SCIENTIFIC CONFERENCE Uranium Graphite Reactors

SCIENTIFIC CONFERENCE
Uranium Graphite Reactors
Decommissioning
14th / 16th of July, 2014
Lithuania
„The Project is funded by IIDSF, managed by the EBRD“
Project Overview/ Объем проекта
• Interim Spent Fuel Storage Facility (ISFSF).
•
Промежуточное хранилище отработавшего ядерного топлива (ПХОЯТ)
• Dry storage for approx. 18,000 RBMK 1500 SFA in newly
designed (CONSTOR ® RBMK 1500 M2) fuel casks.
•
Сухое хранение примерно 18000 ОТВС в новых контейнерах
(CONSTOR ® RBMK 1500 M2)
• Modifications to INPP Units SFPH’s for handling, loading
of new fuel casks (including the reloading machines).
•
Модификация блочной части Залов Бассейнов Выдержки (ЗБВ) на
энергоблоках № 1 и 2 для обращения и загрузки новых контейнеров
(включая перегрузочную машину)
• Damaged Fuel Handling System.
•
Система по обращению с поврежденным топливом
Ignalina NPP decommissioning activities are co-financed by European Union
2
„The Project is funded by IIDSF, managed by the EBRD“
List of Subcontractors/
Перечень подрядчиков
The Project Contractor is NUKEM Technologies GmbH and GNS
Consortium (Germany).
Подрядчиком проекта является консорциум NUKEM Technologies GmbH и (Германия).
NUKEM Technologies GmbH together with PramProjektas (Kaunas) are
the ISFSF designers.
NUKEM Technologies GmbH совместно с PramProjektas (Каунас) являются проектировщиками
ПХОЯТ.
GNS (Germany) is the designer of CONSTOR® RBMK1500/M2 casks.
GNS (Германия) является проектировщиком контейнеров CONSTOR® RBMK1500/M2.
MAG (Germany) and SKODA (Czech Republic) are the manufacturers of
CONSTOR® RBMK1500/M2 casks.
MAG (Германия) и SKODA (Чехия)является изготовителями контейнеров CONSTOR®
RBMK1500/M2.
Ignalina NPP decommissioning activities are co-financed by European Union
3
„The Project is funded by IIDSF, managed by the EBRD“
Milestone Dates /Основные даты
B1 Contract Award 12th January
2005.
Подписание контракта 12 января
2005 года.
EIA Report Submission 2007-1130.
Предоставление Отчета ОВОС
2007-11-30.
TDD/PSAR Submission 2006-0904.
Предоставление ТП и
2006-09-04.
ПОАБ
November 2007 – TDD and PSAR Ноябрь 2007 года –
предоставление ТП и ПОАБ в
Submission to the State
Государственные институции ЛР.
Institutions of the Republic of
Lithuania.
On September 2, 2009 INPP
obtained VATESI Licence for
ISFSF Construction No. 2/2009
2 сентября 2009 года ИАЭС
получила лицензию VATESI №
2/2009 на строительство ПХОЯТ.
Ignalina NPP decommissioning activities are co-financed by European Union
4
„The Project is funded by IIDSF, managed by the EBRD“
Milestone Dates /Основные даты
Completion of the Storage Facility
construction is expected in
September 2014.
Завершение строительства хранилища
ожидается к сентябрю 2014 года.
ISFSF Cold Trial October December 2014.
Холодные испытания ПХОЯТ октябрь
–декабрь 2014.
Unit 1 and Unit 2 Cold Trial
October 2015- January 2016.
Холодные испытания на 1 и 2 блоках
ИАЭС октябрь 2015– январь 2016.
Hot Trial (Unit 1 and Unit 2,
ISFSF) June - December 2016.
Горячие испытания комплекса ПХОЯТ
июнь – декабрь 2016
ISFSF Industrial Operational
Permission – October 2017.
Получение Разрешения на
промышленную эксплуатацию ПХОЯТ–
октябрь 2017.
