SCPW Fee Schedule

Summerville Commissioners of Public Works
Schedule of Fees and Service Charges - Updated 07/01/14
SERVICE CHARGES:
- Non-refundable Account Origination Fee - Per meter for multiple meter accounts (07/17/06) $ 30.00
- Late Fee (45 days past due)
25.00
- After Hours Service Fee (initiated/restored after business hours)
25.00
- Same Day Convenience Fee (after 2:00 pm same day service is requested) (eff. 01/01/09)
25.00
- Dishonored Check Charge
30.00
15.00
- Temporary Service Fee (water use and sewer service will be charged at prevailing rates)
- Temporary Disconnection Fee (temporarily disconnected service)
30.00
- Account Reactivation Fee (restoration of temporarily disconnected service)
30.00
- Internet/Online/Telephone Transaction Fee (applies to water/sewer bill payments - per transaction) (08/2013)
3.00
- Minimum charge to open sewer service at customer's request when
200.00
blockage is not in SCPW line. Additional labor @ $28.00 per hour (rev 06/24/08)
MONTHLY FEES: (Rev 06/01/14)
In Town
Residential Water Rate (Minimum Bill: 0-2,000 gals)
$ 13.75
Residential Water Rate (Per 1,000 gals over minimum) (eff 06/01/14)
1.70
Commercial/Apartment Water Rate
Based on Meter Size
21.25
Residential Sewer Rate (flat rate)
Commercial Sewer Rate (80% of water bill or minimum)
22.25
21.25
Apartment Sewer Rate (Based on Per Unit x Sewer Flat Rate)
Fireline/Sprinkler Systems/Deteco Meter
50.00
Septic Tank Effluent Pumping System Fee (Waters Edge Parcel C Only)
19.00
4.00
Residential Stormwater Fee (Rev. 01/01/08)
Commercial Stormwater Fee
Based on ERU
Residential Garbage Fee - New residential construction (01/01/12)
8.50
MINIMUM BILL PER METER SIZE: (Rev 09/01/11)
5/8"
Meter 2,000 gallons
1"
Meter 6,000 gallons
1-1/4"
Meter 9,000 gallons
1-1/2"
Meter 12,000 gallons
2"
Meter 20,000 gallons
3"
Meter 35,000 gallons
4"
Meter 50,000 gallons
6" and larger Meter 75,000 gallons
Fireline/Sprinkler Systems/Detecto Meter
Usage per 1,000 Gallons over Minimum (effective 06/01/14)
In Town
$ 13.75
21.75
29.25
36.75
56.75
94.25
131.75
194.25
50.00
1.70
Out of Town
$ 18.75
2.40
Based on Meter Size
26.25
28.25
26.25
75.00
Out of Town
$ 18.75
26.25
38.25
51.75
81.75
138.00
194.25
288.00
75.00
2.40
WATER SERVICE CONNECTION FEES: (Fixed Fees – Effective 04/01/13)
Residential (single family) line within 50 feet of a main distribution line of sufficient size, capacity and
grade. Includes the meter, labor and material. SCPW determines the location of the tap. Water
services of 2" or less that request a testable backflow device will be charged an additional fee based
on the type of device and the size of the meter.
In Town
Out of Town
5/8" Water Service
$1,250.00
$1,250.00
1"
Water Service
1,750.00
1,750.00
1-1/2" Water Service
3,000.00
3,000.00
2"
Water Service
3,750.00
3,750.00
3” or above Water Service – PLUS COST OF METER & BACKFLOW + 500.00
+ 500.00
1
SCPW Schedule of Fees and Service Charges - Updated 07/01/14
SEWER SERVICE CONNECTION FEES: (Fixed Fees – Rev 04/01/13)
Residential (single family) line within 50 feet of a main distribution line of sufficient size, capacity and
grade. Includes the meter, labor and material.
