• MAZAGON DOCK LIMITED (A Govt . Of India Undertaking) DOCKYARD ROAD, MUMBAI - 400 010 SHIPBUILDING DESIGN ELECTRICAL & WEAPON DEPARTMENT PROTECT: P15A YARD Nos. 12701 , 12702 & 12703 TECHNICAL SPECIFICATION FOR PROCUREMENT (TSP) OF 10 KVA PORTABLE TRANSFORMER (Allowance list (Consumable ) Item sr. No. 117(g)) TSP No. 5180 PR No . 1110013849 DESCRIPTION REV DATE AUTHORIZED BY .K. Shrivastava D.K.R ut D.K . M ' ut M (D-L&Wn) M (D-L&Wn) AGM (D-L&Wn) Prepared By Checked By Approved By Page I of 18 MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road, Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD -12701, 12702 & 12703 P-15A: TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 2 of 18 CONTENTS SR. NO . DESCRIPTION 1 PART 0: PREAMBLE 2 PART 1: TECHNICAL SPECIFICATION FOR TRANSFORMERS PAGE NO. 03 04 3 PART 3: GENERAL REQUIREMENTS OF ELECTRICAL EQUIPMENTS 14 4 APPENDIX-1- COMPLIANCE MATRIX 17 5 APPENDIX-2 - NSS-A GRADE CURVE 18 MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701 , 12702 & 12703 P-15A : TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 3 of 18 PART 0: PREAMBLE 01 INTRODUCTION This specification is written in two (2) parts: 010 Part 0 - Preamble 011 Part 1 - Technical Specification 012 Part 2 - General Requirements of Electrical Equipments 02 DEVIATION 021 The supplier should clearly indicate the clauses in the specification not being complied with. In the absence of a clear statement to the contrary, it will be assumed that the equipment supplied will meet the requirements in full. In case there is conflict between clause i n technical specification a nd in General Requirements of Electrical Equipments clause in Technical Specification shall take precedence. 022 The supplier should not alter the binding drawings or the scope of supply or any other aspect governed by this procurement requisition as finally agreed, without specific concurrence from MDL, even if any other authority (Inspection authority or their resident inspectors, subcontractors to the main equipment and machinery etc.,) seek such alterations. 03 CLAUSES NOT APPLICABLE TO THIS EQUIPMENT (SEE ALSO CLAUSE 02): Clause Applicable I Meets the requirement Yes / No. Yes / No Remarks AGON DOCK LTD. (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701, 12702 & 12703 P-15A : TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 4 of 18 PART 1: TECHNICAL SPECIFICATION FOR TRANSFORMERS 1. BRIEF DESCRIPTION : This technical specification covers the manufacturing, testing and on-board commissioning of the transformers for the application as specified herein below of Project-15A ships total comprises of 03 Nos. ships (ie Y-12701, Y-12702 & Y-12703). The transformer should be designed to meet the input/output characteristics of supply voltage for the appropriate load and duty cycle. The design is to cater for the most adverse marine environmental and electrical conditions. The transformer should be provided with tap changing arrangement for adjustment of voltage as per requirement. The transformer shall be dry type double wound and naturally air-cooled. The transformer shall conform to specification NES-535 and other specifications referred this TSP. 2. SCOPE OF SUPPLY :2.1 Transformers as listed below has to be supplied. The vendor who have successfully carried out Environment and Type Tests indicated para 9.A and para. 9.B for the transformer upto 20KVA shall only apply for this tender. The details of these tests should be enclosed with the technical offer. . SR. No. 1 Quantity (No.) T rans f ormer R ati ng 10 KVA Transformer 380V, 50 Hz, 1 Phase,2 Wire/ 230V, 50Hz, 1 Phase, 3 Wire With Distribution/ Extension board comprising :a. 1 No. MCCB for Incoming b. DP Switch Socket at other end of incoming side cable. c. 1 No. MCCB at Outgoing d. 6 Nos. 15A D.P. Switch Socket with fuse for individual socket e. Supply ON indication at incoming side. And 75 m cable at incoming end with Switch Socket and plug. Application 1st Ship 2nd Ship 1 1 3rd Ship 1 For Domestic Appliances MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701 , 12702 & 12703 P- 15A: TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 5 of 18 3. POWER SUPPLY CHARACTERISTICS: 3.1 Ships input supply will be 380 V, 50 Hz, 3-Phase, 3-wire. The primary AC supply voltage characteristics shall be as per table below: CHARACTERISTIC OF STANDARD MAIN AC POWER SUPPLY (380V) VOLTAGE a) NOMINAL VOLTAGE 380V b) LOAD RANGE TOERANCE AVERAGE LINE TO LINE VALUE OF 3 PHASE SYSTEM. ±5% LINE TO LINE VOLTAGE OF 3 PHASE ±6% SYTEM c) MAXIMUM UNBALANCE ±2% d) MAXIMUM MODULATION ±2% e) FREQUENT TRANSIENTS (EXCLUDING -10% TO +6% SPIKES) f) RECOVERY TIME 0.5 SEC g) INFREQUENT FREQUENT TRANSIENTS +16% TO +10% (EXCLUDING SPIKES) h) RECOVERY TIME I SEC 2 WAVE FORM MAXIMUM INDIVIDUAL HARMONIC MAXIMUM TOTAL HARMONIC CONTENT 3 FREQUENCY a) NOMINAL FREQUENCY b) LOAD RANGE TOLERANCE b) CONSTANT LOAD TOLERANCE c) MODULATION d) INFREQUENT TRANSIENTS e) RECOVERY TIME 3% 5% 50 Hz ± 2.5% ± 0.5% 0.25% - 3.75% + 2 SEC 3.2 OUTPUT SUPPLY FROM TRANSFORMER: Transformer's output should be 230V, 50Hz, 3-Phase, 3-wire , output characteristics at consumer terminals should be as per table below: 1 CHARACTERISTIC OF STANDARD MAIN AC POWER SUPPLY CONSUMER VOLTAGE NOMINAL VOLTAGE 230V LOAD RANGE TOLERANCE - LINE TO LINE - CONSTANT LOAD TOLERANCE - SINGLE PHASE OR THREE PHASE - TRANSIENTS (EXCLUDING SPIKES) - RECOVERY TIME - INFREQUENT TRANSIENTS - RECOVERY TIME - MAXIMUM MODULATION - MAXIMUM UNBALANCE 2 WAVE FORM - MAXIMUM INDIVIDUAL HARMONIC - MAXIMUM TOTAL HARMONIC CONTENT 3 FREQUENCY NOMINAL FREQUENCY - LOAD RANGE TOLERANCE - CONSTANT LOAD TOLERANCE - MODULATION - IN-FREQUENT TRANSIENTS - RECOVERY TIME ±5% ±1% +6% -10% TO +6% 0.5 SEC -16% TO +10% 1 SEC 2% ±2% ±2% 3% 5% 50 Hz ±2.5% ± 0.5% 0.25% +-3.75% 2 SEC = MAZAGON DOCK LTD. (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 DESIGN -- -ELECTRICAL & WEAPON SECTION YARD - 12701 , 12702 & 12703 P- 15A: TRANSFORMERS TSNO REV NO DATE PAGE 5180 0 09.06.14 6 of 18 4. CUSTOMER SPECIFIC REQUIREMENT :4.1 Transformer is to be made portable by permanently mounting it on a small trolley (of approx. height of 150mm) with four wheels and handle of suitable size for easy movement/ transport of trolley with transformer. Trolley should be fabricated from MS angle frame and MS sheet of suitable gauge. Further, suitable handles(two handles, foldable) on either side of transformer are to be provided for convenience during lifting. Detailed Trolley drawing has to be submitted alongwith technical offer in order to analyse suitability of the offered trolley. If the trolley design is not found suitable to customer/IN satisfaction, the technical offer shall be liable to be technically rejected. 4.2 The cable(flexible LFH) of suitable rating, 75 meter long connected at input of transformer is to be supplied along with it for providing power supply connection from onboard source. The switch socket with plug of suitable rating has to be provided at another end of the cable. The suitable cable stowage arrangement has to be provisioned on the transformer. 4.3 The power supply Distribution/ Extension board is to be vertically mounted on the transformer/ trolley containing following. The Distribution/ Extension board should be box type of suitable gauge. The rear side of box should be enclosed. The board should not be part of transformer body. It should be installed on top side of transformer with supporting MS bar at the height of 2 inches to 4 inches. The front side of board should be provided with foldable cover facility. The incoming cables permanently connected from bottom side. a. One MCCB(Double Pole) for Switching ON/OFF of incoming supply of transformer. b. One MCCB(Double Pole) for Centralised ON/OFF of Outgoing supply of transformer. c. 15 Amp Sockets : 06 in no with dedicated ON/OFF Double Pole Switch. d. The Fuses are to be installed in outgoing supply prior to distributing it for 06 proposed sockets. e. An indication lamp for incoming Supply Available/ Not Available 5. TECHNICAL REQUIREMENTS: 5.1 RATING: Continuous at 0.8 power factor (lagging) 5.2 REGULATION: Not exceeding 3.3% of UPF. 5.3 Efficiency: - The efficiency of transformer should be 97% and above at Full Load. 5.4 The primary side is to be provided with tapping terminals of +2.5% and -2.5% to adjust the Voltage in addition to normal terminal for each phase. 