0 100 File ref - p:\pth highways\1202798 marjon link road\5.0 cad - drawings\work area\highways\1 live drawings\1202798 - con - 100 - 001 - f- shared use general arrangement plan.dwg 00 0. 0 00 NOTES Proposed area of concrete surfacing to act as vehicle over-run area. .0 10 00 .0 20 00 .0 30 Proposed devon hedge end constructed 00 .0 50 00 P 0 .00 0 4 E G D RI B M LY NE A L N 1. The specification for the works shall be based on SHW and Plymouth City Council Standard Details . 2. The contractor shall comply with all the special requirements of the utility companies. Copies of the existing plant locations are provided in the PCI. 3. For Design Hazards refer to App F in PCI. 4. All traffic management shall be approved and comply with Chapter 8 of the Traffic Signs Manuals. 5. Prior to commencement of works, signs shall be installed on both approaches informing public of commencement date, length of works and funding sponsors including PT&H and Sustrans (SD1.1.2, 1.3 12.6) 6. Temporary "new junction layout ahead" (SD12.TS.4-S6) signs to be installed on both approaches and shall be removed 3 months after completion of works and returned to Amey Depot, Prince Rock. 7. For all proposed street lighting details and ducting layouts refer to WPD drawings. 8. Setting-Out to be carried out by Contractor before site works commences and agreed with the Engineer. Coordinates are available on request. 9. All vertical faces in existing surfaces shall be formed using a suitable powered saw. 10.Horizontal clearance of new signs and street furniture from kerb face to be 600mm unless stated otherwise. 11. All excavation works will require services to be marked out and operate hand dig in areas accordingly. All soft spots at sub-formation level are to be excavated and filled with class 6F1 material to clause 613. 12. All litter, loose vegetation and debris shall be collected and disposed accordingly. 13. Topsoil to verges to be 150mm thick seeded with grass seed to PCC specification. Grassed areas to be compacted with suitable roller. 14.Reinstate all surfaces (de-stone & roll) adjacent to works & do litter pick before completion of works. 15. All verges shall be 25mm lower than the top of concrete edge to prevent debris entering path surface. Where verge is a cut batter it shall be 50mm. The edging shall be slightly lower than path surface to avoid water ponding. 00 Proposed drainage channel 000 Proposed alterations to shared use cycleway / footway as proposed by HYDROCK. .00 .0 10 60 70.000 0 50. 00 20 .0 00 40.0 50.000 40.000 30.000 20.000 10.000 0.000 250.000 30.000 0 0.000 .0 80 New kerb alignment to tie into existing island. See latest revision of drawing 1202798-CON-600-005-(2) .00 00 30 20.000 10 .0 .0 70 00 6 0 0. Shared cycleway / footway as proposed by HYDROCK. 000 00 240. 00 0.0 0 0.0 23 Proposed roundabout featuring 28.8m ICD Proposed alterations to existing car parking layout. Proposed kerb based surface water drainage system. Please see drawing 1202798 - CON - 500 - 001 0 0 00 . 