06.03 - CHECK NGV GAS SOLENOID VALVE 06.02 - e-JPK

DUTI - TUGASAN PROGRAM KEMAHIRAN / DUTI-TASK OF SKILLS PROGRAM
Kod Program Kemahiran
:
P-116-2
Skills Program Code
Tahap
Level
Nama Program Kemahiran
:
PEMASANG SISTEM GAS ASLI KENDERAAN
Skills Program Name
(01) PERFORM PRE-CONVERSION TEST
01.01 -
MATCH NGV COMPONENTS FOR VEHICLES
01.02 -
POSITION NGV COMPONENTS TO VEHICLE
01.03 -
INSPECT ENGINE COOLING SYSTEM
01.04 -
INSPECT VEHICLE ELECTRICAL SYSTEM
01.05 -
INSPECT FUEL SYSTEM
01.06 -
INSPECT ENGINE IGNITION SYSTEM
01.07 -
CONDUCT ENGINE COMPRESSION TEST
01.08 -
INSPECT VEHICLE CHASSIS
01.09 -
PRODUCE PRE-CONVERSION CHECK REPORT
(02) PERFORM NGV CONVERSION
02.01 -
INSTALL NGV CYLINDER
02.02 -
INSTALL NGV REGULATOR
02.03 -
INSTALL NGV MIXER
02.04 -
INSTALL MASTER SHUT OFF VALVE / FILLING RECEPTACLE
02.05 -
INSTALL GAS SOLENOID / PRESSURE GAUGE
02.06 -
INSTALL PETROL SOLENOID VALVE
02.07 -
INSTALL HIGH PRESSURE TUBING / PIPE
02.08 -
INSTALL IGNITION TIMING MODIFIER
02.09 -
INSTALL SELECTOR SWITCH
02.10 -
INSTALL NGV WIRING SYSTEM
(03) PERFORM POST CONVERSION TEST
03.01 -
CHECK NGV ELECTRICAL COMPONENTS FOR FUNCTIONALITY
03.02 -
CONDUCT LEAKAGE TEST
03.03 -
CHECK ENGINE PERFORMANCE ON PETROL MODE
03.04 -
CHECK ENGINE PERFORMANCE ON GAS MODE
03.05 -
CARRY OUT VEHICLE ROAD TEST
03.06 -
STICK IDENTIFICATION PLATE AND LABELS ON VEHICLE
03.07 -
ARRANGE AND APPROVAL OF NGV INSTALLATION BY RTA
(04) SERVICE NGV FUEL SYSTEM
04.01 -
CHECK ALL NGV COMPONENTS FOR SERVICEABILITY
04.02 -
CHECK TUBING FOR DAMAGE / DENTED
04.03 -
CHECK ALL NGV COMPONENT BRACKET
04.04 -
CHECK FOR SYSTEM LEAKAGE
04.05 -
OVERHAUL NGV REGULATOR
04.06 -
TUNE ENGINE ACCORDING TO SPECIFICATION
04.07 -
CHECK IDENTIFICATION LABEL AND PLATE
(05) PERFORM NGV SYSTEM FAULT DIAGNOSIS
05.01 -
TROUBLESHOOT HIGH GAS CONSUMPTION
05.02 -
TROUBLESHOOT ENGINE OVERHEATING
05.03 -
TROUBLESHOOT ENGINE JERKING AT LOW SPEED / HIGH SPEED
05.04 -
TROUBLESHOOT HARD STARTING ON NGV
05.05 -
TROUBLESHOOT ENGINE ROUGH IDLING ON NGV
05.06 -
TROUBLESHOOT ENGINE LOSS OF POWER
(06) SERVICE NGV ELECTRICAL SYSTEM
06.01 -
CHECK ELECTRICAL WIRING SYSTEM
06.02 -
CHECK SELECTOR SWITCH
06.03 -
CHECK NGV GAS SOLENOID VALVE
06.04 -
CHECK PRESSURE GAUGE
06.05 -
CHECK IGNITION TIMING MODIFIER
06.06 -
CHECK IGNITION TIMING MODIFIER
:
2
(07) PERFORM PERIODICAL INSPECTION
07.01 -
CARRY OUT COMPLETE INSPECTION ON NGV SYSTEM
07.02 -
INSPECT CYLINDER FOR DEFECTS AND VALIDITY
07.03 -
CHECK VEHICLE LABELS AND DOCUMENTS
07.04 -
AUDIT NGV WORKSHOP FACILITIES