NOTES 1-ALL DIMENSIONS ARE IN mm. UNLESS OTHERWISE STATED. 2-THE SPECIFIED PROTECTIVE COATING OF BURIED PIPELINES IS TO BE CONTINUOUS AT ROAD CROSSING. EXTENT OF COATING 5000 MIN. HIGHWAY C L OF HIGHWAY 4000 MIN. SPECIFIED MIN. BEND RADIUS (SEE NOTE "5") SPECIFIED MIN. BEND RADIUS (SEE NOTE "5") 600 MIN. START OF BEND START OF BEND 2000 PIPE SUPPORT MIN. COVER (SEE NOTE"5") COLD FIELD BEND SPECIFIED MIN. BEND RADIUS (SEE NOTE "5") A 8-CARRIER PIPE TO BE CONTINUED WITHOUT VERTICAL OR SIDE BENDS IN PROPERTY LIMIT OR MINIMUM DISTANCE OF 5000mm. 10-BLINDING CONCRETE TO BE CLASS 1:4:8. 11-ALL REINFORCEMENT TO BE MILD STEEL. 12-ALL REINFORCEMENT TO HAVE 40 COVER. BURIED PIPELINES SPECIFIED MIN. BEND RADIUS (SEE NOTE "5") 13-DISTRIBUTION BARS FOR ALL CASES TO BE Ø 10 AT 250 c/c. 14-SAFETY BARRIER TO BE FABRICATED FROM 8"(DN200) PIPE (OR OTHER AVAILABLE MATERIAL) AND SET IN CONCRETE. BARRIER TO BE PAINTED BLACK AND WHITE AS SHOWN. BARRIER TO BE LOCATED IN ACCORDANCE WITH INSTRUCTIONS OF THE ENGINEER. B 500 350 PIPE OUTSIDE DIAMETER mk.b (NOTE "15") Ø10 AT 250 c/c C 2000 500 MIN. 4000 100 (TYP.) 100 BLINDING CONCRETE C SECTION A-A CULVERT DETAILS 4000 4000 = = THIS DWG. SUPERSEDES DWG. No.S4L-6502 SECTION B-B 1000 C COMPACTED SELECT FILL MATERIAL mk.c B WARNING SLAB BURIED PIPELINES 100 1" C.S. PIPE C+20 mk.a MKd 500 MIN. COLD FIELD BEND Ø10 E 150 c/c 150MIN. MIN. COVER (SEE NOTE "5") SPECIFIED MIN. BEND RADIUS (SEE NOTE "5") Ø16 CONCRETE COVER mk.d MKc ROAD SURFACE 1500 150 B mk.a MKb EXTENT OF ROAD SURFACE 500 A C+20 3000 500 MIN. PIPE SUPPORT ABOVE GROUND PIPELINES 350 5000MIN. (NOTE "8") START OF BEND START OF BEND START OF BEND 500 MIN. 500 MIN. 500 MIN. 2000 WARNING SLAB 150 MKa GROUND LEVEL SPECIFIED MIN. BEND RADIUS (SEE NOTE "5") 100 7-BACKFILL OVER PIPE SHALL BE PLACED IN 150 LAYERS AND PNEUMATICALLY TAMPED TO REACH THE DENSITY OF UNDISTURBED SURROUNDING AND SURFACE MATERIAL SHALL BE RESTORED TO THE SATISFACATION OF THE ENGINEER. C L OF SECONDARY ROAD MIN. SPECIFIED MIN. BEND RADIUS (SEE NOTE "5") 6-ABOVE GROUND PIPELINES TO BE COATED WITH CLASS A OR B (REF. IPS-C-TP-274) PROTECTIVE COATING FOR THE COMPLETE LENGTH OF THE CROSSING. THE COATING SHALL EXTENT FOR AT LEAST 4 METERS FROM WHERE THE PIPELINE IS COMPLETELY CLEAR OF THE GROUND. 15-THE SHAPES OF REFERED MK ARE AS FOLLOWS: GROUND LEVEL 150 A A 4000 5000MIN. (NOTE "8") SAFETY BARRIER SEE DETAIL "B" ROAD SURFACE B 5-THE MINIMUM BEND RADIUS AND THE MINIMUM COVER ARE SPECIFIED ON THE PROJECT DRAWINGS. PIPELINE SIZE NPS DN A B C UP TO 12" UP TO 300 1100 700 200 16" TO 20" 400 TO 500 1310 910 200 24" TO 26" 600 TO 650 30" 1460 1060 200 750 1670 1170 250 36" 900 1820 1320 250 42" 1050 2070 1470 300 48" 1200 2220 1620 300 1300 2020 1720 300 52" 56" 1400 2120 1820 300 60" 1500 1730 1930 300 REINFORCEMENT Ø12 AT 250c/c MKa Ø12 AT 250c/c MKb Ø12 AT 250c/c MKc 4Ø16 STAG. MKd GROUND LEVEL 500 SURFACE C 4-ALL ROAD CROSSINGS SHOWN ON THIS DRAWING WILL BE CONSTRUCTED BY CUT-AND-FILL METHOD. WHERE THIS METHOD IS