In Town
Out of Town
Sewer Service Connection Fee
450.00
675.00
Sewer Inspection Fee
30.00
30.00
FACILITY COST RECOVERY FEE: Water/Sewer (Effective 06/01/96 / Rev 07/01/05 / Rev 06/01/14)
Assessed to all new or expanded residential/commercial water and sewer users. Exempt are
individuals In Town paying the monthly sewer rate prior to June, 1989.
Meter Size
5/8"
1"
1-1/2"
2"
3"
4"
6" or larger
Water FCRF
$ 715.00
1,190.00
2,380.00
3,810.00
7,150.00
11,910.00
23,830.00
High Volume FCRF
$ 2,145.00
3,570.00
7,140.00
11,430.00
21,450.00
35,730.00
71,490.00
Sewer FCRF
$ 920.00
1,540.00
3,070.00
4,910.00
9,200.00
15,330.00
30,660.00
High Volume FCRF
$ 2,760.00
4,620.00
9,200.00
14,720.00
27,600.00
46,000.00
92,000.00
FACILITY COST RECOVERY FEE: Irrigation Meters or Dedicated Fireline Sprinkler Systems:
Irrigation meters or dedicated fireline sprinkler system services will be charged the water FCR Fee for
the specific line size. A sewer FCR Fee will apply to any water meter providing a discharge into the
SCPW wastewater collection system.
Meter Size
5/8"
1"
1-1/2"
2"
3"
4"
6" or larger
Water FCRF
$ 385.00
640.00
1,280.00
2,050.00
3,850.00
6,420.00
12,830.00
High Volume User:
Food service establishments, commercial residential facilities (nursing homes, hospitals, major
medical treatment facilities, institutions, prisons), school facilities, hotels and motels, apartment
complexes, laundromats, hair care facilities, car washes, grocery stores and industrial facilities using
production or cooling water.
Master meters with multiple residential or commercial users may be classified as a high volume user.
The staff may designate any user as "high volume" based on the actual water use of the customer or
similar customers within the water system. A "high volume" will generally be a user that exceeds
300% of the minimum use for the specific meter size. A "high volume" apartment or multiple
residential unit will be the user that exceeds the number derived when the high volume fee is divided
by the standard residential fee. Example: 2" meter – High Volume Fee of $11,430.00 / standard
residential fee of $715.00 = 15.98. Sixteen (16) units would be a high volume user.
Change in Use:
A change in the use of an existing water meter to a high volume water use will be charged a FCR Fee
based on the difference of the standard fee and the high volume fee and will apply to both the water
and sewer FCR Fee.
2
SCPW Schedule of Fees and Service Charges - Updated 07/01/14
HIGH VOLUME RATE SCHEDULE:
Minimum Monthly Charge
Additional Volume to 10,000,000 gallons
Additional Volume over 10,000,000 gallons
Additional Volume over 20,000,000 gallons
•
•
•
•
$7,500.00 up to 5,000,000 gals
$1.50 per 1,000 gals
$1.30 per 1,000 gals
$1.10 per 1,000 gals
The monthly volume charge is based on the total usage of all meters assigned to the customer’s
account.
A monthly meter charge of $54.00 per meter would also be applied.
Specific account requirements and/or conditions will be included in a water service customer
contract.
Public, wholesale water customers will be required to pay for the cost of any metering device and
its installation. Any Facility Cost Recovery Fee will not apply.