5.5 PERFORMANCE: The transformer shall be capable of giving its full rated output continuously or at any other specified loading cycle, within the normal ambient air temperature and steady state tolerance of electrical supply conditions without exceeding the permissible temperature rise of its winding (i.e. class H insulation-105 deg C) and regulation (3.3%) requirements as specified in para 4.2 above. The tolerances of electrical performance of transformer are to comply with BS-3399. 5.6 WINDING:- The winding of transformers should be double wound, dry type and naturally air cooled. 5.7 The output terminals are to be marked with phase identification details. Also the "Primary/Incoming Terminals" and "Secondary/Output Terminals" to be marked below MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701 , 12702 & 12703 P -15A: TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 7 of 18 the terminals. The terminals and cable entry for primary and secondary are to be provided on same side. 5.8 SATURATED REACTANCE: The value of the saturated reactance of primary winding must be greater than 4.2Fp/k ohm/phase. Where Fp= Primary winding factor, 1 for star, 3 for delta connection, k=total KVA rating of transformer. 5.9 SHORT CIRCUIT PROTECTION: The transformer is to be designed that whenever being supplied at the upper steady state limit of input voltage. It can withstand a short circuit at the output terminals in accordance with requirement of BS-3399. 5.10 SELF INDUCED NOISE AND VIBRATION: Care is to be taken in the design and manufacture to ensure that airborne noise and structure born vibrations produced by the transformer are reduced to as minimum as possible. Target figures for noise and vibration levels and methods of taking measurements are given in clause 0503 of specification NES537. The self-induced air borne noise level and vibration level not to exceed 60 dB. The' other General Requirements for the Design of Electro Technical equipment are given in specification NES-501. 5.11 CLASS OF INSULATION AND PERMISSIBLE TEMP RISE: Insulation classification Class "H", the max permissible temp rises when operating at a normal ambient temperature of 55 deg C shall be 105 deg C. The temp rise in no case to reach such a value that there is a case of injury to any insulation material on adjacent part. 5.12 CONTROL CIRCUIT WIRING: Only LFH cables are to be used for internal wiring. 6. CONSTRUCTION 6.1 ENCLOSURE: The panel enclosure shall be fabricated of Mild Steel 14 SWG , Drip proof, protection against water spray up to angle of 60 deg from vertical. 6.2 ENCLOSURE PROTECTION: IP-23 6.3 LAMINATIONS: Laminations are to be cold rolled grain oriented steel, the grade being selected to give minimum losses, size and weight. The laminations are to be tightly clamped to reduce noise emission and all both passing through the magnetic circuit are to be effectively insulated. 6.4 ELECTROSTATIC SCREENING: All double wound transformers are to be fitted with an electrostatic screen between each high voltage winding and low voltage winding. It is to comprise a single turn of copper or aluminium foil. The single turn must not form a closed loop but the ends are to overlap and be insulated from each other. A connection is to be brought out from the midpoint of this screen and connected to the earth stud within the transformer case. 6.5 IMPREGNATION: All windings are to be impregnated with thermal setting varnish by either of following methods: a) Vacuum/ pressure impregnation and back, plus one dip bake. b) Hot dip & bake- 3 times MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701 , 12702 & 12703 P - 15A: TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 8 of 18 A smooth even finish of the winding is essential and an air drying finishing varnish may be applied after the impregnation process to achieve this, if necessary provided that: a) The varnish is solvent less b) Air ways are kept clean c) It is properly cured The varnish used is to meet the requirements of BS-5629 6.6 INSULATION: The insulation material of winding is to include a minimum thickness of 0.5 mm of mica or micanite or other approved insulation appropriate to the insulation class between one winding and any of the following part: a) Core b) Another winding c) Earthed screen 6.7 SHOCK STANDARD: Equipment offered shall be capable of withstanding NSS Grade-II (Inherent) in conjunction with BR-3021. 