CusTomer-speCified Training

Customer-Specified Training
To
Fette Compacting GmbH
Training and Consulting
Mrs. Lena Hinsch
Phone : +49 41 51 125 69
E-mail: [email protected]
Company
Department
Name, First Name
Street
E-mail
City
Phone
ZIP
Choose from the following contents your training
Machine typ
Basics of the compression
Mechanical design of the tablet press
0.5 h
explanation of the mechanical parts
Functional principle
1 h
explanation of the process steps
Create a basic formulation
runs, formulation list, basic parameter
2 h
Practical exercise 4 h
start up a tablet production
Operation of the tablet press
Operation software
1 h
Control loop 1
compression force control
0.5 h
0.5 h
Control loop 2 and 3
weight adjustment, hardness control
0.5 h
3.5 h
Practical exercise
create a formulation with setting of limits
(weight/hardness) sorting, compression
force control, stop limits
4 h
Explanation of parameters for the IPC
2 h
screens and lists
User management login, autologout, parameter level
Explanation of the standard parameter
compression force, machine speed,
web height, filling depth, main compression force, compression force monitoring,
sorting, machine safty parameters
Explanation of the advanced standard
parameters
1.5 h
sorting limits, start relief, discharge gate,
special web height, pre compression
force monitoring, Punch-Saving-System,
deduster
Explanation and layout of the protocols
Optimization of the production
compression force signal,
100 individual
2 h
compression force and weight adjustment,
compression force s-rel, parts (fillcam/
FOM wheels/FOM-table/machine speeds)
0.5 h
batch protocol, diagnoses protocol,
change protocol
Explanation of the graphic
IPC parameter, sampling, protocols
0.5 h
Minimization of powder loss
Basics of a multi-layer tablet
1 h
functional principle, parameter settings
2 h
Customer-Specified Training
Technics
Mechanical design of the tablet press
0.5 h
Adjustment of the reference marks
1.5 h
Overview and principle of the
electronic components
0.5 h
switch cabinet, VME-bus, amplifier,
load cell, sensors
1.5 h
Explanation of the VME-Bus
Change of a compression roller
2 h
function, firmware-update,
initialization of the CPU
Overview and function of a compression
station and adjustable gear box
1 h
Explanation of the main drive
function, torque motor/gear box,
software program
1 h
Explanation of the Pilz Saftey PLC
1 h
Explanation of the central lubrication
system
0.5 h
CPU, CANopen, alarms
Adjustment of the punch break
0.5 h
Restore of an image
image CD, configuration, language pack
Maintenance and adjustment of the
FOM-table
1 h
1 h
Update of the visual software
0.5 h
Explanation of the force measuring
1.5 h
Maintenance and adjustment of the ejector 1 h
amplifier, signal control, zero balance
Maintenance and adjustment of the dosage 1 h
Adjustment of the tablet scraper and
sorting
1 h
Mechanical wear parts
3 h
Network and CAN-Bus communications
1.5 h
Battery replacement
0.5 h
Comments
Signature
Please complete, print and sign this registration form and
e-mail to Mrs. Lena Hinsch.