NORTH CHARLESTON SEWER DISTRICT FEES:(Rev 07/01/14)
Non-refundable Sewer Account Origination Fee
Residential Sewer Connection Fee
Sewer Inspection Fee - (Per Inspection)
Monthly Residential NCSD Sewer Rate-Base Charge
Monthly Residential NCSD Sewer Rate-Per 1000 gallons of water usage
Monthly Residential NCSD Sewer Minimum Bill
Maximum Residential Sewer Rate*
*Only available for single1 house, 1 meter residential customers
$ 30.00
1,400.00
60.00
9.95
5.69
22.73
78.23
DORCHESTER COUNTY W&S SEWER FEES: (05/01/14)
Non-refundable Sewer Account Origination Fee
$
Monthly Residential DCW&S Sewer Rate (Flat Rate)
Monthly Commercial DCW&S Sewer Rate (based on water usage) – first 7,000 gals
Monthly Commercial DCW&S Sewer Rate (based on water usage) – every 1,000 gals after 7,000 gals
25.00
37.90
37.90
7.01
LINE EXTENSION FEE: (Established by Commissioners)
A line extension for a water/wastewater construction project approved by Commissioners
Azalea Estates/Clemson Terrace Water Line Fee
$ 370.00
Ancrum Lane Water Line Fee
100.00
Ayers Drive Sewer Line Fee (approved 11/28/00 - Phase 2 approved 11/28/06)
3,250.00
Classic Street Sewer Line Fee (6 lots)
1,575.00
Country Club Sewer Line Fee - with easement
Country Club Sewer Line Fee - without easement
1,500.00
2,500.00
Daniels Orchard Sewer Line Extension (07/13)
$1,768.00
Eastport Ind. Park Water Line Fee - (per acre) Deming Way, Belgium Way Rd,
Spaniel Ln and Hodge Rd (revised 10/98)
3
$
615.00
SCPW Schedule of Fees and Service Charges - Updated 07/01/14
LINE EXTENSION FEE: (continued)
Farm Road Sewer Extension Fee (10 existing or future businesses)
Farm Road Water Extension Fee (10 existing or future businesses)
Germantown Sewer Line Fee - Non HUD Eligible
670.00
Hodge Road Line Extension Fee (North side of Hodge Rd)
To Be Determined
Holiday Drive Sewer Line Extension Fee (10 Year Agreement effective 12/02/08)
TMS 221-00-00-101 (Essex Farms, LLC)
I-26 - N. Main Market, Marymeade Dr., Jockey Ct - Water Line Fee
I-26 - South Pointe Estates, Azalea Square, Weatherstone - Sewer Line Fee
Meter Size
5/8"
1"
1-1/2"
2"
3"
4"
6" or larger
4,200.00
1,000.00
N Main Market, Marymeade Dr
& Jockey Ct Properties
Water
High Volume
Line Fee Water Line Fee
$
75.00
$
225.00
150.00
375.00
300.00
750.00
450.00
1,200.00
750.00
2,250.00
1,275.00
3,750.00
2,550.00
7,500.00
$5.46 per gallon of
wastewater capacity
See Chart Below
See Chart Below
South Pointe Estates, Azalea Square
& Weatherstone Properties
Sewer
High Volume
Line Fee
Sewer Line Fee
$ 78.00
$ 234.00
156.00
390.00
312.00
780.00
468.00
1,248.00
780.00
2,340.00
1,326.00
3,900.00
2,652.00
3,900.00
Industrial Circle Water Line Fee
100.00
Maple Street Water Line Fee (Elks Lodge Lane Only)
676.00
Ladson-Oakbrook Shopping Ctr Out Parcels Water Line Fee - TMS #161-00-00-068
Ladson-Oakbrook Shopping Ctr Out Parcels Water Line Fee - TMS #161-00-00-069
2,800.00
3,200.00
Ladson-Oakbrook Shopping Ctr Out Parcels Water Line Fee - TMS #161-00-00-070
Ladson-Oakbrook Shopping Ctr Out Parcels Water Line Fee - TMS #161-00-00-072
2,700.00
450.00
Orchard Hill Water Line Fee } 6 lots
Orchard Hill Sewer Line Fee }
TMS #136-02-00-003, 136-06-01-004, 136-06-02-009,
136-06-02-022, 136-06-03-003, 136-06-03-004
Pecan Grove Subdivision - Pecan Drive Water Line Fee
