the brochure - Singapore Manufacturing Federation

Contact Us
Enquiries: Zhang Jun (Mr)
DID:
6826 3114
Email:
[email protected]
Registration Details
Registration Fees : Free of Charge.
Registration Details
(on first-come-first -serve basis due to limited seats).
Online registration
Click here to make your registration online
Registration Closing Date: 28 Oct 2014
Dr / Mr / Ms / Mrs :_________________________________________________________
Designation: _________________________ Email: _____________________________
Industry Dialogue
Consultation of Stakeholders
Technical Reference on Container equipment
interchange receipt (CEIR) for International
Organisation for Standardisation (ISO) freight
containers
Date:
11 Nov 2014, Tuesday
Time:
2.00pm to 5.00pm
Venue:
SMF House, Concourse
Organisation (in full): _____________________________________________________
Level 2
2985 Jalan Bukit Merah
Singapore 159457
Contact: ____________________________ Mobile: ____________________________
________________________________________________________________________
Mobile:______________________ Tel: __________________ Fax: _________________
Organised by:
___________________________________
Singapore Manufacturing Federation - Standards Development Organisation
(SMF-SDO).
Organised By:
SMF-SDO was appointed since April 2011 by SPRING Singapore, the National
Standards Body (NSB), to administer the Biomedical Standards Committee (BMSC),
Food Standards Committee (FSC) and General Engineering & Safety Standards
Committee (GESSC) under the Singapore Standards Council.
On 1 April 2014, SMF-SDO was appointed by SPRING Singapore as the SDO for
the Manufacturing Standards Committee (MSC).
The Singapore Standardisation Programme is managed by
Introduction
Who Should Attend
The Technical Reference on Container equipment interchange receipt (CEIR) for
survey of International Organisation for Standardisation (ISO) freight containers is a
draft standard aimed to address urgent industry needs. It is being developed by the
Container Survey Working Group of the Logistics Technical Committee under the
purview of the Manufacturing Standards Committee.
In accordance with the industry-led, consensus-building process of Singapore’s
national standardisation programme, on request of the Logistics Technical
Committee, Singapore Manufacturing Federation – Standards Development
Organisation (SMF-SDO) cordially invites all stakeholders in the container
interchange industry to join us in this Industry Dialogue and be actively involved in
the standards development process.
Programme Details
Time
Events
2:00 pm
Registration
2:30 pm
Opening Address – Overview of National Standardisation Programme
Prof Tan Kok Choon, Member / Manufacturing Standards Committee, Director (Degree
Education) / The Logistics Institute Asia Pacific
2:35 pm
At this dialogue session, participants will interact with members of the Technical
Committee and provide invaluable feedback from their varied perspectives for the
proposed Technical Reference.
Presentation on the Technical Reference, covering:
-
Accountability of the equipment in the supply chain;
-
Recommended notification and survey forms;
-
Reportable and non-reportable (normal dent) damages;
-
Process for reportable damages;
-
Questions and answers (Q&A).
Mr Alfred Cheong, Deputy Chairman / Logistics Technical Committee, AVP (Haulier Services)
/ PSA Corporation Ltd
Who Should Attend




Shipping lines
Freight forwarders
Port/terminal operators
Hauliers
4:00 pm
Refreshments/Tea-Break/Networking
4:30 pm
Sharing of Feedback for Presentation
4:45 pm
Closing Speech by Chairman of Logistics Technical Committee
Ms Laura Lim, Chairman / Logistics Technical Committee, Executive Director / Container




Consignees/shippers
Container depot operators
Logistics service providers
Surveyors
Depot Association (Singapore)
5:00pm
End of Programme
Terms & Conditions
Key Highlights



What is a Technical Reference
How container’s custody is accounted for throughout the supply chain
How reporting criteria can facilitate container interchange and clear liability
1) Notice of change in participant’s name, organisation, address and contacts must be given in
writing, not less than 3 working days before the briefing session/workshop commencement date.
2) SMF-SDO reserves the right to amend the programme and/or these terms and conditions
without prior notice.
3) As the Technical Reference is still a draft in progress,
- No photographing or A/V recording by participants is allowed;
- Information given on the feedback forms is for participants’ on-site reading only and participants
are required to return the forms at the end of the session.