1. PRODUCTION
1.1 Setup
RAW
Pass2 of LHC11abcdef
Not ready
RAW
JIRA ALIROOT-5177
New reconstruction of 2010 pp data
Pass3 for most, 10b, 10c – pass4
Not ready
RAW
JIRA ALIROOT-5133
Reconstruction of runs 137161 and 146824
Not ready
MC
JIRA ALIROOT-5347
Continuation of MC- LHC13e7
Needs new AliRoot revision (v5-03-Rev-*), porting
LHC14b2
request created
MC
JIRA ALIROOT-5342
DPMJET Pb-p production for MUON +
(PCM/PHOS/EMCAL)
LHC13f4
Crash in simulation, most likely incomplete porting
request. No news from requestor 14 days
JIRA ALIROOT-5327
1.2 Running 10% or full statistics
MC
LHC14a1a (0-10%)
LHC14a1b (10-50%)
LHC14a1c (50-90%)
LHC11h anchored minbias HIJING with added GA
signals
Validated by PWG_HF, GA, LF, JE
90% completed
AOD refiltering:
- PWG-GE – wants AOD149
- PWG-HF – no comment
- PWG-LF – no comment
- PWG-GE – no comment
Test runs AOD refiltering with AOD149 setup are
completed
Analysis train QA is OK. Waiting for PWG QA to
continue with AOD refiltering (deadline Monday)
MC
JIRA ALIROOT-5328
Request to regenerate MC for run 195483
LHC14c2
JIRA ALIROOT-5417
MC
Pythia jet-jet anchored in 2010 (pp) data with low
seed threshold
LHC14b6a,
LHC14b6b,
LHC14b6c,
LHC14b6d
MC
Running 10% statistics – memory issue ‘resolved’ by
reducing generated number of events per job.
JIRA ALIROOT-5346
DPMJET Pb-p production for MUON +
(PCM/PHOS/EMCAL)
LHC13e2_fix
80% completed
AOD
AOD157
JIRA ALIROOT-5304
AOD refiltering LHC12a11[a-i]
Running full statistics
JIRA ALIROOT-5396
1.3 in 10% QA
MC
Full MC flow production including forward detectors
LHC14b8a (0-5%)
LHC14b8b (40-50%)
ZDC trigger missing – no detector QA. No news
from analysis QA, but likely the 10% have to be
redone.
No approval from TPC on the setup (reminders sent)
JIRA ALIROOT-5338
MC production request, Pythia pp at 7TeV
MC
LHC14b7
QA to be done by EMCAL. AOD refiltering to be
done post-production (old AliRoot)
MC
JIRA ALIROOT-5345
MC Production for heavy-flavour electrons in p-Pb
(triggered TRD and EMCal data)
LHC14b3a(LHC13d anchors)
LHC14b3b(LHC13f anchors)
LHC14b3c(LHC13e anchors)
Detector and analysis QA requested
MC
JIRA ALIROOT-5344
Simulation for pp at 900GeV for multiplicity analysis
with FMD
LHC14c1a
LHC14c1b
LHC14c1c
In QA now and will wait for QM productions
completion to continue to full statistics
AOD
JIRA ALIROOT-5407
Reproduction of LHC10h AODs
AOD156
Analysis QA train running.
AOD
JIRA ALIROOT-5307
AOD Reproduction for pPb MC’s (LHC13e7,
LHC13b_efix_p[1-4]
LHC14c1a
LHC14c1b
LHC14c1c
Analysis QA train should be run
JIRA ALIROOT-5343
1.4 Completed and in final QA
MC
MC Production for D mesons in p-Pb (extension of
LHC13d3)
LHC13d3_plus
MC
JIRA ALIROOT-5340
Muon arm only acceptance and resolution study
LHC14b5
AOD
JIRA ALIROOT-5337
AOD reproduction p+Pb data
AOD154
AOD
JIRA ALIROOT-5333
AOD reproduction for PYTHIA jet-jet anchored to
p+Pb (LHC14b4_plus)
AOD152
AOD
JIRA ALIROOT-5330
Reproduction of AODs for LHC12a15e_fix
AOD149
JIRA ALIROOT-5335
AOD
Refiltering of MC AODs for LHC11h
AOD148
JIRA ALIROOT-5339
Report summary
Productions in running phase – 5 (4MC, 1 AOD)
Productions in preparatory or QA phase - 17
FRAMEWORK
v5-05-Rev-01
•
•
•
•
•
•
v5-04-Rev-19
•
•
•
New release v5-05-Release
Changes for the new raw data format: CTP, HLT
Tuning of MC for PID (dE/dx in TPC): in progress?
Changes in the CMake build system: RPM creation (DA, AliMDC),
partially done
Bug reports in JIRA: several closed
Coverity defects: in progress
Tests & profiling: not yet done
New tags
ALIROOT-5414 Porting request for c453ec1 - store b and c from online track to AliESDTrdTrack
ALIROOT-5419 Porting request for 3e32fcf - remove descriptors and
classes with obsolete TRD inputs
Changes for FASTJET compilation
CALIBRATION
PWGPP +
CWG6
•
•
2011 reprocessing: Tests will start with new Release when
ready
o See http://savannah.cern.ch/task/?33399
§ Will use runs requested by TOF (1 PbPb from
LHC11h, 1 pp from LHC12a) for testing
• TPC memory hungry components will be
included if memory and time during
merging are verified to be ok (ongoing)
o First test on one run (reaching
maximum number of accepted
entries for TPC): <2.5 GB
memory usage, 50 minutes for
merging
• T0 new time slewing calibration for PbPb
2011 data ready
Run2 online calibration strategy
o Note in preparation
o Detectors’ plans under discussion
§ HLT Hands-on session during Offline Week in
March (18 March)
• 5 participants (MUON, T0, ITS, TPC)
• MUON and T0 working in the direction of
a HLT component
§ Luminous Region
§ Calibrations with tracks
o DAs speed-up required by DAQ
o CPass information over fill under discussion
§ No automatic merging, no export to OCDB
CRITICAL ISSUES