Help Us Launch the PPS 250

Help Us Launch the PPS 250
Proe Power Systems is seeking accredited investors to help launch the PPS 250 Solid
Biofuel Powerplant Project while becoming significant members of our LLC. Our near
term capital infusion will be utilized to build the Proof of Concept (POC) 121/2 kWe
Powerplant.
We are ready to begin: we have the team
ready to move out. Most of the pieces
are conventional hardware available
almost “as-is” from our team partners.
When fabrication is complete we will do
formal testing at a recognized third party
test lab.
It will then be easily
transportable for demonstrations to
customers and investors to try in their
own environment.
We will then be able to raise the additional funds that we need for full production by
leveraging orders from current potential customers that are waiting to “kick the tires” on
the Proof of Concept machine.
This information does not constitute an offer to sell or a solicitation of an offer to purchase and is for informational purposes only. Offers can only be made by
authorized personnel after establishing a person's qualifications by direct personal contact and in jurisdictions where such offers can be legally made.
investments in projects such as this are a risk investment and available only to qualified buyers.
Low Cost POC Provides Customer Confidence
• Simple Construction to Demonstrate Function
• Nameplate 12.5 kWe size reduces fabrication and procurement costs from full size PPS 250
• Allows Correlation and Anchoring of Virtual Prototype
• Easily Transported for Testing and Demonstration
• Will Demonstrate firing with both Solid Biofuel and Glycerin Waste from Biodiesel
Solid Fuel Storage Bin (7.4 yd3 or ~8
to 16 Day Supply)
Glycerin Storage Tanks (160 Gallons
or ~21/2 Day Supply)
Shown with Protective Covers
Removed
121/2 kWe Proof of Concept Powerplant
Generator
Expander
Compressor
Combined Rotating Unit (1800 RPM)
Start Blower
“Chipmunk”
Combustor
Ash Removal Access
Power and
Control
Interface Box
( Switch Grass or Wood Chips)
Switch Grass or Wood Chips
@7.8% Moisture
2.4 Tons/6.4 Yards Per Week
Switch Grass or Wood Chips
@ 25% Moisture
29 pph
Switch Grass or Wood Chips @ 25% Moisture 29 pph
53.5 kWt Heat Input
Combustor
823 pph
1500F
823 pph
525F
Fuel
Hopper
Fuel Dryer
(not included)
PPS 12.5 POC Air/Fuel Flow
823 pph
525F
Air Heater
794 pph
846F Air
0.2 pph;
34 lb/0.04 Yards
per week
Ash
Expander
794 pph
1366F /46 psig Air
Compressor
794 pph
310F/46 psig Air
794 pph
68F Air
14.5 kW
Generator
15.7 kW
Legend
Wood Fuel
13.8 kWe
Electric Power
@60 hz
Air
Combustion Products
Ash
Mechanical Power
Electric Power
PPS 121/2 kWe POC Air/Fuel Flow
Lignin
@35% Moisture
2.4 Tons/3.0 Yards Per Week
( Lignin)
Fuel
Hopper
Lignin
@ 35% Moisture
28 pph
53.3 kWt Heat Input
Combustor
822 pph
1500F
822 pph
524F
822 pph
524F
Air Heater
794 pph
845F Air
0.2 pph;
34 lb/0.04 Yards
per week
Ash
Expander
794 pph
1365F /46 psig Air
Compressor
794 pph
310F/46 psig Air
794 pph
68F Air
14.5 kW
Generator
15.7 kW
Legend
Wood Fuel
13.8 kWe
Electric Power
@60 hz
Air
Combustion Products
Ash
Mechanical Power
Electric Power
PPS 121/2 kWe Air/Fuel Flow
(Crude Waste Glycerin Fueled)
Superheated
Glycerin
Fuel
52.4 kWt
Heat Input
Crude Waste Glycerin Fuel @ 454F 25 pph
819 pph 1500F
Combustor
Air Heater
1/
2
794 pph
844F Air
pph;
84 lb/0.08 Yards
per week
Ash
Crude Waste Glycerin Fuel
@ 68F
2.1 Tons/401 Gallons per Week
Expander
Fuel
PreHeater
819 pph
522F
Compressor
794 pph
1364F/45 psig Air
794 pph
310F/45 psig Air
819 pph
463F
794 pph
68F Air
14.5 kW
Generator
15.7 kW
Legend
Crude Waste Glycerin Fuel
13.8 kWe
Electric Power
@60 hz
Air
Combustion Products
Mechanical Power
Electric Power
Proe
Power
Systems
Proe Power Systems, LLC
Developing Innovative New Technologies for
Energy Independence and Environmental Responsibility
Contact:
Richard Proeschel, PE
Chairman & Program Manager
800-315-0084 x600
[email protected]
www.proepowersystems.com