0 22 Proposed off-road shared use cycleway / footway 2.5m wide with min 0.5m safety zone 0 0. 00 21 00 20 Proposed cycle off ramp N JO AR M Proposed bus stops with raised access bus boarder kerbs and shelter. 0 0. 00 .0 0 19 00 0 0. LI 18 NK 00 0 0. AD RO 17 0 0 0.0 16 Proposed kerb based surface water drainage system. Please see drawing 1202798 - CON - 500 - 001 Northern Junction 0 Plymbridge Lane / Marjon Link Road 150.00 Proposed area of low growth grass mixture to improve visibility for drivers travelling south to north Scale 1:200 140.0 00 130. 000 Proposed kerb based surface water drainage system. See latest revision of drawing 1202798-CON-500-01. Southern Junction Marjon Link Road / Derriford Road 120. Scale 1:200 000 Proposed off-road shared use cycleway / footway 2.5m wide with 0.5m safety zone 110. 000 AD Proposed alterations to existing car parking layout. 100. K RO 000 N LIN 12 5.7 7 12 5 12 .74 5.6 2 12 5.6 5 5.1 5 MH 12 :12 5 5.1 12 .07 4.9 0 6 5 122. .59 28 14 ADC ADC 22.07.14 C Cycle on/off ramp and Highways Engineer parking area added at Southern junction. Kerblines, crossing and islands amended at Northern junction Addition of cycle on ramps at Derriford Rd Junctions where widths allow. Addition of cycle off ramp south of bus stop on Link Rd. Amendments to kerbing and surfacing in car park extension. Key amended. ADC ADC 27.06.14 DERRIFORD ROAD 120. 120. Kerblines changed on East side of Marjon Link Road to drainage kerbs. Hatch area on grass verge corrected. Islands,keblines, dropped kerbs, earthworks and chainage lines amended. B 18 10.000 DER RIFO 57 120.19 120.08 119. 45 119. 119. 52 RD R OAD 12 0 11 .05 9.9 3 12 0.1 1 6 19.1 GU:1 84 :1 TV 84 CA 73 118. 118. 118. 0.000 38.000 35.000 A Rev Initial Issue for Tender Revision details Drawn: Design: Chkd: Appd: Date: JLC JLC ADC ADC MAY 2014 ADC ADC 30.05.14 ADC ADC 13.05.14 Chkd Appd Date 2 18.4 7 12 9.2 Proposed traffic signal controlled junction on Derriford Road, with crossing facilities for cycles and pedestrians. For details please refer to the following drawings: 118. 12 118. 00 118. 11 9 11 .13 9.2 4 11 0 8.5 11 .61 8 11 TARMA C 93 117. 119.40 43 117. 6 48 71 117. .83 117 Preliminary For comment For tender For construction As constructed Other 15.000 6 16.9 :1 MH .88 99 117. 117 LP 25.000 20.000 1202798 - CON - 400 - 001 1202798 - CON - 1200 - 001 1202798 - CON -1200 - 003 17.2 117. 41 117. HFS Proposed edging kerb, type varies by location. constructed to PCC SD 11.41 :1 31 GU AC 117. RM 76 .02 :118 MH TA 118. .08 119 .58 118 55 120. 8 0.7 12 20 118. LP 30.000 118.16 119.57 119.69 10 120. 119.51 0.000 29 122. 18 121.76 GU:121.86 121.88 121.83 :120 GU 120. RAMP 20.000 10.000 Proposed cycle on/off ramp 20.000 3 122.3 0 81 120.60 120.40 120.53 BT:1 ADC ADC 05.08.14 D 30.000 Proposed devon hedge 93 120.8 120. 120. 74 99 120. 120.25 121. 49 121 .59 120.28 .51 92 119. 