OIIAWMIP - Deptt. of Water Resources, Odisha

Orissa Integrated Irrigated Agriculture
And Water Management Investment Programme
(OIIAWMIP)
PROJECT MANAGEMENT UNIT
As on 30th September 2014
ORGANISATION :
PROJECT MANAGEMENT UNIT
UNDER
DEPTT. OF WATER RESOURCES, Odisha
ADB LOAN ASSISTANCE ON
MULTI – TRANCHE FINANCING FACILITY (MFF)
ASSOCIATED WITH OFID LOAN
(OPEC FUND FOR INTERNATIONAL DEVELOPMENT)
OPEC – ORGANISATION OF PETROLEUM EXPORTING COUNTRIES
Orissa Integrated Irrigated Agriculture and Water
Management Investment Programme (OIIAWMIP) is being
implemented in the State under assistance of ADB.
The Loan Agreement for Tranche-I has been signed on 25th
February 2009, effective from 04.06.2009 and the original
lone closing date was 30th September 2013.The lone closing
date of Tranche-I has been extended up to 31st March 2015.
(Between Govt. of India & ADB
AND
Project Agreement Between ADB & Govt. of Orissa)
ADB LOAN No.
: 2444 IND
OFID LOAN No.
: 1251 P
PROCESSING HISTORY OF MULTI-TRANCHE FINANCING FACILITY.(MFF)
Concept clearance
:
Fact Finding
:
10 - 28 Sept 2007
Management Review meeting
:
21 Nov 2007
Appraisal Mission
:
5 - 21 Dec 2007
Staff review meeting
:
18 March 2008
Loan Negotiations
:
7 - 8 Aug 2008
FFA signing
:
8 Aug 2008
Board circulation of MFF
:
28 Aug 2008
Board Consideration & approval of MFF :
18 Sept 2008
Last Periodic Financing Request submission:
31 March 2015
Estimated Investment Programme completion Date:
31 March 2017
Period of Utilization
30 Sept 2017
:
7 Sept 2007
FIRST PERIODIC FINANCING REQUEST (PFR) – PROJECT - I
Submission of First PFR
:
8 August 2008
Approval of First PFR
:
26 Sept 2008
Signing of Loan & Project Agreement on 1st PFR:
25 Feb 2009
Loan effectiveness of First PFR
:
4 June 2009
Original Loan closing date on first PFR
:
30 Sept 2013
Revised Loan closing date on first PFR
:
31 March 2015
Ref : Loan No. 2444- IND
AIMS & OBJECTIVES :
To enhance productivity, water user efficiency and
sustainability of existing major and medium irrigation
systems, revival of lift irrigation systems, creek and drainage
systems by realising full development of potential irrigation
infrastructures.
To set-up sustainable participatory irrigation management
systems.
To improve the livelihood of the poors.
To provide agriculture & related support services to water
users.
To build capacity of Pani panchayats for progressive transfer
of operation and maintenance (O&M).
Tranche-wise cost, duration and ADB & OFID Loan shares:
ADB Share
OFID Share
State Share
Beneficiary
Contribution
Total
Tranche-I
FY 2009 -15
US$ 16.5 M
(Rs. 66.83 Cr)
US$ 30.0 M
(Rs.121.50Cr.)
US$ 18.1 M
(Rs73.31Cr.)
US$ 1.8 M
(Rs.7.29 Cr.)
US$ 66.4 M
(Rs.268.92 Cr.)
Tranche-II
FY 2012-14
US$ 62.7 M
(Rs.253.94 Cr)
-
US$ 24.13 M
(Rs.97.72Cr.)
US$ 2.57 M
(Rs.10.41Cr.)
US$ 89.4 M
(Rs.362.07 Cr.)
US$ 57.8 M
(Rs. 234.10 Cr)
-
US$ 22.27 M
(Rs.90.19Cr.)
US$ 2.43 M
(Rs.9.84Cr.)
US$ 82.5 M
(Rs.334.13 Cr.)
US$ 20.5 M
(Rs. 83.01 Cr.)
-
US$ 7.93 M
(Rs.32.11Cr.)
US$ 0.97 M
(Rs.3.95Cr.)
US$ 29.4 M
(Rs.119.07 Cr.)
US$ 157.5 M
Rs.637.88 Cr)
US$ 30.0 M
(Rs.121.50Cr.)
