Strabag AG Water Technologies Divison 3H, Subdivison MT, Business Unit DD Selected ongoing Projects Status: 05.2014 Sighetu Marmatie WWTP, Romania Extension and Rehabilitation of Wastewater Treatment Plant Sighetu Marmatie Client: Water Company SC VITAL SA Completion Year: 2016 Financing: Pos Mediu (77% EU, rest local) Design & execution of primary treatment, biological stage treatment (extended aeration) and sludge Description: treatment (aerobic sludge stabilization in the activated sludge tanks, mechanical sludge thickening, dewatering and lime conditioning). 37.500 PE. Targoviste WWTP, Romania Extension and Rehabilitation of Wastewater Treatment PlantTargoviste Client: Water Company Targoviste Completion Year: 2014 Financing: Pos Mediu (77% EU, rest local) Demolition of existing WWTP, Design & execution of primary, secondary and teritary treatment. Description: 125.800 PE Deva & Hunedoara WWTPs, Romania Extension and Rehabilitation of Wastewater Treatment Plant's Deva and Hunedoara Client: Water Company APA PROD SA Completion Year: 2014 Financing: Pos Mediu (77% EU, rest local) Design execution for tertiary treatment step; Obtaining permits, legal agreements and permits for Description: construction / demolition; Execution of the remaining works for biological treatment step according to the project made by previous contractor Yapi System. Capacity: Primary Sludge Treatment: 2.737 kg/day (182 m3/day), Excess Sludge: 2.568 kg/day (367 m3/day) BRP Operation Lots 1 & 2, Romania Operation of Bioremediation Plants in Balaria, Videle, Ciuperceni and Ticleni Client: OMV Petrom Completion Year: 2017 Financing: Private Operation of Bioremediation Plants, of temporary landfills and composed facilities of OMV Petrom in Description: Balaria, Videle, Ciuperceni (Lot 1) and Ticleni (Lot 2) 2014-05_Projekts in Execution_MT DD 1/4 Strabag AG Water Technologies Divison 3H, Subdivison MT, Business Unit DD Selected ongoing Projects Status: 05.2014 Diyarbakir WWTP, Turkey Construction of Diyarbakir Wastewater Treatment Plant Client: IPA - Ministry of Environment Completion Year: 2016 Financing: EU Design & construction of the extension of Diyarbakir Wastewater Treatment Plant with a capacity of Description: 861.837 PE Ceyhan WWTP, Turkey Construction of Ceyhan Wastewater Treatment Plant Client: IPA - Ministry of Environment Completion Year: 2016 Financing: EU Design & construction of the first stage of Ceyhan Wastewater Treatment Plant with a capacity of Description: 91.433 PE Kayseri LAND, Turkey Construction Works for Kayseri Sanitary Landfill and Pilot Composting Plant Client: Kayseri Metropolitan Municipality Completion Year: 2015 Financing: IBRD (Worldbank) Construction of a Sanitary Landfill for a net Waste Disposal Capacity of 3.250.000 m³, Pilot Description: Composting Plant with Capacity of 5.000 to/year (only Infrastructure and Parking Area), Leachate balancing Pond, 1,68 km long Leachate transmission line and Operation Buildings (Admin, Control, Weightbridge and Workshop Buldings) Zivinice WWTP, Bosnia (BiH) Completion of Construction of Phase 1 of the Wastewater Treatment Plant Client: Zivinice Municipality Completion Year: 2015 Financing: IBRD (Worldbank) Detailed Design, manufacture, test, deliver, install, complete and commission certain facilities for Description: Wastewater Treatment Plant of Zivinice with a capacity of 25.000 PE 2014-05_Projekts in Execution_MT DD 2/4 Strabag AG Water Technologies Divison 3H, Subdivison MT, Business Unit DD Selected ongoing Projects Status: 05.2014 Leskovac WWTP, Serbia Construction of Leskovac Wastewater Treatment Plant Client: European Union Delegation Completion Year: 2015 Financing: IBRD (Worldbank) Design and construction of Phase 1 of Leskovac Wastewater Treatment Plant with a capacity of Description: 86.000 PE Zhoucun Supply, China Zibo Zhoucun Ganqing Sewage Treatment Plant Upgrade & Water Reuse Project Client: Zibo Hanhai Water Co.,Ltd. Completion Year: 2015 Financing: Softloan (RBI) Design and supply of Mechanical-, Electical-, Instrumentation- and Automation Equipment. Description: Supervision of installation, testing, start-up and commissioning. Operators training and aftersales services. Tongu WASU 1, Ghana 4 Constituencies Water Supply Scheme - Phase 1 Central Tongu and Adaklu Anyigbe Client: Community Water and Sanitation Agency (CWSA) Completion Year: 2015 Financing: Softloan (RBI) Design and construction of Phase 1 Tongu Water Supply Project Description: Drinking Water Treatment Plant (2.500 m3/day), 2 Water Towers (60 and 100 m3), Booster Pumping Station, Water Main Lines (37 km), Electrical Power Supply by Photovoltaiv (7.850 kWh7Month) Tongu WASU 2, Ghana 4 Constituencies Water Supply Scheme - Phase 2 Central Tongu and Adaklu Anyigbe Client: Community Water and Sanitation Agency (CWSA) Completion Year: 2015 Financing: Softloan (RBI) Design and construction of Phase 2 Tongu Water Supply Project Description: Extension of Drinking Water Treatment Plant to 5.000 m3/day, 3 Water Towers (30, 60 and 65 m3), Distribution Network (20 km) and Water Main Lines (56 km). Persons with access to Drinking Water: 78.000 2014-05_Projekts in Execution_MT DD 3/4 Strabag AG Water Technologies Divison 3H, Subdivison MT, Business Unit DD Selected ongoing Projects Status: 05.2014 Chirpan WASU, Bulgaria Water Supply Networks in territory of Chirpan Client: Municipality of Chirpan Completion Year: 2015 Financing: 85% EU Agricultural Fund for Rural Development, 15% local Description: Execution of Construction and Assembly Works on project: Reconstruction / rehabilitation of watersupply network in the villages of Gita, Svoboda and Zetyovo. Distribution Network (20 km), House Connections (620 Pcs & 4 km), Fire Hydrants (80 Pcs), automatic air and shut-off valves (170 Pcs) and road reconstruction works (8.000 m2 asphalt) 2014-05_Projekts in Execution_MT DD 4/4
© Copyright 2024 ExpyDoc