04 120. .12 120 2 .2 120 9 Proposed HB2 Kerb to PCC SD 11.46A 121 .84 42 LP 119 2 120.6 Assumed position of existing underground storage tanks. 121. 121 .6 121 3 .74 30.000 122. 63 64 122. 122.19 122.36 122.3 9 122.69 122.58 122.49 14 120. 0.67 MH:12 27 121. 05 121. 17 121. 78 116. 116. Proposed cycle on ramp 28 .25 116 35 117. 117. Proposed Envirokerb drainage run 88 Proposed land drain to PCC SD 5.26 Type B .10 117 .22 117 .34 116 .60 116 .79 116 .72 116 Proposed road markings (see drawing separate drawing for Diagram numbers) 116 0.000 115 .94 .74 Proposed pedestrian guardrail (Hi visibility) installed to PCC SD 4.1 .82 115 .09 116 1 116 .27 4 5.4 11 9 6.3 11 Proposed pedestrian guardrail (PG/1) installed to PCC SD 4.1 .2 116 Proposed road studs to PCC SD 12.4 5.4 11 11 7 4.9 5 5.6 0 11 5.6 11 5 1 5.6 Proposed red (controlled crossing) tactile paving to PCC SD 11.53 and 11.66, associated Kerb detail to PCC SD 11.46 and 11.39 11 Civic Centre | Armada Way | Plymouth | PL1 2AA Public Helpdesk 01752 668000 9 6 5.0 5 11 15.0 1 2 5.0 11 7 3 4.5 1 11 4.5 11 9 4.4 11 Proposed buff (uncontrolled crossing) tactile paving to PCC SD 11.52, associated Kerb detail to PCC SD 11.46 and 11.39. 4.3 11 AC M R TA Proposed buff (corduroy hazard warning PCC SD 11.16) tactile paving laid in accordance with PCC SD 11.66. 4.8 11 P:\PTH Highways\1202798 Marjon Link Road\5.0 CAD - Drawings\Work Area\Highways\1 Live Drawings\1202798 - CON - 100 - 001 - F- SHARED USE GENERAL ARRANGEMENT PLAN.dwg, 05/11/2014 12:19:02, 130211 121.44 121.30 121.36 34 C MA TAR .32 44 120. 53 120. C MA TA R .36 121 .71 LP ADC ADC 03.11.14 .61 121 .67 .96 119 120 120.64 120.76 122 40.000 Proposed parking area on footway for Traffic Engineer Drawing status amended "For Construction". Minor amendments to notes and key. Footway types, kerbing and one ASDL length amended. Hedge end added at Plymbridge Lane. Chainage added at Derriford Hospital Entrance. Drainage kerbing, channel and OS license amended 121 121 .95 76 120. 66 120. 20.3 120.95 121.06 121 .8 121 5 .94 TA RM AC S RM .46 120 7 .3 120 121.56 121.44 121.57 121.47 LP GR AS 121.58 E 121. 65 4 .11 121. 121. 69 121. 7 121.5 8 121.6 KEY 3 .40 122 120.81 .30 120 0 .2 120 121. 62 121. 52 8 4 122 .08 122.30 121.99 121.01 120.92 121.33 121.21 0.6 :12 2 1.6 121 .8 40.000 3 2.9 12 2.4 0 :12 SP 122 SP 2.4 118.76 BT SP 122.34 12 AC TA 121. 79 9 MH 122 .1 122 8 .28 12 12 122.23 121.67 14 122. 121.85 122.19 122.08 MH:122.25 5 0.2 12 .82 120 MK R FH :12 1.7 AC 1.7 9 W EL:122 .55 TA RM 50.000 4 9 2.8 12 12 2.8 TA C 2.6 2 122 .6 122.54 B CA V:1 MKR 22 .67 W V:1 SP 22 GAS:122.58 .62 121 .8 121 5 .77 CA TV :12 3 12 :12 1.9 2 122 .12 50.000 Proposed kerb based surface water drainage system. Details to be confirmed. 12 2.1 6 GU 122 .5 122 5 .64 122 .86 LP .10 122 .1 122 4 .05 5 122 .35 60.000 8 12 3.3 9 3.1 12 7 3.0 123.11 12 06 122 .94 123. 86 122. 66 122. 77 SP AC M TAR 122. 122.93 1 3.0 12 5 2.9 12 4 3.0 12 F 12 2.5 6 12 2.3 6 122 .29 MH :12 2.1 122. 49 122.95 123.04 119.46 C TA RU B MA C 9 123. 