6.7.1 General procedure for calculation of shock vulnerability: Selection of shock level based on its weight and required shock standard. Layout design of mounts and calculation of reaction forces on each mount. - Calculation of response of mounts. - Evaluation of shock level i.e. shock acceleration and pulse duration for all the subsystem. - Evaluation of stress on the base and all subsystem. Check deflection. - Comparison of stress under shock calculations with permissible dynamic stress. - Study the relative displacement between subsystems. - Provision of shock dampers (if necessary between subsystems. - Check material compatibility. - Check the deflection of the mounts under worst conditions. - Check fasteners for stress for shock loading conditions. 6.8 VIBRATION STANDARD : 5-33 Hz (Conforming to specification JSS-55555) 6.9 COOLING: Natural, air-cooled. 6.10 MOUNTING: The transformers are to be Deck mounted. The two in No. C-type MS channel of suitable size to be fitted at the bottom of transformer are to be supplied along with the transformer. 6.11 EARTHING: The transformer is to be fitted with a double ended threaded M 10 earth stud and is to be fitted through the casing of the transformer adjacent to secondary cable entry plate. 6.12 DIMENSIONAL LIMITATION: The maximum overall dimensions shall be kept to a minimum. 6.13 LIFTING ARRANGEMENT: Lifting hooks are to be provided on top of the transformer. 6.14 CABLE ENTRY GLANDS: Cable glands of Type 1, zinc passivated mild steel and naval brass gland nuts for incoming & outgoing cables shall confirm to specification No: DGS/ EED/ VI/ 1535/ R6 or NES -512 Part 11 are to be supplied along with the main MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701, 12702 & 12703 P - 15A: TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 9 of 18 equipment. Cable entry to transformer should be from side only. These glands are to be fitted on a detachable plate. The detachable gland plate should be supplied undrilled. The cable gland size of size 4, one in No. to be provided for incoming cable (primary side) and cable gland size of size 4, one in No. to be provided for outgoing cable(secondary side). 6.15 TERMINALS: Bolted type terminals and crimping lugs of reputed make of electrolytic copper are to be provided for all incoming and outgoing cables. These are to be suitably arranged and marked for easy accessibility, identification and connections. The crimping lugs are to be supplied in PIP packing alongwith each transformer. 6.16 COMPONENTS: a) All components shall be of naval approved type used for in-board frigate class ship. b) Standard specification and graded of material of each type to be indicated in the binding drawings. 7. PAINTING: Admiralty ships grey (conform to specification DGS-251). 8.1 SHIPS MOTION: List: Max 20 deg from vertical, permanent.. Roll: +/- 30 deg. Period of roll 10 sec. Pitch: +/-10 deg. Period 20 sec Trim : Max 5 deg. 8.2. ENVIRONMENTAL CONDITIONS: The equipment offered for marine application shall achieve specified output and function smoothly under tropical conditions. It shall withstand air contamination through oil, salts and other contaminants associated with the marine environment. The equipment shall be water drip proof as a minimum requirement. The equipment shall operate under the following environment conditions: a) Ambient air temperature: 0 to 55 deg C b) Sea water temperature: 2 to 35 deg C c) Relative humidity: 30-100% but not exceeding at temperature of 35 deg C 9.A ENVIORONMENTAL TYPE TESTS :The offered transformer should comply to following