27-125 - Hydro One Brampton

27-125
CERTIFIED
ABC
HOBNI
UTILITY FEEDER 3 PH
HVI
POWER FUSE
P.C.C. AND DEMARCATION POINT LOCATED ON RISER POLE
CUSTOMER OWNED
CABLE
CUSTOMER OWNED
GANG OPERATED 3 POLE
LOAD INTERRRUPTER SWITCH
CUSTOMER OWNED TRANSFORMER
(MFD. TO HOBNI SPECIFICATIONS)
OR
FUSE DISCONNECT SWITCH
DG4
1. PQ METER FOR REG GREATER THAN OR
EQUAL TO 250 KW ONLY.
2. PQ METER TO BE LOCATED INSIDE
SCADA ENCLOSURE.
3. AUTOMATED DISCONNECT SWITCH (DG2)
TO HAVE BOTH OPEN AND CLOSED
FUNCTIONALITIES.
4. ALL EQUIPMENT TO BE LOCATED EXTERNAL
OF EXISTING BUILDING.
5. REFER TO STD. 27-120 & STD. 27-121.
SCADA ENCLOSURE
(36"x36"x12")
RTU
CENTRAL M ETERI
NG PANEL (
SEE NOTE 5)
NOTE :
DISCONNECT SWITCH
DG3
M
REG REVENUE
METER
POWER QUALITY
PQ
METER
(SEE NOTE 2)
AUTOMATED
DISCONNECT
SWITCH
PQ
M
(LOAD BREAK)
DG2
120V, 20A
GFI
MANUAL
DISCONNECT SWITCH
TERMINATION BLK
(LOAD BREAK)
DG2 STATUS (OPEN/CLOSE)
DG1
SCADA CONTROL (ON/OFF)
DG1 STATUS (OPEN/CLOSE)
G
NORMAL/TRIP STATUS
PQ METER INTEGRATION
APPROVED IN ACCORDANCE WITH REGULATION 22/04
CHECKED:
APPROVED:
----------------------
---------------------
ORIGINAL ISSUE:SEPTEMBER 05, 2014
SINGLE LINE DIAGRAM FOR DEDICATED
RENEWABLE ENERGY GEN. INSTALLATION
SCADA REQUIREMENTS & GENERAL LAYOUT