Panama´s Metro Master Plan
Line 2
Line 1
Line 4
Line 3
LRT
Line 1 – Completed
November 2010 to February 2014
Line 1 properties:
Total length of 13.7 klm
and 12 stations:
- 7.2 klm & 6 stations
underground
- 5.2 klm & 5 stations
elevated
- 1.3 klm & 1 station in
transition (trench)
Rolling stock:
- Alstom series 9000
- 19 trains with 3 cars
System Properties
Design Demand (future)
40,000 p/h/d
Initial Demand (2015)
15,000 p/h/d
Overall Length
13.7 km. (7.2Km underground, 5.2 Km
overhead y 1.3 Km. transitions)
Stations
12 (6 underground, 1 semi-
Depot
10 hectare
Power
Catenary – 1500 v.
Minimum Headway
90 seconds
Rolling Stock
5 wagon trains(maximum)
Length 90 m.
Initial quantity: 19 trains of 3 wagons
underground & 5 overhead)
Line 1– Extension to San Isidro
June 2013 – January 2015
#2
#1 – Interchange
Widening
Northern Corridor
Transistmic
Challenge #3
Station
2.1 kilometers
El Ingenio
Underground Section
Tunnel
A 7 kilometer underground tunnel was constructed using two EPB tunneling machines
with outside diameter of 9.7 meters for two-way rail tracks.
Underground Section
Underground Stations
Fernández de
Córdoba
A total of 6 underground stations were constructed.
Semi-underground Station
The semi-underground station of Albrook is connected directly the Grand National Bus
Terminal by a 180 meter-long walkway
Elevated Section
Viaduct
The overhead section is comprised of a 5.2 kilometer viaduct with prefabricated beams
with two-way rail tracks
Elevated Section
Elevated Stations
Five elevated stations form part of the elevated section
Depot Area
A 10-hectare depot was constructed as part of the Line 1 Project
Rolling Stock
Rolling Stock
Alstom is supplying 19 trains with 3 wagons each at project star-up
Integration with MetroBus
and Future Metro Lines
Integration with MetroBus
and Future Metro Lines
Major Interchange Facilities:
Future Metro lines
MetroBus
Integration with MetroBus
The SMP initiated discussions with surface bus operator Mi Bus and ATTT
(administrator of MetroBus) for operational and tariff integration
Harness the insertion and operation of Line 1 of the Panama
Metro to create a new identity for Panama City to improve its
global competitiveness
• Promote urban planning and
renewal of the area:
densification and mixed land
use (residential, retail, service,
institutional and recreational)
• Recoup and create new
public space in a
sustainable manner to
generate multiple effects
New Public Spaces around the Stations
Lighting
Line 2 – Future Development
2014 - 2018
Hospital
del Este
Mañanitas
/Tocumen
UTP
Pedregal
Don Bosco
San Antonio
Brisas del Golf
Los Pueblos
Villa Lucre
El Crisol
San Miguelito 2
Transferencia
con Línea 1
Cincuentenario
Paraíso
Cruce
Cerro
Azul/ La
Doña
24 de
Diciembre
Future Line 2
General Properties
Expected Demand:
Structure Type:
Length:
Stations:
Maintenance Yard:
Rolling Stock:
by 2020 – 15,000 p/h/d
by 2035 – 25,000 p/h/d
Elevated viaduct
20+ kilometers of railway
17 (one major interconnection
with line 1 and several with
MetroBus)
Single facility of 10 hectares
Compatible with Line 1 &
Similar capacity
Future Line 2
Existing Conditions
Future Line 2
Site of interconnection with Line 1
Future Metro Line 3 Crossing
over the Panama Canal
4th Bridge
over the Panama Canal
Properties of Line 3
Characteristic
Description
Service Corridor
Albrook – Arraiján – Nuevo Chorrillo – Ciudad del Furturo
Length
25.85 kilometers
Stations
14 (12 in initial phase)
Railway Technology
Monorail
Demand
22,000 passenger in each way (phase 1)
Train Composition
6 wagons per train
Operating Plan
Two circuits sharing the same railway line
East Circuit: Albrook – Nuevo Chorillo ( 17.85km)
Complete Cirucit: Albrook – Ciudad del Futuro (25.85km)
Location and type of Station
Type
Characteristic
Major Interchange
(ej.: Albrook)
Large intermodal facility
Connection with Line 1 of Metro, GTNT, y Albrook Mall
Park and Ride
Parking facility connected to Metro station with taxi stand
Typical Station
With normal bus stop and taxi stand
Monorail System
Recommended for Line 3
END