58 123.4 5 TAC TAC 32 42 .31 123 123. 123. 123 123.5 9 123.47 123.65 TAC .24 BO L 7 123.21 123.1 0 123.2 122.77 BO L TAC HFS .52 SC .60 TA R 7 3.5 3.3 122.99 BOL 120 12 2 122 .52 122 .44 122. 86 LP LP WV :12 2.6 5 12 12 123.86 123. 122. 88 12 60.000 12 2.8 6 .83 122 3 123.74 SP 84 122. 95 122. 3.7 12 7 1 70.000 1 7 5 124.0 124.1 124.11 124.22 124.28 12 3.4 3.0 SP 12 2 12 .76 2.7 0 123.55 CONC 12 CA TV :12 3.0 5 123.48 124.14 BOL CA B 80.000 3.8 21 12 124. 72 12 3.1 4 GU :12 3.0 8 79 122. 56 124. 67 C 124. RMA TA 124. BT:124.16 120.000 4.0 12 3.2 1 IC :12 3.1 12 4 3.0 4 123. 44 123. 33 130.000 12 .45 0 MH:123.76 Indicative extent of cut slope, 1:2 gradient to match existing. 140.000 7 C 12 3.7 S HF 70.000 Proposed extension of existing segregated cycleway / footway to join proposed shared use cycleway / footway. 9 150.000 TA RM A 9 3.7 12 3.8 12 3 124 4.4 12 S 12 4.0 0 TA RM AC 12 3.4 4 12 3.3 2 12 3 12 .38 3.4 8 160.000 2 7 0 5.1 12 HF 12 3.4 SP 170.000 4.4 4.6 SP Proposed off-road shared use cycleway / footway 2.5m wide with 0.5m safety zone LP 180.000 12 12 12 5.2 9 :12 3.6 2 190.000 12 7 1 4.8 4.3 9 4.1 7 12 4.0 12 12 2 4.9 1 12 3 12 .71 3.5 9 12 3 12 .64 3.7 6 0 FH :12 3.8 9 200.00 CV R Proposed off-road shared use cycleway / footway 2.5m wide with 0.5m safety zone .80 0 BT :12 4.1 9 12 3 210.0 0 12 4.0 6 12 5.2 12 5.3 5.4 1 1 12 12 12 5.9 4 3 RE :12 4.0 8 12 3.9 1 00 .7 9 220.0 12 4.1 BOL CO NC 3 12 4 12 4.8 3 000 0 4.5 5.4 LP 6 :12 6.0 0 9 5.4 12 12 5 12 .69 5.7 7 SP BT 7 12 4 12 .51 4.3 9 5.0 12 12 12 6.4 0 12 230. 12 5.2 7 000 12 6 12 .24 6.3 3 00 90.000 12 4.5 Proposed Car park extension using previously set aside and new brick paving setts. 100.000 12 5.0 4 110.000 5.6 4 240. 12 00 80.0 MAR JO 12 12 5.7 6 90.0 Project Name MARJON LINK ROAD Proposed buff (cycle rib) tactile paving to PCC SD 11.15. Ladder pattern for footway and tramline pattern for cycle path. Proposed Shared footway/cycleway, construction type F2, surfacing finish to be black. Proposed footway construction type F1, surfacing finish to be black. Drawing Title HIGHWAYS Proposed Buff High Friction Surfacing (Type 1), refer to specification for details. Area of separate unrelated planning application. (Construction of a new Helipad and visitors Car Park) Proposed Red High Friction Surfacing (Type 1), refer to specification for details. General Arrangement Plan Showing Proposed North and South Junction Alignments Proposed Black High Friction Surfacing (Type 1), refer to specification for details. Proposed concrete infill to central reservation / traffic islands and shared use cycle/foot way safety zone consisting of 125mm ST5 on 150mm Type 1 sub-base, brushed finish with 100mm steel trowelled edge adjacent to kerbs. Proposed reinforced concrete overrun area in carriageway General Arrangement and Chainage Plan Showing Shared Use Footway / Cycleway Scale 1:500 Original Drawing Size : Scale : AS SHOWN A0 Dimensions : m Drawing No Rev 1202798 - CON - 100 - 001 F
© Copyright 2024 ExpyDoc