Help Us Launch the PPS 250 Proe Power Systems is seeking accredited investors to help launch the PPS 250 Solid Biofuel Powerplant Project while becoming significant members of our LLC. Our near term capital infusion will be utilized to build the Proof of Concept (POC) 121/2 kWe Powerplant. We are ready to begin: we have the team ready to move out. Most of the pieces are conventional hardware available almost “as-is” from our team partners. When fabrication is complete we will do formal testing at a recognized third party test lab. It will then be easily transportable for demonstrations to customers and investors to try in their own environment. We will then be able to raise the additional funds that we need for full production by leveraging orders from current potential customers that are waiting to “kick the tires” on the Proof of Concept machine. This information does not constitute an offer to sell or a solicitation of an offer to purchase and is for informational purposes only. Offers can only be made by authorized personnel after establishing a person's qualifications by direct personal contact and in jurisdictions where such offers can be legally made. investments in projects such as this are a risk investment and available only to qualified buyers. Low Cost POC Provides Customer Confidence • Simple Construction to Demonstrate Function • Nameplate 12.5 kWe size reduces fabrication and procurement costs from full size PPS 250 • Allows Correlation and Anchoring of Virtual Prototype • Easily Transported for Testing and Demonstration • Will Demonstrate firing with both Solid Biofuel and Glycerin Waste from Biodiesel Solid Fuel Storage Bin (7.4 yd3 or ~8 to 16 Day Supply) Glycerin Storage Tanks (160 Gallons or ~21/2 Day Supply) Shown with Protective Covers Removed 121/2 kWe Proof of Concept Powerplant Generator Expander Compressor Combined Rotating Unit (1800 RPM) Start Blower “Chipmunk” Combustor Ash Removal Access Power and Control Interface Box ( Switch Grass or Wood Chips) Switch Grass or Wood Chips @7.8% Moisture 2.4 Tons/6.4 Yards Per Week Switch Grass or Wood Chips @ 25% Moisture 29 pph Switch Grass or Wood Chips @ 25% Moisture 29 pph 53.5 kWt Heat Input Combustor 823 pph 1500F 823 pph 525F Fuel Hopper Fuel Dryer (not included) PPS 12.5 POC Air/Fuel Flow 823 pph 525F Air Heater 794 pph 846F Air 0.2 pph; 34 lb/0.04 Yards per week Ash Expander 794 pph 1366F /46 psig Air Compressor 794 pph 310F/46 psig Air 794 pph 68F Air 14.5 kW Generator 15.7 kW Legend Wood Fuel 13.8 kWe Electric Power @60 hz Air Combustion Products Ash Mechanical Power Electric Power PPS 121/2 kWe POC Air/Fuel Flow Lignin @35% Moisture 2.4 Tons/3.0 Yards Per Week ( Lignin) Fuel Hopper Lignin @ 35% Moisture 28 pph 53.3 kWt Heat Input Combustor 822 pph 1500F 822 pph 524F 822 pph 524F Air Heater 794 pph 845F Air 0.2 pph; 34 lb/0.04 Yards per week Ash Expander 794 pph 1365F /46 psig Air Compressor 794 pph 310F/46 psig Air 794 pph 68F Air 14.5 kW Generator 15.7 kW Legend Wood Fuel 13.8 kWe Electric Power @60 hz Air Combustion Products Ash Mechanical Power Electric Power PPS 121/2 kWe Air/Fuel Flow (Crude Waste Glycerin Fueled) Superheated Glycerin Fuel 52.4 kWt Heat Input Crude Waste Glycerin Fuel @ 454F 25 pph 819 pph 1500F Combustor Air Heater 1/ 2 794 pph 844F Air pph; 84 lb/0.08 Yards per week Ash Crude Waste Glycerin Fuel @ 68F 2.1 Tons/401 Gallons per Week Expander Fuel PreHeater 819 pph 522F Compressor 794 pph 1364F/45 psig Air 794 pph 310F/45 psig Air 819 pph 463F 794 pph 68F Air 14.5 kW Generator 15.7 kW Legend Crude Waste Glycerin Fuel 13.8 kWe Electric Power @60 hz Air Combustion Products Mechanical Power Electric Power Proe Power Systems Proe Power Systems, LLC Developing Innovative New Technologies for Energy Independence and Environmental Responsibility Contact: Richard Proeschel, PE Chairman & Program Manager 800-315-0084 x600 [email protected] www.proepowersystems.com
© Copyright 2024 ExpyDoc