Offline Weekly Report March 25 – March 31, 2014 JIRA production workflow – all productions are now tracked through these states, which correspond to the agreed steps for RAW, MC production and AOD re-filtering. 1. PRODUCTION 1.1 Setup RAW Pass2 of LHC11abcdef Not ready RAW JIRA ALIROOT-5177 New reconstruction of 2010 pp data Pass3 for most, 10b, 10c – pass4 Not ready RAW JIRA ALIROOT-5133 Reconstruction of runs 137161 and 146824 Not ready MC JIRA ALIROOT-5347 Continuation of MC- LHC13e7 Needs new AliRoot revision (v5-03-Rev-*), porting LHC14b2 request created MC JIRA ALIROOT-5342 DPMJET Pb-p production for MUON + (PCM/PHOS/EMCAL) LHC13f4 Crash in simulation, most likely incomplete porting request. No news from requestor 14 days JIRA ALIROOT-5327 1.2 Running 10% or full statistics MC LHC14a1a (0-10%) LHC14a1b (10-50%) LHC14a1c (50-90%) LHC11h anchored minbias HIJING with added GA signals Validated by PWG_HF, GA, LF, JE 90% completed AOD refiltering: - PWG-GE – wants AOD149 - PWG-HF – no comment - PWG-LF – no comment - PWG-GE – no comment Test runs AOD refiltering with AOD149 setup are completed Analysis train QA is OK. Waiting for PWG QA to continue with AOD refiltering (deadline Monday) MC JIRA ALIROOT-5328 Request to regenerate MC for run 195483 LHC14c2 JIRA ALIROOT-5417 MC Pythia jet-jet anchored in 2010 (pp) data with low seed threshold LHC14b6a, LHC14b6b, LHC14b6c, LHC14b6d MC Running 10% statistics – memory issue ‘resolved’ by reducing generated number of events per job. JIRA ALIROOT-5346 DPMJET Pb-p production for MUON + (PCM/PHOS/EMCAL) LHC13e2_fix 80% completed AOD AOD157 JIRA ALIROOT-5304 AOD refiltering LHC12a11[a-i] Running full statistics JIRA ALIROOT-5396 1.3 in 10% QA MC Full MC flow production including forward detectors LHC14b8a (0-5%) LHC14b8b (40-50%) ZDC trigger missing – no detector QA. No news from analysis QA, but likely the 10% have to be redone. No approval from TPC on the setup (reminders sent) JIRA ALIROOT-5338 MC production request, Pythia pp at 7TeV MC LHC14b7 QA to be done by EMCAL. AOD refiltering to be done post-production (old AliRoot) MC JIRA ALIROOT-5345 MC Production for heavy-flavour electrons in p-Pb (triggered TRD and EMCal data) LHC14b3a(LHC13d anchors) LHC14b3b(LHC13f anchors) LHC14b3c(LHC13e anchors) Detector and analysis QA requested MC JIRA ALIROOT-5344 Simulation for pp at 900GeV for multiplicity analysis with FMD LHC14c1a LHC14c1b LHC14c1c In QA now and will wait for QM productions completion to continue to full statistics AOD JIRA ALIROOT-5407 Reproduction of LHC10h AODs AOD156 Analysis QA train running. AOD JIRA ALIROOT-5307 AOD Reproduction for pPb MC’s (LHC13e7, LHC13b_efix_p[1-4] LHC14c1a LHC14c1b LHC14c1c Analysis QA train should be run JIRA ALIROOT-5343 1.4 Completed and in final QA MC MC Production for D mesons in p-Pb (extension of LHC13d3) LHC13d3_plus MC JIRA ALIROOT-5340 Muon arm only acceptance and resolution study LHC14b5 AOD JIRA ALIROOT-5337 AOD reproduction p+Pb data AOD154 AOD JIRA ALIROOT-5333 AOD reproduction for PYTHIA jet-jet anchored to p+Pb (LHC14b4_plus) AOD152 AOD JIRA ALIROOT-5330 Reproduction of AODs for LHC12a15e_fix AOD149 JIRA ALIROOT-5335 AOD Refiltering of MC AODs for LHC11h AOD148 JIRA ALIROOT-5339 Report summary Productions in running phase – 5 (4MC, 1 AOD) Productions in preparatory or QA phase - 17 FRAMEWORK v5-05-Rev-01 • • • • • • v5-04-Rev-19 • • • New release v5-05-Release Changes for the new raw data format: CTP, HLT Tuning of MC for PID (dE/dx in TPC): in progress? Changes in the CMake build system: RPM creation (DA, AliMDC), partially done Bug reports in JIRA: several closed Coverity defects: in progress Tests & profiling: not yet done New tags ALIROOT-5414 Porting request for c453ec1 - store b and c from online track to AliESDTrdTrack ALIROOT-5419 Porting request for 3e32fcf - remove descriptors and classes with obsolete TRD inputs Changes for FASTJET compilation CALIBRATION PWGPP + CWG6 • • 2011 reprocessing: Tests will start with new Release when ready o See http://savannah.cern.ch/task/?33399 § Will use runs requested by TOF (1 PbPb from LHC11h, 1 pp from LHC12a) for testing • TPC memory hungry components will be included if memory and time during merging are verified to be ok (ongoing) o First test on one run (reaching maximum number of accepted entries for TPC): <2.5 GB memory usage, 50 minutes for merging • T0 new time slewing calibration for PbPb 2011 data ready Run2 online calibration strategy o Note in preparation o Detectors’ plans under discussion § HLT Hands-on session during Offline Week in March (18 March) • 5 participants (MUON, T0, ITS, TPC) • MUON and T0 working in the direction of a HLT component § Luminous Region § Calibrations with tracks o DAs speed-up required by DAQ o CPass information over fill under discussion § No automatic merging, no export to OCDB CRITICAL ISSUES
© Copyright 2024 ExpyDoc