SCIENTIFIC CONFERENCE Uranium Graphite Reactors Decommissioning 14th / 16th of July, 2014 Lithuania „The Project is funded by IIDSF, managed by the EBRD“ Project Overview/ Объем проекта • Interim Spent Fuel Storage Facility (ISFSF). • Промежуточное хранилище отработавшего ядерного топлива (ПХОЯТ) • Dry storage for approx. 18,000 RBMK 1500 SFA in newly designed (CONSTOR ® RBMK 1500 M2) fuel casks. • Сухое хранение примерно 18000 ОТВС в новых контейнерах (CONSTOR ® RBMK 1500 M2) • Modifications to INPP Units SFPH’s for handling, loading of new fuel casks (including the reloading machines). • Модификация блочной части Залов Бассейнов Выдержки (ЗБВ) на энергоблоках № 1 и 2 для обращения и загрузки новых контейнеров (включая перегрузочную машину) • Damaged Fuel Handling System. • Система по обращению с поврежденным топливом Ignalina NPP decommissioning activities are co-financed by European Union 2 „The Project is funded by IIDSF, managed by the EBRD“ List of Subcontractors/ Перечень подрядчиков The Project Contractor is NUKEM Technologies GmbH and GNS Consortium (Germany). Подрядчиком проекта является консорциум NUKEM Technologies GmbH и (Германия). NUKEM Technologies GmbH together with PramProjektas (Kaunas) are the ISFSF designers. NUKEM Technologies GmbH совместно с PramProjektas (Каунас) являются проектировщиками ПХОЯТ. GNS (Germany) is the designer of CONSTOR® RBMK1500/M2 casks. GNS (Германия) является проектировщиком контейнеров CONSTOR® RBMK1500/M2. MAG (Germany) and SKODA (Czech Republic) are the manufacturers of CONSTOR® RBMK1500/M2 casks. MAG (Германия) и SKODA (Чехия)является изготовителями контейнеров CONSTOR® RBMK1500/M2. Ignalina NPP decommissioning activities are co-financed by European Union 3 „The Project is funded by IIDSF, managed by the EBRD“ Milestone Dates /Основные даты B1 Contract Award 12th January 2005. Подписание контракта 12 января 2005 года. EIA Report Submission 2007-1130. Предоставление Отчета ОВОС 2007-11-30. TDD/PSAR Submission 2006-0904. Предоставление ТП и 2006-09-04. ПОАБ November 2007 – TDD and PSAR Ноябрь 2007 года – предоставление ТП и ПОАБ в Submission to the State Государственные институции ЛР. Institutions of the Republic of Lithuania. On September 2, 2009 INPP obtained VATESI Licence for ISFSF Construction No. 2/2009 2 сентября 2009 года ИАЭС получила лицензию VATESI № 2/2009 на строительство ПХОЯТ. Ignalina NPP decommissioning activities are co-financed by European Union 4 „The Project is funded by IIDSF, managed by the EBRD“ Milestone Dates /Основные даты Completion of the Storage Facility construction is expected in September 2014. Завершение строительства хранилища ожидается к сентябрю 2014 года. ISFSF Cold Trial October December 2014. Холодные испытания ПХОЯТ октябрь –декабрь 2014. Unit 1 and Unit 2 Cold Trial October 2015- January 2016. Холодные испытания на 1 и 2 блоках ИАЭС октябрь 2015– январь 2016. Hot Trial (Unit 1 and Unit 2, ISFSF) June - December 2016. Горячие испытания комплекса ПХОЯТ июнь – декабрь 2016 ISFSF Industrial Operational Permission – October 2017. Получение Разрешения на промышленную эксплуатацию ПХОЯТ– октябрь 2017. Ignalina NPP decommissioning activities are co-financed by European Union 5 „The Project is funded by IIDSF, managed by the EBRD“ INPP Unit – General View Ignalina NPP decommissioning activities are co-financed by European Union 6 „The Project is funded by IIDSF, managed by the EBRD“ Spent Pool Hall - 1 Unit Ignalina NPP decommissioning activities are co-financed by European Union 