100.00
100.00
750.00
Pineview Acres Sewer Line Fee - 2 lots (TMS #130-14-13-001 and 130-14-13-002)
2,600.00
Renau Boulevard Water Line Fee (23 lots)
1,435.00
Shepard Park Sewer Line Fee
1,500.00
Shepard's Village Water Line Fee (6 lots)
Shepard's Village Sewer Line Fee (6 lots)
2,860.00
5,250.00
4
SCPW - Schedule of Fees and Service Charges - Updated 07/01/14
LINE EXTENSION FEE: (continued)
Summerville Heights Sewer Line Fee
1,500.00
Tea Farm Sewer Line Fee - with easement
Tea Farm Sewer Line Fee - without easement
$ 1,500.00
2,500.00
Tri-County Industrial Park Water Line Fee - International Circle (per lot) (total of 5 lots)
Tri-County Industrial Park Water Line Fee - Innovation & McQueen (per acre)
2,480.00
1,300.00
Tri-County/McQueen Industrial Park Water Line Fee - Thorpe Road (per lot)
21 lots on east side of Thorpe Rd
525.00
Tri-County/McQueen Industrial Park Water Line Fee - Thorpe Road (per acre)
Vacant land on West Side of Thorpe Rd
785.00
Trolley/Community Rds & Limehouse Dr Sewer Line Fee (per ERU)
5,500.00
Trolley Rd/Crestview Dr Sewer Line Fee (per ERU)
5,500.00
Waring Street Water Line Fee - 2 lots (TMS #137-09-02-009 & 087)
Waring Street Sewer Line Fee - 2 lots (TMS #137-09-02-009 & 087)
1,500.00
1,575.00
Woodland Estates Sewer Line Fee
4,500.00
BACKFLOW INSTALLATION FEE: (Effective 04/01/13)
Any testable backflow device 2" or less installed by Summerville CPW (labor and materials):
Meter Size
5/8"
5/8"
1"
1-1/2"
1-1/2"
2"
2"
3” or Above
Backflow Device
Fee
1" Double Check Valve Assembly
$ 350.00
1" Reduced Pressure Assembly
600.00
1" Reduced Pressure Assembly
600.00
2" Double Check Valve Assembly
650.00
2" Reduced Pressure Assembly
1,150.00
2" Double Check Valve Assembly
650.00
2" Reduced Pressure Assembly
1,150.00
3” or Above Double Check or Reduced Pressure Varies
FIRE FLOW TESTING FEE:
Fire Flow Fee will be charged to anyone requesting a second fire flow test less than
six (6) months after the first fire flow test.
FIRE HYDRANT FEES:
Fire Hydrant Meter Deposit - Commercial Only (Refunded after meter pickup & payment)
Charge Equal to In-Town Fee for 1" Meter
Fire Hydrant Water Use Permit Annual Fee (plus usage @ $1.50/1,000 gals)
Fire Hydrant Water Use Permit Fee - Additional Hydrant Tag (each)
Fire Hydrant & Installation
5
100.00
1,000.00
16.00
100.00
40.00
Cost
SCPW - Schedule of Fees and Service Charges - Updated 07/01/14
GREASE TRAP INSPECTION FEE:
Grease Trap Inspections will be done on a semiannual basis. If a facility requires a
Follow-up inspection after the semiannual inspection, the fee will apply.
25.00
LEAK CALLS ON COMMUNITY IRRIGATION SYSTEMS:
Fee for responding and excavating community irrigation systems
Labor and material to be determined & billed*
Varies
LINE REPAIR FEE:
Fee for repairs to water/sewer lines (i.e. line cut by other utility companies).
Labor and material to be determined & billed*
Varies
METER ADJUSTMENT FEE: (rev. 12-01-06)
Applies when meter has been set and meter has to be adjusted due to final grade.
This fee also applies to requests to reduce the size of an existing meter (2" or less).
200.00
METER UPGRADE FEE:
Applies when the water meter size increases (i.e. 5/8" to 1"). The cost is based
on the difference in the connection fee and facility cost recovery fee.
