13401 Brooks Drive Baldwin Park, CA 91706 p 626.338.8810 f 626.338.8816 [email protected] shademakerusa.com © 2015 Shademaker. All rights reserved. SMOG-GMK-115 CONCRETE MOUNT KIT IN-GROUND FITTING KIT Concrete Mount Kit includes: Locator Screws A - Base Plate & Washers B - Stem Bolts (6) C - Excalibur Bolts - (6) 014x150mm - NOT INCLUDED Acetal Ring D - Allen Wrench Upper Internal Stem Holes for Excalibur Bolts Base Plate Upper Internal Stem Acetal Ring Lower Internal Stem Holes for Excalibur Bolts Concrete VERY IMPORTANT: To achieve the exact desired position of the Galaxy canopy (when in the open position or a perfectly symmetrical multiple Galaxy installation, it is imperative that the installation fitting be aligned correctly. Please follow the detailed instructions below. The Galaxy Concrete Mount Kit has twelve (12) holes, six (6) are countersunk for bolting to the concrete patio, and the other six (6) are tapped to accept the stem bolts. STEP 1 Bolt Base Plate Bolt base plate to concrete using six (6) 014x150mm Excalibur bolts (not included), making sure two TAPPED HOLES are lined up in the direction of the desired primary mast and boom position. The countersunk holes are used for bolting to the concrete but should not be used for alignment. You must align two TAPPED HOLES to achieve the desired position. STEP 2 Bolt Lower Internal Stem Attach lower internal stem to base plate using six (6) stem bolts. Once attached, two COUNTERSUNK HOLES on the lower internal stem will line up in the direction of the primary mast and boom position. If base plate is not set using tapped holes for alignment, the internal stem will not line up properly. See above diagram. Make sure bolts are very tight. STEP 3 Bolt Upper Internal Stem Slide acetal ring over lower internal stem. Slide upper internal stem over lower internal stem. Bolt (4) locator screws and washers (included with umbrella) to lower stem. Refer to umbrella manual for further installation instructions. 1 Stem Bolts Lower Internal Stem In-Ground Fitting C Ground Level 300mm Locator Screws & Washers Acetal Ring Stem Bolts Base Plate Concrete B Stem Bolts Upper Internal Stem Concrete Footing Lower Internal Stem 800mm In-Ground Fitting Flare at bottom Approximately 0.3m3 of concrete required assuming the terrain is thick clay. Fine soil Ground Level requires appoximately 0.5m3/750kg. 300mm Recommend (6) steel bars, length 1.0m VERY IMPORTANT: To achieve the exact desired position of the Galaxy canopy (when in the open position or a perfectly symmetrical multiple Galaxy installation, it is imperative that the installation fitting be aligned correctly. Please follow the detailed instructions below. Concrete 800mm Locator Screws & Washers A 800mm D Lower Internal Stem 1.2m C Upper Internal Stem Acetal Ring 1.2m B Locator Screws & Washers C - In-Ground Fitting Stem Bolts A In-Ground Fitting Kit includes: A - Stem Bolts (6) B - Allen Wrench Footing The Galaxy In-Ground Fitting has six (6) tapped holes to accept six (6) stem bolts. STEP 1 Preparation Flare at The in-ground fitting needs concreting in the ground bottom per the diagram. The hole size recommended assumes800mm the terrain is thick clay. Should the terrain be fine soil or sand, the hole size should be increased. Make sure two TAPPED HOLES are lined up in the direction of the desired primary mast and boom position. You must align two TAPPED HOLES to achieve the desired position. STEP 2 Bolt Lower Internal Stem Once installed and the concrete has cured, bolt the lower internal stem to in-ground fitting using the six (6) stem bolts. Once attached, two COUNTERSUNK HOLES on the internal stem will line up in the direction of the primary mast and boom position. If in-ground fitting is not set using tapped holes for alignment, the internal stem will not line up properly. See diagram above. Make sure bolts are very tight. STEP 3 Bolt Upper Internal Stem Slide acetal ring over lower internal stem. Slide upper internal stem over lower internal stem. Bolt (4) locator screws and washers (included with umbrella) to lower stem. Refer to umbrella manual for further installation instructions. IMPORTANT: When concreting the in-ground fitting in place, make sure not to get slurry in the screw threads. Either apply tape over the holes on both sides of the fitting or place the stem bolts in the threads and withdraw them with the concrete is set. Make sure that the in-ground fitting is perfectly level. Allow the concrete to cure for the appropriate cure time for your area before installing the stem onto the fitting. 