test conditions :Sr. No TEST SPECN PURPOSE (BRIEFLY) 1 SHOCK OR IMPACT TEST 24 JSS 55555 STRUCTURAL / PERFORMANCE INTEGRITY AFTER NON REPERTEATIVE MECH.SHOCK 2 VIBRATION TEST 28 JSS 55555 WITH STAND VIBRATION 3 INCLINATION/ TILT SES-19, clause 0563 4 DRIP PROOF TEST FOR IP-23 TEST 28 JSS 55555 30Deg INCLINATION FROM THE VERTICAL IN TWO DIRECTIONS FOR ONE HOUR IN ON CONDITION. WATER DROPLETS FALLING ON UNSEALED ITEMS. CONDENSATION DRIPS IN A/C SPACES. TEST CONDITION SEVERITY 50g, 11m SEC OR 30g, 18m SEC, 3 SHOCKS IN EACH OF 6 FACES (PROCEDURE-2) FOR 5 TO 33 HZ FREQUENCY VERTICAL WATER DROPLETS FROM 1 M ht FOR 15 min MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701 , 12702 & 12703 P -15A: TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 10 of 18 9.B ELECTRICAL TYPE TESTS The transformer has to be subjected for following Electrical Type Testing, transformers are to be supplied only after conduction of successful Type Tests, duly incorporating type test observations, if any, on balance transformers also. Sr. No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TEST MEASUREMENT OF WINDING RESISTANCE RATIO, POLARITY AND PHASE RELATIONSHIP IMPEDANCE VOLTAGE NO-LOAD LOSSES AND NOLOAD CURRENT TEMPERATURE RISE REGULATUION AT UPF AND 0.8 LAGGING LOAD LOSSES AIRBORNE NOISE AND VIBRATION SHORT CIRCUIT AT FULL VOLTAGE INDUCED OVER-VOLATGE WITHSTAND SEPARATE-SOURCE VOLTAGE WITHSTAND INSULATION RESISTANCE PARALLEL OPERATION EARTH BONDING TEST EMI/EMC SPECIFICATION NES 511 BS 3399 BS 3399 BS 3399 NES 511 BS 3399 BS 3399 NES 537 , NES 847 AND NES 813 BS 3399 BS 3399 BS 3399 NES 511 NES 537 NES 511 MIL- STD-461E 9. C ROUTINE ELECTRICAL TESTS :The following Routine Electrical Tests indicated at clause 0608 of NES 537 are to be carried out on each Transformer. These tests are to be included in QAP alongwith other QAP checks to carryout inspection in accordance with these tests. Sr. No 1 2 3 4 5 6 7 8 TEST MEASUREMENT OF WINDING RESISTANCE RATIO, POLARITY AND PHASE RELATIONSHIP IMPEDANCE VOLTAGE NO-LOAD LOSSES AND NOLOAD CURRENT LOAD LOSSES SELF-INDUCED AIRBONE NOISE AND VIBRATION INDUCED OVER-VOLATGE WITHSTAND SEPARATE-SOURCE SPECIFICATION NES 511 BS 3399 BS 3399 BS 3399 BS 3399 NES 537 BS 3399 NES511 MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 Sr. No 9 10 11 TEST VOLTAGE WITHSTAND INSULATION RESISTANCE PARALLEL OPERATION EARTH BONDING TEST DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701, 12702 & 12703 P-15A: TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 11 of 18 SPECIFICATION NES 511 NES 537 NES 511 10. TALLEY AND DIAGRAM PLATES: 10.1 All Talley & diagram plates shall be of anodised aluminium alloy. 10.2 A diagram plate indicating the details of connection to be provided / affixed on the Transformer. 10.3 Caution plates of all voltages of 230V and above are to be fixed on the front cover. 10.4 Size of tally plates, diagram plates and their letters shall conform to specification NES-723. 10.5 RATING PLATE INDICATING:i. Rating KVA ii. Volts at no load (HV & LV) iii. Current in Amps (HV & LV) iv. Percentage impedance v. Total weight vi. Frequency vii. Class of insulation viii. Temperature rise C deg ix. Type of cooling X. Winding vector symbol Yd1 xi. Yard no. xii. Inspected by xiii. Purchase order and date xiv. Year of manufacturing xv. Makers serial number 10.6 Terminal plate indicating various output voltage 10.7 Earth tally-earth terminal 10.8 Danger tally-380V (RED) 10.9 Connection diagram plate 11. GOVERNING SPECIFICATION The transformer should be design, manufacture and tested in accordance with following governing specifications :- Sr No i. ii. iii. Specification BR-3021 DEF-133 NES -501 iv. NES-502 v. vi. vii. viii. NES-511 NES-535 NES-537 NES-723 Description Shock Manual For vibration General Requirement for the Design of Electro-technical and Naval Weapon Equipment. Requirement for Materials and Finishes for Electro- Technical Equipment. Specification for Electrical testing of equipment Requirement for transformers for power services. Requirement for testing of transformers. Tally/ Diagram Plates. _ MAZAGON