UNACCEPTABLE TO THE ROAD AUTHORITIES, THE CROSSING MAY BE LAID IN THRUST BORED CASING AS DETAILED IN SHEET 2. SURFACE AND HARD SHOULDER HIGHWAY (SEE NOTE "6") START OF BEND 5000 EXTENT OF ROAD 250MIN. (NOTE "8") EXTENT OF HIGHWAY EXTENT OF COATING C L OF SECONDARY ROAD Ø16 5000 9-CONCRETE TO BE OF 1:2:4 MIX WITH MINIMUM CUBE OF 210 kg/cm3 CRUSHING STRENGTH AT 28 DAYS. SPECIFIED MIN. BEND RADIUS (SEE NOTE "5") ABOVE GROUND PIPELINES 100 5000 MIN. GROUND LEVEL GROUND LEVEL A 3-DOUBLE COAT AND DOUBLE WRAP SHALL BE APPLIED AT ALL ABOVE GROUND/BURIDE PIPELINES ROAD CROSSING. 2000 (NOTE "8") SAFETY BARRIER SEE DETAIL "B" 600 MIN. SURFACE AND HARD SHOULDER START OF BEND 5000 EXTENT OF HIGHWAY (SEE NOTE "6") START OF BEND C L OF HIGHWAY 500 SLAB PIPELINE Ø16 AT 250c/c MKa Ø12 AT 250c/c MKb Ø12 AT 220c/c MKc 4Ø20 STAG. MKd Ø18 AT 200c/c MKa Ø16 AT 200c/c MKb Ø16 AT 200c/c MKc 4Ø20 STAG. MKd Ø18 AT 200c/c MKa Ø16 AT 200c/c MKb Ø16 AT 200c/c MKc 4Ø20 STAG. MKd (SEE NOTE "14") C B A REV. DESCRIPTION IRANIAN PETROLEUM STANDARDS DATE NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION PIPELINE ROAD CROSSING DETAIL "B" MAJOR & SECONDARY ROAD CROSSING TYPICAL SAFETY BARRIER DATE DRAWING No. IPS-D-PI-175 SHEET 1 2 REV. NOTES HARD DITCH SHOULD ER T ROAD C L ASPHAL CASING EXCAVATION (SEE NOTE "5") CONNECTED AT HIGH END OF CASING COMBINED POTENTIAL SLOPE 1:20 450 SQ.x500 DEEP CONCRETE BLOCK GROUND LEVEL BANDS & CLAMPS B MIN. COVER 900MIN. 600 1x10mm 2 PVC INSULATED COPPER CABLE A INSULATORS EQUALLY SPACED MAXIMUM SPACE TO BE 3000 CENTREING CRADLE SEE DETAIL "B" CENTREING CRADLE NOTE "11" "S" SEAL FIXED WITH STAINLESS STEEL BANDS & CLAMPS 500 START OF BEND 180° 500 START OF BEND 180° MARKER PLATE 300 1200MIN. 600 SLOPE 1:20 50 50 SLOPE 1:20 GROUND LEVEL GROUND LEVEL 6mm. THK. M.S. SUPPORT TO BE WELDED ALL ROUND CASING & THE VENT PIPE CASING PIPE 30° FULL PENETRATION WELD 600 SECTION B-B 8" 10" 12" 14" 2 150 90° BEND 120 MAX. SPACE TO BE 3000 (SEE TABLE) CARRER PIPE SEE DETAIL "A" SECTION A-A 4" 6" SEE DETAIL "A" 350 CASING PIPE NPS WARNING SLAB INSULATORS EQUAL SPACED CARRIER PIPE CARRIER PIPE C OF VENT L 450 SQ.x500 DEEP CONCRETE BLOCK 1000 1000 MARKER PLATE 450 SQ.x500 DEEP CONCRETE BLOCK 500 SLOPE DOWN MIN. 1:100 600 "S" SEAL FIXED WITH STAINLESS STEEL CONC. BASE 2000 WARNING SLAB CASING NOTE "11" 1500 2000 AT LOW END OF CASING 2000MIN. 500 MIN. COVER (SEE NOTE 13) VENT PIPE BOTTOM CONNECTED 14-CASING PIPE SHALL BE CARBON STEEL API 5LX-52. TEST POINT & MARKER DITCH WARNING SLAB 13-THE MIN COVER ARE SPECIFIED ON THE PROJECT DRAWINGS. 500 VENT PIPE TOP 11- CARRIER PIPE TO BE CONTINUED WITHOUT VERTICAL OR SIDE BENDS IN PROPERTY LIMIT OR FOR MINIMUM DISTANCE OF 5000. 12-BLOCK VALVES SHALL BE INSTALLED AT EACH SIDE OF ROAD CROSSING WHERE SPECIFIED IN ROUTE AND PROFILE DRAWINGS. 