2 CONCRETE MOUNT KIT IN-GROUND FITTING KIT Concrete Mount Kit includes: Locator Screws A - Base Plate & Washers B - Stem Bolts (6) C - Excalibur Bolts - (6) 014x150mm - NOT INCLUDED Acetal Ring D - Allen Wrench Upper Internal Stem Holes for Excalibur Bolts Base Plate Upper Internal Stem Acetal Ring Lower Internal Stem Holes for Excalibur Bolts Concrete VERY IMPORTANT: To achieve the exact desired position of the Galaxy canopy (when in the open position or a perfectly symmetrical multiple Galaxy installation, it is imperative that the installation fitting be aligned correctly. Please follow the detailed instructions below. The Galaxy Concrete Mount Kit has twelve (12) holes, six (6) are countersunk for bolting to the concrete patio, and the other six (6) are tapped to accept the stem bolts. STEP 1 Bolt Base Plate Bolt base plate to concrete using six (6) 014x150mm Excalibur bolts (not included), making sure two TAPPED HOLES are lined up in the direction of the desired primary mast and boom position. The countersunk holes are used for bolting to the concrete but should not be used for alignment. You must align two TAPPED HOLES to achieve the desired position. STEP 2 Bolt Lower Internal Stem Attach lower internal stem to base plate using six (6) stem bolts. Once attached, two COUNTERSUNK HOLES on the lower internal stem will line up in the direction of the primary mast and boom position. If base plate is not set using tapped holes for alignment, the internal stem will not line up properly. See above diagram. Make sure bolts are very tight. STEP 3 Bolt Upper Internal Stem Slide acetal ring over lower internal stem. Slide upper internal stem over lower internal stem. Bolt (4) locator screws and washers (included with umbrella) to lower stem. Refer to umbrella manual for further installation instructions. 1 Stem Bolts Lower Internal Stem In-Ground Fitting C Ground Level 300mm Locator Screws & Washers Acetal Ring Stem Bolts Base Plate Concrete B Stem Bolts Upper Internal Stem Concrete Footing Lower Internal Stem 800mm In-Ground Fitting Flare at bottom Approximately 0.3m3 of concrete required assuming the terrain is thick clay. Fine soil Ground Level requires appoximately 0.5m3/750kg. 300mm Recommend (6) steel bars, length 1.0m VERY IMPORTANT: To achieve the exact desired position of the Galaxy canopy (when in the open position or a perfectly symmetrical multiple Galaxy installation, it is imperative that the installation fitting be aligned correctly. Please follow the detailed instructions below. Concrete 800mm Locator Screws & Washers A 800mm D Lower Internal Stem 1.2m C Upper Internal Stem Acetal Ring 1.2m B Locator Screws & Washers C - In-Ground Fitting Stem Bolts A In-Ground Fitting Kit includes: A - Stem Bolts (6) B - Allen Wrench Footing The Galaxy In-Ground Fitting has six (6) tapped holes to accept six (6) stem bolts. STEP 1 Preparation Flare at The in-ground fitting needs concreting in the ground bottom per the diagram. The hole size recommended assumes800mm the terrain is thick clay. Should the terrain be fine soil or sand, the hole size should be increased. Make sure two TAPPED HOLES are lined up in the direction of the desired primary mast and boom position. You must align two TAPPED HOLES to achieve the desired position. STEP 2 Bolt Lower Internal Stem Once installed and the concrete has cured, bolt the lower internal stem to in-ground fitting using the six (6) stem bolts. Once attached, two COUNTERSUNK HOLES on the internal stem will line up in the direction of the primary mast and boom position. If in-ground fitting is not set using tapped holes for alignment, the internal stem will not line up properly. See diagram above. Make sure bolts are very tight. STEP 3 Bolt Upper Internal Stem Slide acetal ring over lower internal stem. Slide upper internal stem over lower internal stem. Bolt (4) locator screws and washers (included with umbrella) to lower stem. Refer to umbrella manual for further installation instructions. IMPORTANT: When concreting the in-ground fitting in place, make sure not to get slurry in the screw threads. Either apply tape over the holes on both sides of the fitting or place the stem bolts in the threads and withdraw them with the concrete is set. Make sure that the in-ground fitting is perfectly level. Allow the concrete to cure for the appropriate cure time for your area before installing the stem onto the fitting. 2 13401 Brooks Drive Baldwin Park, CA 91706 p 626.338.8810 f 626.338.8816 [email protected] shademakerusa.com © 2015 Shademaker. All rights reserved. SMOG-GMK-115
© Copyright 2024 ExpyDoc