DOCK LTD . (A Govt . Of India Undertaking ) Dockyard Road , Mumbai -400010 Sr No ix. X. xi. Specification SES-4 MIL-STD-461E JSS-55555 xii. xiii. xiv. xv. xvi. Curve 'A' BS-3399 BS-5629 DGS-251 NES-512 Part 11 or DGS/EED/VI/1535/R6 DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701 , 12702 & 12703 P-15A: TRANSFORMERS MP NO REV NO DATE PAGE 5180 0 09.06.14 12 of 18 Description Quali nature of finish general requirement for material For controlling of EMI/EMC for equipment and cables Environmental Test Methods for Electrical and Electronics Equipment For shock grade as per BR-3021- Appendix - 6. Specification for transformers for use in ships. Insulation varnish containing solvent. For painting & finishing Cable Glands. 12. INFORMATION TO BE SUPPLIED WHEN TENDERING: a) A brief specification of the equipment offered including a statement showing any way in which the equipment is deviated from this TSP. b) Overall dimension & estimated weight of the equipment. c) Voltage ratio at no load. d) No-load current. e) Full load losses (Fixed, copper & total). f) Efficiency (at full load & half load) at UPF g) Regulation h) Maximum allowable temperature in deg. C. i) Main details of insulation. j) Output of abnormal ambient temperature, if applicable. k) Type test details. 1) Routine test details. m) Trolley details as indicated at para 4.1. The technical offers submitted without above indicated details shall not be technically considered. 13. INSPECTION: a. Inspection Authority - Third Party as nominated by MDL/DND b. Receipt Inspection - MDL/WOT (MB) 14. QUALITY ASSURANCE PLAN AND BINDING DRAWINGS:The detailed design, material and workmanship shall be in accordance with the best worldwide recognized marine practices, to ensure reliability, durability and ease of maintenance , which comply with the ship's requirements . The design shall be such that weight and size are reduced to the minimum practicable, ensuring no compromise in reliability or significant design criteria . The drawings/ documents shall be prepared by using following Softwares :- i. Documents - Latest version of MS Word 2010. ii. Orthographic Drawings & 3D Model of Equipment - AutoCAD 2013 or its latest version or STP format. Three sets of the following drawings/ documents along with QAP for transformer are to be submitted for approval to MDL and one set to MDL nominated inspection agency (third party) within two weeks of placement of order. The drawings/ documents to include the information as indicated at NES 535 clause 1002 strictly. MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701 , 12702 & 12703 P-15A: TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 13 of 18 a) General arrangement drawing indicating overall dimensions, fixing details, weight, Centre of Gravity of the item, etc. b) Dimensional layout drawings of the equipment's, installation and seating drawings. c) Electrical circuits, cabling diagram, inter unit connection and seating drawings. d) Bill of Material indicating part No., quantity, maker's name, and specification no. etc. e) Cabling terminal connection/ Circuit diagrams. f) A Quality Assurance Plan in detail is to be submitted indicating the tests proposed as indicated in NES 511 and & NES 537 -Routine Tests as per clause 0608. The quality assurance & control plan should meet the intents of ISO 9001 before commencing production. 15. PACKING: Each of the items is to be individually packed with suitable identificationlabel giving details such as Sr. No. of the item, Order No., etc. are to be marked legibly on outside the packing, which should be prominently visible. The lists are to be attached to the cases. 