1500 EDGE OF ROAD C L OF ROAD EDGE OF ROAD 6500MIN. UNLESS SITE CONDITION DOES ALLOW 10- PROPERTY LIMIT FOR DIFFERENT ROAD CROSSING IS ANNOUNCED BY ENGINEER ACCORDING TO REGULATIONS OF MINISTRY OF ROAD AND TRANSPORTATION. GAUZE INSECT SCREEN FITTED INSIDE PIPE 300MIN. 1000 SLOPE 1:20 50 GROUND LEVEL 9- BACKFILL OVER CASING SHALL BE PLACED IN 150 LAYERS AND PNEUMATICALLY TAMPED TO REACH THE DENSITY OF UNDISTURBED SURROUNDINGS AND SURFACE MATERIAL SHALL BE RESTORED TO THE SATISFACTION OF THE ENGINEER. 50 1000 1500 TOE OF EMBANKMENT 500 B R.O.W. LIMIT A 7- CASING SHALL BE THOROUGHLY CHECKED TO ENSURE THAT NO OUT-OF-ROUNDNESS OR DENTS ARE EXISTING, HOLES IN CASING PIPE FOR VENTS SHOULD BE PREPARED AND VENTS WELDED IN BEFORE INSERTION OF CARRIER PIPE. 8- EXPOSED PIPES SHALL BE PAINTED IN ACCORDANCE WITH N.I.O.C. SPECIFICATION. 180° BEND PROPERTY LIMIT 6500MIN. MARKER PLATE DETAIL "B" LENGTH OF CASING IS SPECIFIED ON RELATED DRAWING TOE OF EMBANKMENT FITTED INSIDE PIPE 6- THE CASING SHALL BE SUPPORTED FOR ITS ENTIRE LENGTH AND SHALL BE LAID SO AS TO SLOPE SLIGHTLY. ON ALL ROAD CROSSING CASED OR UNCASED, CONTRACTOR SHALL FURNISH AND INSTALL SAND BAGS OR EARTH FILLED BAGS TO FULLY SUPPORT INSTALLED FACILITIES. SEE NOTE "6" R.O.W. LIMIT GAUZE INSECT SCREEN NOTE: 5- EACH CASING END SHALL HAVE A MINIMUM DISTANCE OF 8 METER FROM THE CENTER LINE OF ROAD. PIPELINE ROAD CROSSING PLAN 300MIN. PIPE LINE 3- DOUBLE COAT AND DOUBLE WRAP ON CARRIER PIPE OVER LENGTH OF CASING AND EXTENDING 3 METERS EITHER SIDE OF END OF CASING, CASING PIPE TO BE SINGLE COAT DOUBLE WRAP VENT PIPE TO BE SIMILARY TREATED TO A HEIGHT OF 300 mm. ABOVE GROUND LEVEL. ABOVE THIS LEVEL THE VENT PIPE TO BE PRIMED AND PAINTED DAYGLOW YELLOW. 4- CASING SHALL BE FREE OF BURRS AT WELDS,VENT PIPES SHALL BE INSTALLED BEFORE INSERTION OF CARRIER PIPE. EXCAVATED AREA BOTTOM OF UNDERCUT 180° BEND 2- WITHIN A CASED CROSSING THE PIPELINE IS CATHODICALLY PROTECTED. CARE SHOULD BE TAKEN NOT TO DAMAGE COAT & WRAP WHEN PULLING THROUGH CARRIER PIPE AND THAT INSIDE OF THE CASING IS DRY BEFORE END SEALS ARE APPLIED. (SEE NOTE 13) SHOULD ER HARD DITCH BURROW AREA CASING PIPE C L 1- ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE STATED. VENT C CASING L END OF VENT PIPE TO BE GROUNDFLUSHED WITH INSIDE SURFACE OF CASING PIPE DETAIL "A" 100 150 200 250 300 350 VENT CASING PIPE NPS 8" 10" 12" 16" 16" 18" DN 200 250 300 400 400 450 THK. NPS DN SCH. 4.7 5.6 6.3 7.9 7.9 7.9 3" 3" 3" 3" 3" 3" 80 STD. 80 STD. 80 STD. 80 80 80 STD. STD. STD. STD. 16" 400 20" 500 7.9 3" 20" 500 24" 600 7.9 4" 100 STD. 18" 2 DN 22" 24" 30" 36" 40" 450 550 600 750 900 1000 42" 1050 24" 26" 30" 600 650 750 7.9 7.9 9.5 900 11.1 48" 1200 15.8 36" 42" 1050 48" 1200 12.7 15.8 80 mm 3000 3000 3000 3000 3000 3000 3000 100 STD. 3000 4" 100 STD. 2000 4" 4" 100 STD. 4" 100 STD. 4" 100 STD. 4" 100 STD. 4" 100 STD. THIS DWG. SUPERSEDES DWG. No.SM-6016 INSULATOR SPACE 3000 C B A REV. PIPELINE ROAD CROSSING TYPICAL ARRANGEMENT OF CASED PIPE ROAD CROSSING 2000 2000 2000 DATE NO REVISION PERMITTED UNLESS APPROVED BY STANDARD ORGANIZATION 2000 2000 DESCRIPTION IRANIAN PETROLEUM STANDARDS DATE DRAWING No. IPS-D-PI-175 SHEET 2 2 REV.
© Copyright 2024 ExpyDoc