Status of the sc cw LINAC project Viktor Gettmann, GSI-10th Okt 2014- TASCA14@GSI 1/11 Content 1. Short Introduction 2. In three steps to the sc cw LINAC 3. The sc cw Demonstrator Status 4. Timeclock Viktor Gettmann, GSI-10th Okt 2014- TASCA14@GSI 2/11 What is the sc cw LINAC? -The first step6 7.3 Minaev et al (IAP, 2009) • • • • variable output energy compact design optimal to GSI HLI low operating costs Viktor Gettmann, GSI-10th Okt 2014- TASCA14@GSI 3/11 Three steps 1 2 1. Full performance test of sc cw LINAC Demonstrator • @GSI HLI • proof of principle 2. Full performance test of a shorter sc cavity • 3 • • • energy variation (by Ampl & Phase) 8 gaps simpler design easier to fabricate 3. Advanced Demonstrator • • • Viktor Gettmann, GSI-10th Okt 2014- TASCA14@GSI up to 4.61 MeV/u @ a/q= 6 5× sc CH-Cavity, 5× sc Solenoid possible to place in HLI@GSI 4/11 The third step, Advanced Demonstrator Timetable sc-cw-LINAC 2014 Specification of short cavity 2015 Full performance test of Demonstrator @ GSI HLI 2016 Specification of next cavities 2019 Full performance test of advanced Demonstrator @ GSI HLI Viktor Gettmann, GSI-10th Okt 2014- TASCA14@GSI 5/11 Demonstrator 217 MHz Cavity 2200 Inner diameter (mm) 1120 Material tank Aluminiu m Position stability of fiducials to each other (µm) ±25 Isolation vacuum (mbar) <10-5 Total leak rate (mbar*l/s) 10-9 Max. operation pressure (bar) <0,5 Operation temperature (K) 4,4 Temperature nitrogen shield (K) 77 Material magnetic shielding µ- Metal (2mm) Transversal /Longitudinal tolerance (mm) ± 0.2 / ± 2 Shielding factor of earth magnetic field 20 Max. static losses in stand-by operation (W) <10 Cold-warm-transition (beampipe) - gradient (K/cm) 10 LN / LHe reservoir Support frame Solenoids Inner length (mm) Viktor Gettmann, GSI-10th Okt 2014- TASCA14@GSI 6/11 Demonstrator Project @ GSI HLI Viktor Gettmann, GSI-10th Okt 2014- TASCA14@GSI 7/11 What is the status? test stand is prepared Viktor Gettmann, GSI-10th Okt 2014- TASCA14@GSI 8/11 217 MHz sc CH-Cavity 325 MHz Cavity fabrication of 217 MHz sc Cavity Viktor Gettmann, GSI-10th Okt 2014- TASCA14@GSI 9/11 Cryostat Aug. 2010 Oct. 2013 Oct. 2013 Oct. 2014 Oct. 2013 Viktor Gettmann, GSI-10th Okt 2014- TASCA14@GSI 10/11 Time clock FULL Perf. Test Advanced Demonstrator Cryostat study Delivery 25m³ Helium Recovery Balloon 2011 Delivery Components Beamline Preparation Ordering Solenoids, Cavities, Cryostats Delivery 3000 Ltr. LHe reservoir 2019 Laboratory for HPR and RF Testing facility @ HIM, Mainz Ordering Cryostat+ Solenoids Bunker Installation Layout for Advanced Demonstrator 2017 2013 Beam line preparation Demonstrator testing long+short Cavity 2015 Control Room Full Perf. Test Demonstrator Finishing Beam line Delivery Cryostat + Solenoids Delivery 217Mhz Cavity First RF Test Cavity Viktor Gettmann, GSI-10th Okt 2014- TASCA14@GSI 11/11
© Copyright 2025 ExpyDoc