16. SERVICES OF ENGINEERS: Services of Engineers are to be made available at MDL for advice/ assistance in connection with on-board installation, testing, defect rectification and on-board Commissioning of the equipment. Any installations material required during any of these stages are to be supplied / replenished by the supplier at free of cost. 17. WARRANTY :- The equipment with associated controls/ instrumentation is to be guaranteed for stipulated performance for 48 months from the date of delivery or 12 months after commissioning of the ship whichever is earlier. The equipment supplied shall be warranted from defects, manufacturer and performance for the said period and cover all the defects arising from malfunction through design faults, inappropriate material, bad production and non- conformance to specifications. Any expense on account of repair/supply of spares against guarantee defects is to be borne by the supplier 18. PRODUCT SUPPORT: The supplier should confirm product support for next 20 years for the equipment offered by him. 19. DELIVERY:The delivery schedule for three ships is as indicated below.. Ship Delivery Yd.12701-1St Ship 31.07.2014 Yd.12702- 2nd Ship 31.07.2014 Yd.12703- 3rd Ship 31.07.2014 20. FACTORY ACCEPTANCE TRIAL REPORT: Supplier to provide Factory Acceptance Trial Reports indicating the actual values achieved during test along with inspection report 21. The firm which has facility to design, manufacture and testing as per stipulated standards in the TSP should only submit the offer. The firm which cannot comply the above criteria will not be considered for qualification. 22. SUPPLIER'S OFFER: The offer should be strictly conforming to the details indicated in this specification and the relevant Specifications / drawings / documents (All Latest Issues are to be followed). MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701 , 12702 & 12703 P- 15A: TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 14 of 18 No omission in the specification shall relieve the supplier of his responsibility to ascertain these requirements to perform work & furnish material in accordance with codes specified. Any clarification required regarding Technical Specification / Requisition should be sought before submission of the technical offer. A compliance matrix in the format as per Appendix-1 shall be submitted by the manufacturer along with the offer, for each Para of this TSP. The technical offer submitted without compliance matrix will not be technically considered. Compliance matrix has to be duly signed , stamped and to be submitted with technical offer. MAZAGON DOCK LTD. (A Govt. Of India Undertaking) Dockyard Road, Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD -12701, 12702 & 12703 P-15A: TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 15 of 18 PART - 2 GENERAL REQUIREMENTS OF ELECTRICAL EQUIPMENTS 1. The equipment / Item are generally required to withstand following marine conditions: Ambient temperature 0 to 50 °C for Machinery Space and 45 °C at other places. Humidity 100% at 35 °C. Sea water temperature 35 °C, Roll +/- 30 ° P & S, pitch 0 +/-15 0, list 20 °. 2. All items must strictly conform to relevant drawings / specifications mentioned in the requisition. 3. General arrangement drawing giving overall dimensions and approximate weight of the unit and centre of Gravity is to be supplied along with the offer , for non-Patternised item. 4. Wherever applicable , the production drawings are to be approved by DQA (N) / Statutory & regulatory agency. The manufacture of the items is to be started only on approval of the drawings. A set of approved production drawings is to be made available to MDL for dimensions, fixing details etc. 5. Wherever a pilot sample is required to be manufactured, the bulk production is to start only after approval of the sample by inspecting Agency / MDL. No Component will be supplied by MDL. 6. The items are to be of robust construction so as to withstand adverse marine conditions. Similar parts are to be interchangeable. The castings are to be free from blowholes, sharp edges to be rounded off, the threads are to be even and sharp. The switches, lamps, fuses, internal wires etc. used in the equipment are to be either Patternised or type approved by DQA / classification societies, as applicable. The details regarding this can be obtained from respective agencies. The indicating lamps should be easily accessible by unscrewing the bull's eye from the front. Fuses are to be clearly marked. a. The holes for mounting the equipment should be on lugs outside the casing of the equipment. b. The equipment is to be suitable for bulkhead / deck mounting. If equipment contains movable parts such as relays, contactors or electronics assemblies etc. the equipment is to be suitable for mounting on shock / vibration mounts. The mounts are to be supplied along with the equipment. c. Suitable earthing arrangement is to be provided on the equipment. d. Lifting arrangement is to be provided for heavy items. 