7 „The Project is funded by IIDSF, managed by the EBRD“ Spent Pool Hall –Room 338/1 Ignalina NPP decommissioning activities are co-financed by European Union 8 „The Project is funded by IIDSF, managed by the EBRD“ Cask Arrival at Unit Ignalina NPP decommissioning activities are co-financed by European Union 9 „The Project is funded by IIDSF, managed by the EBRD“ Room 174 (Level +0,00 m, ShockAbsorber Type-3) Ignalina NPP decommissioning activities are co-financed by European Union 10 „The Project is funded by IIDSF, managed by the EBRD“ Room 632 - Cask Service Station Ignalina NPP decommissioning activities are co-financed by European Union 11 „The Project is funded by IIDSF, managed by the EBRD“ Room 632 - Cask Service Station Конейнер на ПОК_одевание ЮЗЗ_3 Ignalina NPP decommissioning activities are co-financed by European Union 12 „The Project is funded by IIDSF, managed by the EBRD“ Room 338/1, SA Type-1, 2 Ignalina NPP decommissioning activities are co-financed by European Union 13 „The Project is funded by IIDSF, managed by the EBRD“ Cask Loading - FBHE Ignalina NPP decommissioning activities are co-financed by European Union 14 „The Project is funded by IIDSF, managed by the EBRD“ 32-Basket Loading Ignalina NPP decommissioning activities are co-financed by European Union 15 „The Project is funded by IIDSF, managed by the EBRD“ Cask (with fuel) Transfer to CSS Ignalina NPP decommissioning activities are co-financed by European Union 16 „The Project is funded by IIDSF, managed by the EBRD“ INPP – ISFSF B1 Railway Ignalina NPP decommissioning activities are co-financed by European Union 17 „The Project is funded by IIDSF, managed by the EBRD“ ISFSF – Storage Hall Ignalina NPP decommissioning activities are co-financed by European Union 18 „The Project is funded by IIDSF, managed by the EBRD“ Layout of the Main ISFSF Building Storage Hall capacity - 202 casks Cask Service Station – 2 welding platforms for casks Hot Cell – for inspection and repackaging of the spent nuclear fuel (FB) Ignalina NPP decommissioning activities are co-financed by European Union 19 „The Project is funded by IIDSF, managed by the EBRD“ CONSTOR ® RBMK 1500/M2 CASK Protection Plate (40 thickness) Secondary Lid (40 thickness) • In the CONSTOR®RBMK-1500/M2 cask two baskets are placed: 32М basket and a Ring basket with 80 positions for fuel bundles. • Triple lid system (1primary lid bolted; seal plate and 2nd lid are welded). Additionally protection plate is bolted. • Concrete cover is placed on the cask. • Weight of the loaded cask ~ 116 tons. • Design storage period – 50 years. Seal Plate (40 thickness) Primary Lid (275 thickness) ø1948 488 Head Ring Trunnion Basket 32M (102 Positions) 4520 340 Ring Basket (80 Positions) Outer Liner Inner Liner CONSTORIT Weight: ~112 Mg (incl. 182 Fuel Bundles, Without Concrete Plate) 2628 S6200097 _ 5 Ignalina NPP decommissioning activities are co-financed by European Union 20 „The Project is funded by IIDSF, managed by the EBRD“ CONSTOR ® RBMK 1500/M2 CASK Height: 4520 m Diameter 2628 мм Empty cask - 90 t Loaded cask – 116 t Heating 12,55 kW Cask surface temperature 91 С Manufactured – 157 casks. The cask designed for: • to withstand a drop: from 9 meter onto solid surface • Fire accident: 800 C for 30 minutes 600 C for 1 hour • aircraft: Military aeroplane weight 1000kg, speed 300m/s, diameter 0.6m • seismic event: 8 grades (MSK-64 scale) Ignalina NPP decommissioning activities are co-financed by European Union 21 Thank you
© Copyright 2024 ExpyDoc