The FCO Infrastructure Development Plan Giorgio Gregori Infrastructures Executive Vice President Aeroporti di Roma Agenda 1 Current FCO airport 2 FCO south completion plan – medium term development 3 FCO north development – long term development 2 1. Current FCO airport Fiumicino Airport 30 km from center of Rome 3 1. Current FCO airport FCO current layout Runways Airport area 1.588 ha RWY size 16R/34L 3.902 x 60 m 07/25 3.307 x 45 m 16L/34R 3.902 x 60 m 16C/34C 3.602 x 45 m RUNWAY 90 mov/h CAPACITY N 4 1. Current FCO airport FCO current layout Terminals Four Terminals Five boarding areas 315.000 sqm 36,3 MLN pax in 2013 5 2. FCO south completion plan Final configuration Fiumicino South Completion Plan approval: July 2011 by ENAC EIA Decree: August 2013 by MIBACT e MATTM G J H F E D C B A Existing infrastructures New infrastructures T4 T3 T1 • Fourth Runway • Infrastructures flexibility • %LB gate from 42% to 52% • New 180,000 sqm of Terminal and • 44 additional aircraft stands • People Mover • Two new baggage systems • Six new Multistorey car parks boarding areas extension 6 2. FCO south completion plan Terminal 3 Extension and Boarding Area F Data & figures for new infrastructures • Passenger capacity 5 MPPY • 2 aircraft stands code E and 2 code F with direct boarding to A380 upper deck • Additional 90.000sqm Terminal surface • New services areas and VIP lounges • Additional 14 LB gates and 8 remote gates • New baggage system • 4/6 gates for NO SCH flights • ‘A’ class after energetic assessment Highest rate of flexibility, quality with special focus on Italian design and materials 7 2. FCO south completion plan Terminal 3 Extension Upper Level – Terminal 3: Existing and Extension 8 2. FCO south completion plan Boarding Area F Departures Level – New Boarding Area F 9 2. FCO south completion plan Boarding Area F Departures Level – New Boarding Area F 10 2. FCO south completion plan Boarding Area F Departures Level – New Boarding Area F 11 3. FCO north development FCO South / FCO North FCO NORTH respond to the growth potential of the medium / long term FIUMICINO NORTH 1300 ha FCO SOUTH expand and modernize the existing infrastructure, increasing the level of service FIUMICINO SOUTH 1600 ha 12 3. FCO north development Runway’s future layout 13 3. FCO north development New Terminal capacity 1st PHASE: +35 mppa 2st PHASE: +15 mppa 14 3. FCO north development Masterplan General zoning at 2044 15 3. FCO north development Long term development • Main Hub in Mediterrean framework • High Level of service • 1.300 hectars of airport area extension • Up to five runways • New Terminal • 70% loading bridge gates • High grade of flexibility • Ground Transportation Center • 50 ha Environmental Park • High percentage of renewable energies usage • Links to roads and railway systems and South Terminals 16 3. FCO north development New Terminal Rendering 17 3. FCO north development New Terminal Rendering 18
© Copyright 2024 ExpyDoc