7. For Ship's cables, the entries are to be through glands, unless otherwise stated. The glands are to be as per specification DGS/EED/VI/1535/R6. The gland nut and washers are to be left un-drilled, unless specified. 8. For connection of the ship's cables the terminals are to be easily accessible, For cables of sizes of 7/0.044 and higher, crimped sockets and clamp type terminals are to be provided for incoming & outgoing cable connection. An adequate space should be maintained between terminals, terminal block, the casing of the equipment and the cable entry glands. a. Internal wiring in the panels to be of Low Fire Hazard cables. b. The installation material, Viz free end connectors, cable crimps, special tools if any, mounts etc. to complete installation is to be supplied by you along with the equipment. MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road , Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD - 12701 , 12702 & 12703 P- 15A: TRANSFORMERS TSP NO REV NO DATE PAGE 5180 0 09.06.14 16 of 18 The Part No./The Pattern number of each item is to be prominently and indelibly cast/ embossed/ tallied. 10. The following engraved tallies of brass / anodised aluminium are to be screwed on each equipment: a. Manufacture's tally indicating name, description of the item, part / patt/No/ rating Sr. No. Year of manufacture weight/etc. b. Functional tallies for switches, lamps, push etc. c. Danger tallies for equipment operating on 220 V and above, the tally should have white letter on red background. d. Where applicable 'MODIFICATION STATE' of the equipment tally. e. Special tallies to be provided as applicable viz. Circuit diagram tallies, operating instructions motor direction of rotation etc. 11. The item is to be painted with admiralty ship's grey paint as per approved painting specification/ procedure. 12. Minor modifications required by Owner/ Inspecting Agencies / MDL are to be incorporated. 13. For any deviations, however minor, prior approval is to be obtained from DQA (Navy) / MDL Deviations once granted will not be necessarily applicable for repeat manufacture. 14. Net weight of each item is to be recorded in the presence of the inspector and a certificate to that effect is to be submitted along with supplies. 15. The equipment supplied by you will be installed on board the ship by MDL . The services of your engineers , if required during installation, setting to work, harbour trials, sea trials, etc. to prove your equipment to NAVY, be provided . Your service engineers are to bring their own test equipments / tools and spares for this purpose. MAZAGON DO CK LTD . (A Govt. Of India Undertaking) Dockyard Road. Mumbai -400010 DESIGN ELECTRICAL & WEAPON SECTION YARD -12701, 12702 & 12703 -P-15A: TRANS ORNIt TSP NO REV NO DATE PAGE 5180 0 09.06.14 17 of 18 APPENDIX NO-1 FORMAT FOR COMPLIANCE MATRIX The Bidder should fill in this form for the compliance matrix of his bid from the requirements as stated in the TSP. Bidder shall sign/date and affix his company seal. Not Complied Offer Reference TSP Complied / Para No (Page & Para No.) Remarks, if any BIDDER 'S COMPANY SEAL BIDDER'S SIGNATURE & DATE DESIGN ELECTRICAL & WEAPON SECTION YARD -12701,12702& 12703 P-15A: TRANSFORMERS MAZAGON DOCK LTD . (A Govt. Of India Undertaking) Dockyard Road, Mumbai -400010 TSP NO REV NO DATE PAGE 5180 0 09.06.14 18 of 18 SHOCK GRADE `A' 1000 T . , Vert{Gal Accctercaticxa i li L 4 i I l 100 Ve r tii ca T-1-c D e c ^b ra f i Hill _ l Velocity praise aratian 10 Ttne; o V( 10 Mass of 10000 100 Equ; pr; rnt 10 0 0 0 0 (K9 ) SKETCH v,k 15J1.)5K1582
© Copyright 2024 ExpyDoc