US$ 73 M
(Rs.295.65Cr.)
US$ 7.2 M
(Rs.29.16Cr.)
US$ 267.7 M
(Rs.1084.19 Cr.)
Tranche-III
FY 2014-16
Tranche-IV
FY 2016-17
Total
Note : 1 US $ = Rs. 40.50 (in September 2007 prices)
Sharing of Funds
Total = $ 267. 7 million (Rs. 1084.19 Cr.)
1 $ = Rs. 40.50 (in Sept. 2007 price level used by PPTA for preparation of cost estimate of OIIAWMIP)
ADB loan will have a term of 25 years, including a grace period of 7 years with interest rate according to
ADB’s LIBOR (London Inter-bank Offered Rate) – based lending facility and a commitment charge of
0.15 % per annum. Interest on the loan shall be payable semiannually on 1st March and 1st September
in each year starting from 01.03.2016 up to 01.09.2033 (36 installments)
The OFID loan will be administrated by ADB and cover infrastructure and associated equipment cost of
Tranche – I and have a term of 20 years, including a grace period of 5 yrs with fixed interest rate of
2.75 % per annum including service charges of 1.0 % per annum.
Proposed Projects (Name)
Tranche
Tr. I
(FY 2009 – 13)
Name of the Project
Remarks
Major – 1 No. (Taladanda)
Medium – 3 Nos. (Gohira, Remal & Sunei)
Minor Lift – 650 Nos. in districts Angul, Dhenkanal & Jajpur. Later
on 3 districts viz. Mayurbhanj, Balasore, and Bhadrak have been
included for the Batch-3 of MLIP scheme.
Tr. II
(FY 2012 – 14)
Due to Start up
Major – 5 Nos.
(Machhagaon, Pattamundai & Jajpur Canals, HLC Range -I), in
implementation
Mahanadi Delta & MCIIP (Extension 5930 Ha).
Delays in PFR-I,
ADB has suggested
Medium – 3 Nos.
(Kansabahal & Ramial in Brahmani Basin, Kanjhari in Baitarani Basin)
the remaining 3
tranches will be
compressed to
Tr. III
Medium – 3 Nos. Bankbahal, Khadakai, Nesa in Subarnarekha Basin
single tranche
Minor Lift – 500 Nos. (name of districts to be adopted subsequently)
(in tranche-II)
Creek Irrigation : i) Bada Mahara ii) Pada Mahara Bhadrak District
iii) Samudrapasa & iv) Natiajore. ( Baitarani Basin)
ADB Mission is yet
(FY 2014 – 16)
to finalize name of
the sub-projects
Scheme Refinement & WUA Strengthening:i.) Sapua Badajor – Dhenkanal (Brahmani Basin)
ii) Jambhira
- Mayurbhanj (Budhabalanga Basin)
iii) Haladia
- Mayurbhanj (Budhabalanga Basin)
observing the
preparedness for
Trance-II. Project
of Tr-II, Tr-III have
Tr. IV
(FY 2016 – 17)
to be finalised by
Minor Lift – 250 Nos. (name of districts to be adopted subsequently)
ADB.
Ayacut Area in Ha.
Sl.
No.
Tranche
Major
Medium
Minor
Lift
Creek
Irrigation
Scheme
Refinement &
WUA
Strengthening
Total
1
Tranche-I
32680
22400
13900
--
--
68980
2
Tranche-II
98960
23510
--
--
--
122470
3
Tranche-III
16500
10700
2869
8289
38358
4
Tranche-IV
--
--
5400
--
--
5400
TOTAL
131,640
62,410
30,000
2,869
8,289
235208
*Area will be revised on signing of Agreement for Tranche-II.
Implementation Arrangements
Principal Secretary, DOWR
Director, CAD-PIM Directorate
EIC (WR)
Basin
Managers
CE-cum-PD,
PMU
PMU Staffs
(SE / E.E)
• Asst. Engr.
• Junior Engr.
Addl. Dir., PP
Support (PP
Cell)
Addl. Director
CADA (CAD
Cell)
ISPMC/MLIPC
•(Tcchnical & O &M Cell)
• Subproject Manager
Addl. Dir. O&M
(Technical & O&M
Cell)
•(PP Cell)
•(CAD Cell)
•Dy. SIO Manager
•E.E CAD
• Asst Engrs.