MISCELLANEOUS FEES AND CHARGES:
Aerial Photos:
Per Sheet
Per Set (26 sheets)
Blueprints/Xerox
Community/Association Pool/Irrigation Fee - Service Off/On
Engineering Manual
History Reproduction (per page)
Photo Copies
Video Tape / Video CD
PLAN NAME REVISION FEE:
Applies to any project renamed after permitted
Varies
5.00
100.00
5.00
10.00
25.00
1.00
0.25
30.00
250.00
PLAN REVIEW FEE: (Rev. 07-01-05)
Applies for any water/sewer line project up to $100,000
Applies for any water/sewer line project over $100,000
Applies for any water/sewer line project over $250,000
6
250.00
500.00
750.00
SCPW Schedule of Fees and Service Charges - Updated 07/01/14
PRIVATE WASTEWATER SERVICE REPAIR POLICY (revised 08/23/11):
If corrective measures have not been completed within the allotted time period, SCPW may assess
the customer a monthly fee to recover the costs associated with additional line maintenance efforts,
depleted capacity and treatment of groundwater/stormwater. The monthly fee may be charged until
the identified problems have been satisfactorily corrected. SCPW personnel are also authorized to
address and cure the defect immediately to prevent a failure of the collection system or an overflow of
the sewer system. If repairs are made by SCPW personnel, the customer may be assessed an
additional sewer service charge on their account. Assessment amounts are described below
After 60 Days
In Town
$ 0
Monthly Assessment Charge
After 60 Days
After 180 Days
Out of Town
In Town
$ 0
$ 0
After 180 Days
Out of Town
$ 0
External Defects:
Broken pipe, separated
joints, missing cleanout caps
$ 15 minor defects
$ 30 major defects
$ 20 minor defects
$ 40 major defects
$ 30 minor defects
$ 60 major defects
$ 40 minor defects
$ 80 major defects
Unauthorized Connection:
Roof/yard/foundation
drains/loading docks,
cooling water
$ 30 minor defects
$ 60 major defects
$ 40 major defects
$ 80 major defects
$ 60 minor defects
$120 major defects
$ 80 minor defects
$160 major defects
Unauthorized Connection:
Unbilled Customer
Prevailing Fees
Prevailing Fees
Prevailing Fees
Prevailing Fees
Identified Problem
Internal Defects:
Dry traps, toilet seals,
blocked vents
SEPTAGE RECEIVING FEE (Per 100 gallons):
$
SERVICE CONSTRUCTION FEE:
Residential line over 50 feet or any length multifamily, commercial or industrial line
that is required. Labor & material to be determined and billed.*
* SET CHARGES FOR DETERMINING BILLING:
Air Compressor - per day**
Asphalt Saw - per day**
Backhoe and Trailer - per hour**
Dump Truck - per day (for hauling soil/debris)**
Generator and Lights - per day**
Inspections - per man hour
Labor - per hour (includes hand tools)
Mud Hog Pump - per day**
Pickup Truck - per day**
Sewer Camera Truck - per foot - (includes two man crew)
travel charge of $0.50 per mile will be added
Tapping Machine - per inch (within 5 miles of SCPW service area)**
Trash Pump - per day**
Vactor Truck - per hour (includes two man crew)
time charged from time truck leaves garage until it returns. Customer responsible for all
disposal arrangements & charges
** Labor not included
7
6.50
Varies
67.50
250.00
50.00
235.00
62.50
30.00
28.00
50.00
25.00
0.75
50.00
150.00
100.00
SCPW Schedule of Fees and Service Charges - Updated 07/01/14
SEWAGE BLOCKAGE POLICY REIMBURSEMENT (rev 09/01/12)
The Commissioners have established a policy to reimburse our customers for plumber’s
fees up to but not exceeding $200.00 for work performed on the customer’s property if
the work was required because of a problem in the sewer tap or sewer main.
200.00
SEWER CAST IRON CLEANOUT BOX FEE
Fee applies when cast iron cleanout box is requested
100.00
SEWER SERVICE ABANDONMENT FEE:
Charged when old sewer service line is abandoned and capped by SCPW Crews
175.00
8