Ignalina NPP decommissioning activities are co-financed by European Union
5
„The Project is funded by IIDSF, managed by the EBRD“
INPP Unit – General View
Ignalina NPP decommissioning activities are co-financed by European Union
6
„The Project is funded by IIDSF, managed by the EBRD“
Spent Pool Hall - 1 Unit
Ignalina NPP decommissioning activities are co-financed by European Union
7
„The Project is funded by IIDSF, managed by the EBRD“
Spent Pool Hall –Room 338/1
Ignalina NPP decommissioning activities are co-financed by European Union
8
„The Project is funded by IIDSF, managed by the EBRD“
Cask Arrival at Unit
Ignalina NPP decommissioning activities are co-financed by European Union
9
„The Project is funded by IIDSF, managed by the EBRD“
Room 174 (Level +0,00 m, ShockAbsorber Type-3)
Ignalina NPP decommissioning activities are co-financed by European Union
10
„The Project is funded by IIDSF, managed by the EBRD“
Room 632 - Cask Service Station
Ignalina NPP decommissioning activities are co-financed by European Union
11
„The Project is funded by IIDSF, managed by the EBRD“
Room 632 - Cask Service Station
Конейнер на ПОК_одевание ЮЗЗ_3
Ignalina NPP decommissioning activities are co-financed by European Union
12
„The Project is funded by IIDSF, managed by the EBRD“
Room 338/1, SA Type-1, 2
Ignalina NPP decommissioning activities are co-financed by European Union
13
„The Project is funded by IIDSF, managed by the EBRD“
Cask Loading - FBHE
Ignalina NPP decommissioning activities are co-financed by European Union
14
„The Project is funded by IIDSF, managed by the EBRD“
32-Basket Loading
Ignalina NPP decommissioning activities are co-financed by European Union
15
„The Project is funded by IIDSF, managed by the EBRD“
Cask (with fuel) Transfer to CSS
Ignalina NPP decommissioning activities are co-financed by European Union
16
„The Project is funded by IIDSF, managed by the EBRD“
INPP – ISFSF B1 Railway
Ignalina NPP decommissioning activities are co-financed by European Union
17
„The Project is funded by IIDSF, managed by the EBRD“
ISFSF – Storage Hall
Ignalina NPP decommissioning activities are co-financed by European Union
18
„The Project is funded by IIDSF, managed by the EBRD“
Layout of the Main ISFSF Building
Storage Hall capacity - 202 casks
Cask Service Station – 2 welding platforms for casks
Hot Cell – for inspection and repackaging of the spent nuclear fuel (FB)
Ignalina NPP decommissioning activities are co-financed by European Union
19
„The Project is funded by IIDSF, managed by the EBRD“
CONSTOR ® RBMK 1500/M2 CASK
Protection Plate
(40 thickness)
Secondary Lid
(40 thickness)
• In the CONSTOR®RBMK-1500/M2
cask two baskets are placed: 32М
basket and a Ring basket with 80
positions for fuel bundles.
• Triple lid system (1primary lid bolted;
seal plate and 2nd lid are welded).
Additionally protection plate is bolted.
• Concrete cover is placed on the cask.
• Weight of the loaded cask ~ 116 tons.
• Design storage period – 50 years.
Seal Plate
(40 thickness)
Primary Lid
(275 thickness)
ø1948
488
Head Ring
Trunnion
Basket 32M
(102 Positions)
4520
340
Ring Basket
(80 Positions)
Outer Liner
Inner Liner
CONSTORIT
Weight: ~112 Mg
(incl. 182 Fuel Bundles,
Without Concrete Plate)
2628
S6200097 _ 5
Ignalina NPP decommissioning activities are co-financed by European Union
20
„The Project is funded by IIDSF, managed by the EBRD“
CONSTOR ® RBMK 1500/M2 CASK
Height: 4520 m
Diameter 2628 мм
Empty cask - 90 t
Loaded cask – 116 t
Heating 12,55 kW
Cask surface temperature
91 С
Manufactured – 157 casks.
The cask designed for:
• to withstand a drop: from 9 meter onto solid surface
• Fire accident:
800 C for 30 minutes
600 C for 1 hour
• aircraft: Military aeroplane weight 1000kg, speed 300m/s, diameter 0.6m
• seismic event:
8 grades (MSK-64 scale)
Ignalina NPP decommissioning activities are co-financed by European Union
21