• Junior Engrs.
SIO
• NGO Support
Services
TRANCHE – I
SUB-PROJECTS ;
MAJOR-1 No. (32680 Ha.)
TALADANDA CANAL SYSTEM
MEDIUM- 3 Nos. (22400 Ha.)
GOHIRA, REMAL, SUNEI
MINOR LIFT – 650 Nos. (13900 Ha.)
PHASE – I -201 nos IN 3 DISTRICTS i.e( ANGUL,DHENKANAL&JAJPUR)
PHASE-II-200 nos IN 1 DISTRICT i.e (JAJPUR)
PHASE-III-249 nos. in 3 districts
i.e (BHADRAK, MAYURBHANJ & BALASORE )
Tranche – I Sub-Projects under OIIAWMIP
Total Cost :$ 66. 4 million (Rs.268.92 Crore-As Sept.2007price level)
Period : 2009 – 2013
Sl.
No.
Name of the Sub-Project
Irrigated Area
(in Ha.)
1.
Taladanda Canal Major Irrigation Project
(with strengthening of Panipanchayats)
32680
2.
Sunei Medium Irrigation Project
(with strengthening of Panipanchayats)
10000
3.
Remal Medium Irrigation Project
(with strengthening of Panipanchayats)
4300
4.
Gohira Medium Irrigation Project
(with strengthening of Panipanchayats)
8100
5.
Minor Lift Irrigation Projects (650 Nos.)
13900
Total
68980
Status of Procurement under OIIAWMIP –Tranche-I (Period: 2009-2013)
Civil Works (Major & Medium Irrigation Sub-Projects)
Amount in Cr. Rupees
Sl. No.
1
Name of the Project
2
A. Main Canal & Distributary system
1
Taladanda Major Irrigation Sub-Project
Total No. of Packages
Packages Awarded
Remarks
Nos.
Est. Cost
Nos.
Cost
3
4
5
6
12
6
53.27
6
61.88
-
2
Sunei Medium Irr. Sub-Project
1
10.96
1
10.79
3
Gohira Medium Irrigation Sub-Project
6
17.97
6
20.62
4
Remal Medium Irrgation Sub-Project
1
9.59
1
9.63
-
14
91.79
14
102.92
-
S-Total (Main Canal)
B. Minor Canal System
1
Taladanda Major Irrigation Sub-Project
3
14.80
3
18.560
2
Sunei Medium Irr. Sub-Project
3
7.90
3
8.330
-
3
Gohira Medium Irrigation Sub-Project
1
2.44
1
2.750
-
4
Remal Medium Irrgation Sub-Project
1
2.39
1
2.850
-
S-Total (Minor Canal)
8
27.52
8
32.49
-
22
119.31
22
135.41
-
Total
Progress of civil work Packages up to end of September 2014
TALADANDA Total (9)
Taladanda : T4C
Taladanda : T4B
Taladanda : T4A
Taladanda : T3C
Taladanda : T3B
Taladanda : T3A
Taladanda : T2
Taladanda : T1B
Taladanda : T1A
77%
56%
73%
58%
79%
82%
82%
56%
100%
100%
GOHIRA Total (7)
Gohira : G3
Gohira : G2R2B
Gohira : G2R2A
Gohira : G2R1
Gohira : G1R2B
Gohira : G1R2A
Gohira : G1R1
90%
84%
82%
100%
100%
91%
79%
100%
REMAL Total (2)
Remal : R2
Remal : R1
81%
77%
82%
SUNEI Total (4)
Sunei : S2C
Sunei : S2B
Sunei : S2A
Sunei : S1
100%
100%
100%
100%
100%
Overall Program (22)
83%
0%
20%
40%
60%
80%
100%
120%
SUBMINOR CANAL WORKS
ERM
works
Taladanda,
of
sub-minor
Remal,
Sunei
canals
and
of
Gohira
subprojects are being executed through
Panipanchayats.
TALADANDA CAD WORKS
CAD works in Taladanda Sub-Project are also being
executed under ADB Assistance. The progress up to
September 2014 is 15071 Ha. out of the total proposed
renovation of 17273 Ha.
Strengthening of Panipanchyats
PP empowerment and PP- driven irrigated agriculture development are central
elements of the Project, complementing irrigation infrastructure.
