Boarding Area F - Airport Security Conference

The FCO Infrastructure Development Plan
Giorgio Gregori
Infrastructures Executive Vice President
Aeroporti di Roma
Agenda
1
Current FCO airport
2
FCO south completion plan – medium term development
3
FCO north development – long term development
2
1. Current FCO airport
Fiumicino Airport
30 km from center of Rome
3
1. Current FCO airport
FCO current layout
Runways
Airport area
1.588 ha
RWY
size
16R/34L
3.902 x 60 m
07/25
3.307 x 45 m
16L/34R
3.902 x 60 m
16C/34C
3.602 x 45 m
RUNWAY
90 mov/h
CAPACITY
N
4
1. Current FCO airport
FCO current layout
Terminals
Four Terminals
Five boarding areas
315.000 sqm
36,3 MLN pax in 2013
5
2. FCO south completion plan
Final configuration
Fiumicino South Completion Plan approval: July 2011 by ENAC
EIA Decree: August 2013 by MIBACT e MATTM
G
J H
F
E
D
C
B
A
Existing infrastructures
New infrastructures
T4
T3
T1
• Fourth Runway
• Infrastructures flexibility
• %LB gate from 42% to 52%
• New 180,000 sqm of Terminal and
• 44 additional aircraft stands
• People Mover
• Two new baggage systems
• Six new Multistorey car parks
boarding areas extension
6
2. FCO south completion plan
Terminal 3 Extension and Boarding Area F
Data & figures for new infrastructures
• Passenger capacity 5 MPPY
• 2 aircraft stands code E and 2 code F with direct boarding to A380 upper deck
• Additional 90.000sqm Terminal surface
• New services areas and VIP lounges
• Additional 14 LB gates and 8 remote gates
• New baggage system
• 4/6 gates for NO SCH flights
• ‘A’ class after energetic assessment
Highest rate of flexibility, quality with special focus on Italian design and materials
7
2. FCO south completion plan
Terminal 3 Extension
Upper Level – Terminal 3: Existing and Extension
8
2. FCO south completion plan
Boarding Area F
Departures Level – New Boarding Area F
9
2. FCO south completion plan
Boarding Area F
Departures Level – New Boarding Area F
10
2. FCO south completion plan
Boarding Area F
Departures Level – New Boarding Area F
11
3. FCO north development
FCO South / FCO North
FCO NORTH
respond to the growth
potential of the medium
/ long term
FIUMICINO NORTH
1300 ha
FCO SOUTH
expand and modernize
the existing infrastructure,
increasing the level of
service
FIUMICINO
SOUTH
1600 ha
12
3. FCO north development
Runway’s future layout
13
3. FCO north development
New Terminal capacity
1st PHASE: +35 mppa
2st PHASE: +15 mppa
14
3. FCO north development
Masterplan
General zoning at 2044
15
3. FCO north development
Long term development
• Main Hub in Mediterrean framework
• High Level of service
• 1.300 hectars of airport area extension
• Up to five runways
• New Terminal
• 70% loading bridge gates
• High grade of flexibility
• Ground Transportation Center
• 50 ha Environmental Park
• High percentage of renewable energies usage
• Links to roads and railway systems and South
Terminals
16
3. FCO north development
New Terminal
Rendering
17
3. FCO north development
New Terminal
Rendering
18