13401 Brooks Drive
Baldwin Park, CA 91706
p 626.338.8810
f 626.338.8816
[email protected]
shademakerusa.com
© 2015 Shademaker. All rights reserved.
SMOG-GMK-115
CONCRETE MOUNT KIT
IN-GROUND FITTING KIT
Concrete Mount Kit includes:
Locator Screws
A - Base Plate
& Washers
B - Stem Bolts (6)
C - Excalibur Bolts - (6) 014x150mm - NOT INCLUDED
Acetal Ring
D - Allen Wrench
Upper
Internal Stem
Holes for
Excalibur Bolts
Base Plate
Upper
Internal Stem
Acetal Ring
Lower
Internal Stem
Holes for
Excalibur Bolts
Concrete
VERY IMPORTANT: To achieve the exact desired position of the Galaxy canopy (when in
the open position or a perfectly symmetrical multiple Galaxy installation, it is imperative that
the installation fitting be aligned correctly. Please follow the detailed instructions below.
The Galaxy Concrete Mount Kit has twelve (12) holes, six (6) are countersunk for bolting to
the concrete patio, and the other six (6) are tapped to accept the stem bolts.
STEP 1 Bolt Base Plate
Bolt base plate to concrete using six (6) 014x150mm Excalibur bolts (not included), making
sure two TAPPED HOLES are lined up in the direction of the desired primary mast and
boom position. The countersunk holes are used for bolting to the concrete but should not
be used for alignment. You must align two TAPPED HOLES to achieve the desired position.
STEP 2 Bolt Lower Internal Stem
Attach lower internal stem to base plate using six (6) stem bolts. Once attached, two
COUNTERSUNK HOLES on the lower internal stem will line up in the direction of the
primary mast and boom position. If base plate is not set using tapped holes for alignment,
the internal stem will not line up properly. See above diagram. Make sure bolts are very
tight.
STEP 3 Bolt Upper Internal Stem
Slide acetal ring over lower internal stem. Slide upper internal stem over lower internal
stem. Bolt (4) locator screws and washers (included with umbrella) to lower stem.
Refer to umbrella manual for further installation instructions.
1
Stem Bolts
Lower
Internal Stem
In-Ground
Fitting
C
Ground Level
300mm
Locator Screws
& Washers
Acetal Ring
Stem Bolts
Base Plate
Concrete
B
Stem Bolts
Upper
Internal Stem
Concrete
Footing
Lower
Internal Stem
800mm
In-Ground
Fitting
Flare at
bottom
Approximately 0.3m3 of concrete required
assuming
the terrain is thick clay. Fine soil
Ground
Level
requires appoximately 0.5m3/750kg.
300mm
Recommend (6) steel bars, length 1.0m
VERY IMPORTANT: To achieve the exact desired position of the Galaxy canopy (when in
the open position or a perfectly symmetrical multiple Galaxy installation, it is imperative that
the installation fitting be aligned correctly. Please
follow the detailed instructions below.
Concrete
800mm
Locator Screws
& Washers
A
800mm
D
Lower
Internal Stem
1.2m
C
Upper
Internal Stem
Acetal Ring
1.2m
B
Locator Screws
& Washers
C - In-Ground Fitting
Stem Bolts
A
In-Ground Fitting Kit includes:
A - Stem Bolts (6)
B - Allen Wrench
Footing
The Galaxy In-Ground Fitting has six (6) tapped holes to accept six (6) stem bolts.
STEP 1 Preparation
Flare at
The in-ground fitting needs concreting in the ground
bottom per the diagram. The hole size
recommended assumes800mm
the terrain is thick clay. Should the terrain be fine soil or sand,
the hole size should be increased. Make sure two TAPPED HOLES are lined up in the
direction of the desired primary mast and boom position. You must align two TAPPED
HOLES to achieve the desired position.
STEP 2 Bolt Lower Internal Stem
Once installed and the concrete has cured, bolt the lower internal stem to in-ground fitting
using the six (6) stem bolts. Once attached, two COUNTERSUNK HOLES on the internal
stem will line up in the direction of the primary mast and boom position. If in-ground fitting is
not set using tapped holes for alignment, the internal stem will not line up properly. See
diagram above. Make sure bolts are very tight.
STEP 3 Bolt Upper Internal Stem
Slide acetal ring over lower internal stem. Slide upper internal stem over lower internal
stem. Bolt (4) locator screws and washers (included with umbrella) to lower stem.
Refer to umbrella manual for further installation instructions.
IMPORTANT: When concreting the in-ground fitting in place, make sure not to get slurry in
the screw threads. Either apply tape over the holes on both sides of the fitting or place the
stem bolts in the threads and withdraw them with the concrete is set. Make sure that the
in-ground fitting is perfectly level. Allow the concrete to cure for the appropriate cure time for
your area before installing the stem onto the fitting.