The number of Panipanchayats in different projects under OIIAWMIP Tr-I is as
follows.
Taladanda
-
73 PPs
Sunei
-
20 PPs
Gohira
-
19 PPs
Remal
-
09 PPs
Total
-
121PPs
NGOs have been engaged at project level for Strengthening of Panipanchyat under
the Supervision of Additional Director PPSU. Micro planning works are under
progress.
Experts Like Social Vulnerable Group, Agriculture Ext. & Agribusiness, Institutional
Capacity Development Expert, are working under PPSU for necessary support.
STATUS OF PP MICRO PLAN
Sl
No
1
Sub Project
Name
Taladanda
Total No.
of PP
73
Name of NGO /
Institution
No of PP
Allotted
PP Micro Plan
completed
WALMI
21
21
IRDMS-I
26
23
IRDMS-II
26
20
2
Sunei
20
ADI
20
20
3
Remal
09
KASS
09
09
4
Gohira
19
PRADAN
19
19
121
112
121
Total
Proposed Implementation Schedule of Minor Lift
Irrigation Sub-Projects
Project Year
Number of SubSub-projects
to be taken up
Cumulative
Number of SubSubprojects
1st
2nd
3rd
4th
5th
6th
7th
8th
100
100
200
250
100
200
400
650
250
250
250
900
1150
1400
Total
1,400
Implemented
Tranche
1ST (2009
2009--2014)
3RD (2 years)
4TH (2 years)
Note : However, there is a proposal for 750 MLIPs to
be taken up under Tranche-2 of OIIAWMIP
Status of Revival / Improvement of
Minor Lift Irrigation Sub-projects under OIIAWMIP Tranche-I:
1) Phase 1
No. of MLIPs completed in 1st phase
-
201 (Jajpur- 80, Angul- 63 &
Dhenkanal- 58)
Area revived
-
4100 Ha.
Pani Panchayat election for MLIPs of Phase-I completed
-
201
2) Phase 2
No. of MLIPs taken up
Area to be revived
-
200 (Jajpur)
4400 Ha.
Work order has been issued to PPs for laying
of PVC Pipe and Distribution Tank etc.
-
200
Laying of PVC Pipe etc. completed
-
183
3) Phase 3
-
249
Area to be revived
-
5400 Ha.
Status
-
201 nos of Final Appraisal Reports
(Mayurbhanj-49, Balasore-100
Bhadrak-100)
approved .Procurement process
has been initiated.
Consultancy Services for Institutional & Panipanchyat Strengthening :
Institutional Strengthening & Project Management Consultants(ISPMC) : Contract has been
signed on 20th August 2009 and Consultant mobilized on 22.08.2009. (to continue till 2017).
Minor Lift Irrigation Projects Consultants (MLIPC): Contract for implementation of 401 MLI subprojects signed on 17th Nov. 2009 and Consultant mobilized on 25th Nov. 2009. Contract period over
on 31.07.2012.
Contract for (MLIPC) for implementation of 249 MLI sub-projects in Phase-3 of Tranche-I signed on
14.02.2014 & Consultant mobilized on 01.03.2014.
Taladanda NGO:
i)
MOU with WALMI signed on 09.11.2010 for Rs. 0.93Cr. for 3 years and Consultant mobilized on
22.12.2010. The Agreement completed on 30th Sept. 2013. Contract for further extension up to 31st
December 2014 signed on 14.05.2014.
ii) Contract with NGO, IRDMS signed on 09.12.2011 for Rs.0.46Cr. for 1 year and Consultant mobilized
on 12.12.2011. The agreement period completed on 8.12.12 & further extended up to 30th Sep. 2013.
iii) Contract with NGO, IRDMS for another batch signed on 03.12.2012 for a period of 1 Year and
Consultant mobilized on 03.12.2012.
iv) Contract with NGO, IRDMS signed for the extended period up to 31 December 2014 on 30.06.2014.
Gohira NGO : Contract signed on 17th November 2009 and Consultant mobilized on 1st December 2009.
The NGO, PRADAN has withdrawn from the contract from 30th Nov. 2011. Action initiated for recruitment
of COs through PPSU/SIO.
