PROPANE CONVERSION INSTRUCTIONS (INCLUDING HIGH ALTITUDE ADJUSTMENT) Applies to: Gas-Fired, Tubular Radiant, Low-Intensity Infrared Heater Models VPS, VPT, VCS, VCT Part no. 270686 VPS Conversion Step By Step VPS MODEL NUMBERS Conversion Kit Required 60 80 100 125 150 170 200 270619 270620 270621 270622 270623 270627 270628 Step Operation 1 Burner Orifice Replacement 2 Fit Turbulators 3 Fit Flame Plate 4 Replace Gas Orifice 5 Install Baffle Plate 6 Refit Burner Head SECTION 6 7 Convert Gas Valve SECTION 7a 8 Replace Air Pressure Switch NOT REQUIRED SECT 8a 9 Replace Fan Orifice SECTION 9a SECT 9b 10 Replace Data Badge SECTION 10 11 Re-commissioning SECTION 11/12 SECTION 1 SECTION 2 NOT REQUIRED SECTION 3 SECTION 4a SECTION 5 SECTION 4b NOT REQUIRED Please note: The LPG gas pressure must be reset according to the values in Section 12. 2 VPT, VCS, VCT Conversion Step By Step VPT, VCS, VCT MODEL NUMBERS 60 80 100 125 150 170 200 Conversion Kit Required VCS 270619 270620 270621 270622 270623 270627 270628 Conversion Kit Required VPT/VCT 270619 270620 270621 270622 270623 270626 270628 Step Operation 1 Burner Orifice Replacement 2 Fit Turbulators 3 Fit Flame Plate 4 Replace Gas Orifice 5 Install Baffle Plate 6 Refit Burner Head SECTION 6 7 Convert Gas SECTION 7b 8 Replace Air Pressure Switch 9 Replace Fan Orifice 10 Replace Data Badge SECTION 10 11 Re-commissioning SECTION 11/12 SECTION 1 SECTION 2 NOT REQUIRED SECTION 3 SECTION 4a SECTION 5 SECTION 4c NOT REQUIRED NOT REQUIRED SECT 9c NOT REQ SECTION 9c SECT 8b * SECT 9d * VCS 170 = SECTION 9c, VPT 170, VCT 170 SECT 9d Please note: The LPG gas pressure must be reset according to the values in Section 12. 3 VPS Model P R B Q H M S Part Code Description B Gas Valve H Gas orifice L Pressure Switch M Gaskets P Burner Orifice Plate Q Flame Plate Location (plate not shown) R Fan Orifice Plate S Baffle Plate Location (plate not shown) 4 L VPT, VCS/T Models Q R S P L H M B Not on VCS models Part Code Description B Gas Valve H Gas orifice L Pressure Switch M Gaskets P Burner Orifice Plate Q Flame Plate Location (plate not shown) R Fan Orifice Plate S Baffle Plate Location (plate not shown) 5 Section 1 Burner Orifice Plate Replacement (all models). Step 1: Remove the four retaining screws securing the burner casting using a no. 2 crosshead screwdriver. Step 4: The burner orifice plate can then be released by removing the 3 fixing screws from the burner tube using a No.2 crosshead screwdriver. Step 2: Remove the supporting casting and gasket. Step 5: retaining Remove the old plate. Step 3: The burner head assembly can now be disconnected by separating the connectors of the ignition and flame probe lead assemblies and removing the ground lead and pressure switch silicon tube. Step 6: Fit new propane burner orifice plate to burner tube ensuring the impulse stud is facing the correct direction. The cable grommet is fitted to the lower of the 3 holes at the bottom of the plate (arrowed). Two new gaskets are provided and should be used when reconnecting to the burner housing. Dispose of the old gaskets. Using a flathead screwdriver remove the washer securing the impulse stud (arrowed). the stud. Remove the cable grommet from orifice plate and attach to the replacement See Section 13 for correct burner orifice plate identification. Section 2 Turbulator Information. These heaters have a different arrangement of turbulators and tube inserts when operating on LPG. This section will guide you through the process of changing these components where necessary. 6 Step 1: Prior to conversion a number of the natural gas heaters use a tube insert Part No. 270489 (201688) See Figure 1. This is not required when operating on LPG, please check inside the firing leg. If fitted, remove and discard. Step 3: Align the 5 holes in the flame plate (arrowed) with the 5 holes on the outer edge of the burner head as shown. Figure 1: Tube Insert Length 5ꞌ (1524mm) Part No. 270489 (201688) Step 4: Attach flame plate to the burner tube using the 3 screws removed in step 1. Ensure the flame plate is mounted ON TOP of the original burner head. Step 2: If your heater is a 20’ long model, fit the turbulator Part No. 270495 (202422). See Figure 2. Flame Plate Identification (Note: This turbulator is already fitted to the 20’ VPT/ VCT heaters) 269960 Figure 2: Turbulator Length 4ꞌ 3" (1277mm) Part No. 270495 (202422) 269959 Section 3 Flame Plate Attachment (all models). Step 1: Remove the 3 screws holding the burner head in place with a no. 2 crosshead screwdriver. Step 2: Discard the spacer bracket arrowed below. 