All Those Fines!

All Those Fines!
Installation of GAC into
Deep Bed Contactors
1
Bonsteel1
Jane
Ray Cantwell2
Roshni Jerrett2
Steven Radencich3
Kathleen Boyd3
Alton Williams4
2
3
4
Lakeview WTP
400 ML/d expansion – ‘OBM2’
OMB2 Process Overview
Cl2
(Mussel)
NaOH
O3
Quench (Sodium Bisulphite)
H2O2(Future)
F,Cl2
Prescreening
Ozone
Contactors
Lake
Ontario
BACCs
UV
Membranes
Low Lift Pumps
To Conventional and OBM1 facilities
Backwash wastewater to
Process Waste Treatment Facility
Reservoir
High
Lift
Pumps
BACCs
Parameter
Length / Width
Surface area per contactor
GAC Media: Depth
Effective Size
Uniformity co-efficient
Water Level over media
Underdrains
Value
8.2 m / 15 m
123 m2
2.5 m
1.35 – 1.45 mm
1.5
3.5 m
AWI Phoenix stainless steel
with 300 micron openings
Laterals run lengthwise
BACC Underdrains
Air Scour
Conduit
Water
CollectionBackwash
Distribution
Conduit
300 µm
media
retention
slots
GAC by the numbers
1538
Amount of GAC installed in m³
780
Weight of GAC installed in tonnes
8.3
Weight of fines removed by scraping in tonnes
65
Total number of backwashes
Installation Plan
6
Protect the underdrains
z
6
Scrape the fines
z
6
~10 mm per lift
Protect the downstream membranes
z
6
3 ‘lifts’ (~0.8 m each)
Ensure no GAC in BACC effluent
Fit with existing operations
z
z
z
Aggressive schedule
Long, high volume backwashes
21 other filters/contactors in service
Conveying GAC
Conveying GAC
Scraping Fines
Scraped Fines
Waste bin
Backwashing
6
# of backwashes determined as it
progressed
BACC media backwashing tracking sheet
BACC No 1
10‐Oct
11‐Oct
12‐Oct
13‐Oct
14‐Oct
15‐Oct
16‐Oct
17‐Oct
18‐Oct
19‐Oct
20‐Oct
21‐Oct
22‐Oct
23‐Oct
24‐Oct
25‐Oct
BACC No 2
BACC No 3
BACC No 4
BACC No 5 Comments
5
6
7
8
4
4
5
5
BACC 1 bags added
4
BACC 2 and 3 bags added
6,7
8,9
BACC 4 bags added
6
10
5
Jar Testing
6
6
6
6
Guessed at solids concentrations
Needed to make fines
Polymers (anionic, cationic, non-ionic)
With and without alum
Backwashing
6
Photos
Backwashing
6
Photos
Backwash Monitoring
6
Suspended solids & turbidity
Backwash Monitoring
BACC No. 1: Backwash No. 4 on October 8th 2013
(1st Backwash of 2nd Lift)
500
70
Low Rate Wash
Starts
High Rate Wash
Starts
450
60
400
TSS
TSS (mg/L)
300
40
Turbidity
250
30
200
150
20
100
10
50
0
0
0
2
4
6
8
Time From Start (min)
10
12
14
Turbidity (NTU)
50
350
Backwash Monitoring
BACC No. 1: 8th and 13th Backwash- TSS Profile
70
High Rate
Wash Starts
Low Rate
Wash Starts
60
TSS (mg/L)
50
40
Backwash 8
30
20
Backwash 13
10
0
0
1
2
3
4
Time From Start (min)
5
6
7
Wastewater Treatment
6
6
Very limited sewer capacity
WTP’s WWTF effluent suspended solids
limit: 15 mg/L (annual average)
6
Visible
shoreline
discharge
Wastewater Treatment
Lakeview Process Waste Treatment Facility- TSS Profile
BACC No. 1: 2nd Backwash of the 2nd Lift on October 10th 2013
18
16
14
TSS (mg/L)
12
10
8
6
4
2
0
10:48
11:02
11:16
11:31
11:45
12:00
Time
12:14
12:28
12:43
12:57
Success!
2nd Forward Flush From BACC #1- Turbidity Profile
4
3.5
Turbidity (NTU)
3
2.5
2
1.5
1
0.5
0
0
2
4
6
Time From Start (min)
8
10
12
Summary
6
Co-operation & communication were crucial
z
6
Operations staff, consultant, contractor,
suppliers, owner
Now have documentation
Acknowledgements
Maajida Darsot, Peel Region
Tony Puim, OCWA
Lorenzo Marsiglia, OCWA
Scott Crawford, CH2M HILL
AWI
Norit Carbon