4M Market Coupling

4M Market Coupling
• The Project
• Future projects
• Bucuresti, 21/10/2014
AGENDA
I. Czech-Slovak-Hungarian-Romanian Common Parts
1. Market Coupling Theory and Practice
2. Project road
3. Operational overview
II. Further Information on Regional Markets
Page 2
Market Coupling Theory 1/2
Market Coupling (MC) = Implicit Auction: optimal allocation of energy and crossborder transmission capacity rights in one common process. All inputs (bids and
capacity data) are taken into account together.
Method: almost the same as local matching of bids but using cross-border profiles
as constraint of trade between market areas.
Energy, maximised by cross-border capacity, flows from low price area to high price
area in order to try to balance the market prices.
SELLERS
High
Price
Area
Capacity
Constraint
Low
Price
Area
50Hz
BUYERS
Page 3
Market Coupling Theory 2/2
In case of price difference between two neighbouring areas, congested border
in the direction of the high price area.
In case of equal prices of two neighbouring areas, transmission capacity was
enough for the market.
Price difference (spread) between
neighbouring market areas’ prices
=
Capacity auction price multiplied by
=
cross-border flow
Capacity auction price
TSOs’ Congestion Revenue
Implementation of MC requires close TSO-PX cooperation and NATIONAL
REGULATORY AGENCY support.
Operation of MC is daily common process operated by the involved TSOs and PXs.
Page 4
Market Coupling in Practice
Theoretically Proved Optimal
Day-Ahead Trading Form
Several Implementation Project
on voluntary basis
Flow-Based MC defined as
day-ahead Target Model
Elaboration of harmonized
EU legal background
Implementation of European Price Coupling as soon as
possible and involving at least all EU Member States
Page 5
Project road
30 May 2011
11 Sept 2012
Meanwhile
July 2013
August 2013
Memorandum of Understanding among CZ, SK, HU Parties
Launch of CZ-SK-HU Market Coupling
Romanian and Polish Letter of Intent on participating
Memorandum of Understanding among 5M
(CZ-SK-HU+RO+PL) Parties
Decision on starting 4M MC Project with the goal to implement
CZ-SK-HU+RO MC; Polish parties in observer status
Tomorrow
Launch of
4M Market Coupling
Near Future
Further steps towards the
European Price Coupling (Target Model)
via CEE project to join Multi-Regional Coupling
Page 6
4M Market Coupling Project
• Day-ahead ATC based price coupling covering
Czech-Slovak-Hungarian+Romanian market areas
• Members:
CZ-SK-HU-RO TSOs & PXs & NRAs
• Observers: Polish TSO & PX & NRA
Page 7
Project goals
Main goals:
• Extension of CZ-SK-HU MC to Romania
• 4M countries wish to introduce benefits of market integration to market
participants as soon as possible
• Get prepared for joining European Price Coupling – implement MC based
on PCR solution
Context:
• Stepwise market integration is the only way forward due to a blocked
situation and slow progress in the CEE region
– Flow-based capacity calculation methodology
– Overlapping regions and other integration activities
• CEE regional solution is not agreed yet
• The extension does not hinder the regional development as it is an
intermediate step towards European Price Coupling
Page 8
OPERATIONAL- 4M MC topology
CEPS
SEPS
MAVIR
TEL
mTMF
TSO Joint System
(mTMF+TSO Cloud)
TSO Cloud
OKTE
HUPX
OPCOM
OTE
EPEX
EPEX
EPEX
4M MC PCR Cloud
Page 9
Power eXange technical solution
• PCR implementation fully in line with the target model
– 1 Full PCR Member (OTE)
– 3 Serviced PXs (OKTE, HUPX, OPCOM) by EPEX Spot
In operation OTE and EPEX Spot act as Coordinator in rotation.
• PCR solution is an important step forward for further
integration:
– implemented interfaces can be reused with further extensions
– coupling procedures compatible with MRC (except timing)
– PCR IT solution same as in MRC
• under implementation in CSE (IBWT Project)
• already running in MRC
Page 10
TSO technical solution
• Equal status of all connected TSOs
• The only TSO platform (no rotation, simple contract)
• Allows easy changing of PX roles (Coordinator/NonCoordinator) via TSO Cloud interface system being a single
point of contact on behalf of TSO systems towards PX side
• Excellent experiences on performance and functionalities
from CZ-SK-HU MC
• mTMF and TSO Cloud systems are easily extendable
– Unlimited number of TSOs and PXs
– extension of the system with almost no costs
Page 11
4M Market Coupling: Role model
Capacity Calculation
Pre-Coupling
ATCs
Exchange Bid Submission
Market Coupling Calculation (PCR)
Net Positions
Market Clearing Prices
Cross Border Flows = Allocated Capacity
Clearing and Settlement
Post-Coupling
Publications
Coupling
Cross Border Shipment
Cross Border Nominations
Settlement of Cross Border Shipment
Congestion Revenue Distribution
(monthly)
Page 12
Further Information on REGIONAL Market
I.
SERBIA TO JOIN THE COUPLED MARKET
II.
A FUTURE FLOW BASED MARKET COUPLED according with the
new CACM guideline of the EU.
The parties Romania-Bulgaria-Greece-Serbia-Croatia
III. ROMANIA to join the CEE project
Page 13
Thank you for the attention
•
•
•
Gheorghe Visan
[email protected]
Phone +40 751 107 729
20.10.2014
14