Remal NGO: After withdrawal of NGO, READ Foundation contract with new NGO, KASS has been signed
on 09.12.2011 and Consultant mobilized on 12.12.2011.The agreement period completed on 8.12.12 &
further extended up to 30th September 2013. Contract for further extension up to 31st December 2014
signed on 06.02.2014.
Sunei NGO : After withdrawal of NGO, READ Foundation contract with new NGO, ADI has been signed on
09.12.2011 and Consultant mobilized on 12.12.2011.The agreement period completed on 8.12.12 & further
extended up to 30th September 2013. Contract for further extension up to 31st December 2014 signed on
21.02.2014.
EXPENDITURE, CLAIM SUBMISSION, DISBURSEMENT & ACA RELEASE UNDER OIIAWMIP (TRANCHE - 1)
(As on 30 September 2014)
Sl Financial Budget
No. Year provision
(Rs. In
Lakh)
Expenditure
(Rs. In Lakh)
(Upto September 2014)
Expr. On Expr. On Total
works salary Expr.
Disbursement
(In US $)
Corresponding
Claim submission
(Rs. In Lakh)
Disbursement
(Rs. In Lakh)
ACA Release
( Rs. In Lakh)
ADB
OFID
TOTAL
ADB
OFID
TOTAL
ADB
OFID
TOTAL
ADB
OFID
TOTAL
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
Nil
1 2008-09
4500.00
679.46
83.04
762.50
2 2009-10
5787.00
1071.53
286.89
1358.42 401.97
Nil
401.97
507833.00
0.00
507833.00
233.48
Nil
233.48
235.39
0.00
235.39
3 2010-11
4250.00
2962.71
429.20
3391.91 977.03
548.11
1525.14
2162521.29
216300.32
2378821.61
984.71
95.41
1080.12
942.32
95.41
1037.73
4 2011-12
8662.00
4657.99
485.78
5143.77 1710.18 1685.33
3395.51
3450145.17
3313982.60
6764127.77
1661.69
1552.89
3214.58
1701.97 1552.89 3254.86
5 2012-13
15000.00
7284.20
536.78
7820.98 1823.57 2620.61
4444.18
3181646.39
3817227.12
6998873.51
1733.48
2081.78
3815.26
1733.50 2081.78 3815.28
6 2013-14
10400.00
6462.78
604.58
7067.36 1938.57 3766.26
5704.84
2840659.23
1385171.00
4225830.23
1737.22
793.33
2530.55
1693.27 793.34 2486.61
7 2014-15
23474.00
2363.19
309.36
2672.55 487.86
1922.83
395938.95
7293284.02
7689222.97
241.25
4438.19
4679.44
285.20 4438.20 4723.40
Grand Total
1434.97
25481.85 2735.63 28217.49 7339.18 10055.28 17394.46 12538744.03 16025965.06 28564709.09 6591.83
8961.60 15553.43 6591.65 8961.62 15553.27
TRANCHE –II SUB-PROJECTS
UNDER
OIIAWMIP
PROPOSED SUB-PROJECTS
UNDER TRANCHE –II OF OIIAWMIP
Sl. No.
Name of the Sub-Project
DPR Cost
(in Cr. Rs.)
CCA
(in Ha.)
1.
Machhagaon Canal (Major Irrigation)
89.58
34870
2.
Pattamundai Canal (Major Irrigation)
122.09
32693
3.
HLC Range-I (Major Irrigation)
50.44
14000
4.
Kansabahal (Medium Irrigation)
20.48
4730
5.
Ramial (Medium Irrigation)
21.33
6128
6.
Kanjhari (Medium Irrigation)
20.49
9740
7.
MCII (Ex- Tranche-I) (Major Irrigation)
76.44
6000
8.
Others like MLIP & Associated
Infrastructure Development.
88.97
There is also a proposal for taking up restoration works of some saline embankments
under this tranche.
Under Tranche-II of OIIAWMIP, ERM works of Machhagaon Canal,
Pattamundai Canal, HLC Range-I, Kansabahal, Ramiala, and
Kanjhari Sub-Projects, extension works of MCII sub-project,
renovation / improvisation of 750 MLIPs and restoration works of
saline / river embankments are being proposed to be taken up
during 2014-2017. The ERM work of Jajpur canal system is being
proposed to be dropped from OIIAWMI Programme. There is also
a proposal for taking up restoration works of some saline
embankments under this tranche. Required Survey, Design &
Drawing (SDD) works for civil works had already been started.
