowledgment of Designated Substances on Project updated Edition
2014 but not added to document. Added this year.