2
CONCRETE MOUNT KIT
IN-GROUND FITTING KIT
Concrete Mount Kit includes:
Locator Screws
A - Base Plate
& Washers
B - Stem Bolts (6)
C - Excalibur Bolts - (6) 014x150mm - NOT INCLUDED
Acetal Ring
D - Allen Wrench
Upper
Internal Stem
Holes for
Excalibur Bolts
Base Plate
Upper
Internal Stem
Acetal Ring
Lower
Internal Stem
Holes for
Excalibur Bolts
Concrete
VERY IMPORTANT: To achieve the exact desired position of the Galaxy canopy (when in
the open position or a perfectly symmetrical multiple Galaxy installation, it is imperative that
the installation fitting be aligned correctly. Please follow the detailed instructions below.
The Galaxy Concrete Mount Kit has twelve (12) holes, six (6) are countersunk for bolting to
the concrete patio, and the other six (6) are tapped to accept the stem bolts.
STEP 1 Bolt Base Plate
Bolt base plate to concrete using six (6) 014x150mm Excalibur bolts (not included), making
sure two TAPPED HOLES are lined up in the direction of the desired primary mast and
boom position. The countersunk holes are used for bolting to the concrete but should not
be used for alignment. You must align two TAPPED HOLES to achieve the desired position.
STEP 2 Bolt Lower Internal Stem
Attach lower internal stem to base plate using six (6) stem bolts. Once attached, two
COUNTERSUNK HOLES on the lower internal stem will line up in the direction of the
primary mast and boom position. If base plate is not set using tapped holes for alignment,
the internal stem will not line up properly. See above diagram. Make sure bolts are very
tight.
STEP 3 Bolt Upper Internal Stem
Slide acetal ring over lower internal stem. Slide upper internal stem over lower internal
stem. Bolt (4) locator screws and washers (included with umbrella) to lower stem.
Refer to umbrella manual for further installation instructions.
1
Stem Bolts
Lower
Internal Stem
In-Ground
Fitting
C
Ground Level
300mm
Locator Screws
& Washers
Acetal Ring
Stem Bolts
Base Plate
Concrete
B
Stem Bolts
Upper
Internal Stem
Concrete
Footing
Lower
Internal Stem
800mm
In-Ground
Fitting
Flare at
bottom
Approximately 0.3m3 of concrete required
assuming
the terrain is thick clay. Fine soil
Ground
Level
requires appoximately 0.5m3/750kg.
300mm
Recommend (6) steel bars, length 1.0m
VERY IMPORTANT: To achieve the exact desired position of the Galaxy canopy (when in
the open position or a perfectly symmetrical multiple Galaxy installation, it is imperative that
the installation fitting be aligned correctly. Please
follow the detailed instructions below.
Concrete
800mm
Locator Screws
& Washers
A
800mm
D
Lower
Internal Stem
1.2m
C
Upper
Internal Stem
Acetal Ring
1.2m
B
Locator Screws
& Washers
C - In-Ground Fitting
Stem Bolts
A
In-Ground Fitting Kit includes:
A - Stem Bolts (6)
B - Allen Wrench
Footing
The Galaxy In-Ground Fitting has six (6) tapped holes to accept six (6) stem bolts.
STEP 1 Preparation
Flare at
The in-ground fitting needs concreting in the ground
bottom per the diagram. The hole size
recommended assumes800mm
the terrain is thick clay. Should the terrain be fine soil or sand,
the hole size should be increased. Make sure two TAPPED HOLES are lined up in the
direction of the desired primary mast and boom position. You must align two TAPPED
HOLES to achieve the desired position.
STEP 2 Bolt Lower Internal Stem
Once installed and the concrete has cured, bolt the lower internal stem to in-ground fitting
using the six (6) stem bolts. Once attached, two COUNTERSUNK HOLES on the internal
stem will line up in the direction of the primary mast and boom position. If in-ground fitting is
not set using tapped holes for alignment, the internal stem will not line up properly. See
diagram above. Make sure bolts are very tight.
STEP 3 Bolt Upper Internal Stem
Slide acetal ring over lower internal stem. Slide upper internal stem over lower internal
stem. Bolt (4) locator screws and washers (included with umbrella) to lower stem.
Refer to umbrella manual for further installation instructions.
IMPORTANT: When concreting the in-ground fitting in place, make sure not to get slurry in
the screw threads. Either apply tape over the holes on both sides of the fitting or place the
stem bolts in the threads and withdraw them with the concrete is set. Make sure that the
in-ground fitting is perfectly level. Allow the concrete to cure for the appropriate cure time for
your area before installing the stem onto the fitting.
2
13401 Brooks Drive
Baldwin Park, CA 91706
p 626.338.8810
f 626.338.8816
[email protected]
shademakerusa.com
© 2015 Shademaker. All rights reserved.
SMOG-GMK-115