269958 269957 7 Section 4a Gas Orifice Replacement (60kBTU to 150kBTU models only). Step 1: Remove the burner casting as detailed in section 1. Step 2: Using a 12mm wrench remove the gas orifice from the jet carrier by rotating counter-clockwise. .Step 4: The manifold/gas orifice can now be detached from the gas valve. The two screws retaining the gas valve can then be removed. Step 3: Replace the gas orifice with the propane alternative ensuring an approved gas sealant is used on the thread. DO NOT OVERTIGHTEN. Step 5: Replace the manifold/gas orifice with the propane alternative ensuring an approved gas sealant is used on the thread. DO NOT OVERTIGHTEN. See Section 13 for gas orifice identification. See Section 13 for gas orifice identification. Section 4b Gas Orifice Replacement 200kBTU models only). (VPS 170kBTU to Step 1: Remove the burner casting as detailed in section 1. Step 2: Remove the two securing screws from the base of the manifold, noting the ground terminal connection. Step 3: Remove the four screws holding the rear burner plate in position (arrowed). Remove the rear plate. 8 Section 5 Section 4c Gas Orifice Replacement (VPT/VCS[T] 170kBTU to 200kBTU models only). Baffle Plate Installation (60kBTU to 100kBTU models only). Step 1: Remove the burner casting as detailed in section 1. Step 1: Locate the baffle plate in the LP conversion kit. Step 2: Remove the two securing screws from the base of the orifice manifold, noting ground terminal connection. Step 2: Carefully insert the baffle plate at an angle through the combustion chamber opening, making sure that the holes are positioned towards the holes at the front of the burner box. For VC burners there will already be 2 screws located in these holes. Remove these screws before proceeding. Step 3: Remove the four screws securing the base plate and remove. Step 4: Remove the gas valve wiring connections, noting their positions. Step 5: Remove the four screws (arrowed) securing the gas valve inlet plate to the burner housing and remove plate. Remove gas valve rearwards. Step 3: Align the holes and screw the baffle plate to the burner box using the self tapping screws supplied. Step 6: The jet manifold/gas orifice can now be detached from the gas valve. Step 7: Replace the jet manifold/gas orifice with the propane alternative ensuring an approved gas sealant is used on the thread. DO NOT OVERTIGHTEN. 9 Section 7a Section 6 Refitting Burner Head (all models). Gas Valve LP Conversion (VPS). Step 1: Reconnect the ignition and flame probe leads, the ground lead and pressure switch silicon tube. Take care to pass the leads and silicone tube through the gasket. New gaskets are provided. The old gaskets should be disposed of accordingly. Step 1: To gain access to the gas valve loosen screw in burner lid and open the right hand burner access door. Step 2: Remove the gas valve regulator cover screw (brass). Step 3: Remove the adjustment screw (white) beneath cover screw. Step 4: Remove natural gas regulator spring (color-coded silver/plain) from regulator sleeve. Step 2: Locate the burner head assembly over the gas orifice ensuring the leads do not get pinched between the orifice plate and burner housing. Step 5: Insert the LP regulator spring (provided in the conversion kit and color-coded white) into the regulator sleeve. Step 6: Replace the regulator adjustment screw and adjust approximately 8 turns clockwise from the beginning of the thread. Step 3: Refit the gasket and casting over the burner head tube and fix with the original screws. Step 7: Adjust gas pressure as detailed in Section 11a or 11b. Step 8: Replace regulator cover screw. Step 9: Attach warning label to outside of burner housing where it can be readily seen. Step 10: Fit small round LP label to the top of the converted gas valve cover screw. 