Tender for 3 packages of Machhagaon
Canal, 4 packages of
Pattamundai Canal & 1 package of Ramiala sub-project have been
invited. The Loan Agreement for Tranche-2 of OIIAWMIP is likely
to be signed during 2014.
STATUS OF PROCUREMENT UNDER OIIAWMIP –TRANCHE-II (PERIOD: 2014-2017)
CIVIL WORKS (MAJOR, MEDIUM IRRIGATION WORKS)
Status of Procurement under OIIAWMIP –Tranche-II (Period: 2014-2017)
Civil Works (Major, Medium Irrigation Works)
Sl.
No.
Name of the Project
Canal system
Canal system
Main Disty. Minor Total Main Disty. Minor Total
1
2
3
4
Amount in Million Rupees
Remarks
(As of 30.9.2014)
Packages invited
Total No. of Packages
Est. Cost Bid value
put to
tender
5
6
7
8
9
10
11
12
Pkgs.
13
21
A. Main, Distributary & Minor canals
1
Machhagaon Canal Irr.
Sub-Project
3
3
2
8
3
-
-
3
248.00
245.23
MAC-01, MAC02, MAC-03
2
Pattamundai Canal Irr.
Sub-Project
4
3
2
9
4
-
-
4
701.30
694.37
PAT-01,PAT-02, Bids opened on 6.5.2014. No bids received in
PAT-03, PAT-04 package no. PAT-03. Package no. PAT-01,PAT02 are found to be technically non-responsive.
Package no. Pat-04 is found to be technically
responsive.
3
Ramial Medium Irr. Subproject
0
2
1
3
-
1
-
1
110.50
109.40
CW-NCB-RML-01 Bid invited on 5.6.2014. Pre-bid meeting held
on 25.6.2014. Bids opened on 25.07.2014 &
Technical bids are under evaluation.
4
Kanjhari Medium Irr. Subproject
0
2
1
3
-
-
-
0
Estimate for Package 1 sanctioned. Estimate
for Package 2 is under scrutiny.
5
Kansbahal Medium Irr.
Sub-project
0
1
1
2
-
-
-
0
Survey works are under progress through
Consultancy services.
6
MCII Sub-project
2
0
2
4
-
-
-
0
S/I works for design of structures is under
progress and Estimates are under
preparation.
7
HLC Range-1 Sub-project
1
1
1
3
-
-
-
0
S/I works through Consultancy services is
under progress. Design of structures is under
progress.
12
10
32
7
1
0
8
S-Total (Main Canal) 10
1059.80 1049.00
Bids opened on 6.5.2014, Technical Evaluation
complected. All 3 packages are found to be
technically non-responsive.
16.04.2012 Before Renovation
T-2: Fall cum VRB cum CR at RD 24.460 Km of
TMC (Sompur Lock)
02.07.2012 : After Renovation
T-2 : Fall cum VRB cum CR at RD 24.460 Km of
TMC (Sompur Lock)
27.04.2013 After Renovation
T-3A : HR of Disty. No.12 at RD 48.990 Km of TMC
10.05.2012 :Before Renovation
T-3A : HR of Disty. No.12 at RD 48.990 Km of TMC
Before Execution (H.P. VRB AT RD.
1920m. Of Kirikichia Minor SUN-2C
VRB U/S at RD 30m New canal Lining
Arbandha Minor of SUN-2C.
After Execution (H.P. VRB AT RD.
1920m. Of Kirikichia Minor SUN-2C
VRB D/S at RD 30m New canal Lining Arbandha
Minor of SUN-2C.
Fall at RD 1570m of Khuntapal Minor (Before
Construction) SUN-2B
Fall at RD 90m of Badabadi Minor (Before
Construction) SUN-2B
Fall at RD 1570m of Khuntapal Minor (After
Construction) SUN-2B
Fall at RD 90m of Badabadi Minor
(After Construction) SUN-2B
New G.Wall from RD.1335m to 1355m (During
execution) of Mauda Minor SUN-2B
Fall at RD. 2100m (Before)
of Mauda Minor SUN-2B
New G.Wall from RD.1335m to 1355m (After
execution) of Mauda Minor SUN-2B
Fall at RD. 2100m (After) of
Mauda Minor SUN-2B