10 Section 7b Gas Valve LP Conversion (VPT, VCS/T). VPT / VCT burners have a two-stage gas valve. VCS burners have a single stage gas valve. Step 1: To gain access to the gas valve, remove the 4 screws securing the bottom access panel with a no. 2 crosshead screwdriver. Remove panel. Step 5: Insert the LP regulator spring(s) (provided in the conversion kit and color-coded white) into the regulator sleeve(s). Step 6: Replace the regulator adjustment screw(s) and adjust approximately 8 turns clockwise from the beginning of the thread. Step 7: Adjust gas pressure as detailed in Section 11a or 11b. Step 2: Remove the gas valve regulator cover screw(s) (brass). Step 8: Replace regulator cover screw. Step 3: Remove the adjustment screw(s) (white) beneath cover screw/screws. Step 9: Attach warning label to outside of burner housing where it can be readily seen. Step 4: Remove the natural gas regulator spring(s) (color-coded silver/plain) from regulator sleeve(s). Step 10: Fit small round LP label to the top of the converted gas valve cover screw. 11 Step 4: Fit the new air pressure switch (with red label), ensuring the cables and terminal cap are installed correctly and the silicon tubes are connected as shown below. Section 8a Air Pressure Switch Replacement (200kBTU VPS). Step 5: Close access door and tighten screw in burner lid. Step 1: To gain access to the pressure switch loosen screw in burner lid and open left hand access door. The pressure switch has a brown label. Section 8b Air Pressure Switch Replacement (200kBTU VPT, VCS/VCT). Step 2: Disconnect the silicone tubes, cables and terminal cap from the pressure switch. Step 1: The pressure switch can be accessed by removing the top panel at the rear of the burner. This is secured by 4 screws. Step 3: Remove the two screws arrowed below. Step 2: Disconnect the silicone tubes, cables and terminal cap from the pressure switch. 12 Step 3: Remove the two electrical chassis retaining screws (arrowed). Step 4: The air pressure switch can now be removed by unscrewing from the back plate. Step 2: Fit the replacement fan orifice plate. Re-attach the 3 x 8mm nuts (arrowed) turning clockwise, using the wrench to secure to the combustion fan. It may be necessary to partially disconnect the chassis wiring to access the pressure switch mounting screws at the rear. Take care not to cross thread the fasteners. See Section 13 Table 1 for correct fan orifice plate identification. Step 5: Fit the new air pressure switch (with a red label) ensuring the cables and terminal cap are installed correctly and the silicon tubes are connected as shown below. For high altitude conversion see Section 12 for correct high altitude fan orifice plate identification. Section 9b Fan Orifice Plate Replacement (4 screws VPS). Step 1: Using a No.2 crosshead screwdriver remove the four screws (arrowed) securing the fan orifice plate. Remove plate. Step 6: Close access door and replace the fixing screws. Section 9a Fan Orifice Plate Replacement (3 screws VPS). Step 1: Remove the 3 off 8mm nuts (arrowed) securing the fan orifice plate with an 8mm wrench. Slide orifice plate off the 3 protruding studs. Step 2: Fit the replacement fan orifice plate and secure with the same four screws. See Section 13 Table 2 for correct fan orifice plate identification. Take care not to cross thread the screws. 13 Section 9d Section 9c Fan Orifice Plate Replacement (3 screws VPT, VCS/ VCT). Fan Orifice Plate Replacement (4 screws VPT, VCS/ VCT). Step 1: Remove the top cover of the burner using a no.2 crosshead screwdriver to expose the combustion fan. Step 1: Remove fan following procedure in Section 8c. Step 2: Follow procedure in Section 8b to change the fan orifice plate. See Section 13 Table 4 for correct fan orifice plate identification. Step 3: Refit the fan and cover. Section 10 Data Badge Replacement (all models). Ensure the single stage LP conversion label is used on VPS/VCS burners and the two-stage LP conversion label is used when converting VPT/VCT burners. Step 1: Locate the LP conversion data label. Step 2: Remove the four screws (arrowed), three of which can not be seen in the photograph. Lift out the fan assembly to access the fan. Step 2: Indicate the altitude setting of the appliance by placing an ‘X’ in the appropriate box highlighted below. Step 3: Affix new label over the technical data section of the natural gas data label as shown below. Step 3: Follow the procedure in Section 8a to change the fan orifice plate. See Section 13 Table 3 for correct fan orifice plate identification. Step 4: Refit the fan and cover. 14 Section 11 Re-commissioning (all models). Check installation has been carried out to these instructions. Replace burner on tube and secure. Reconnect gas hose. Open manual valve. Check soundness. Open control housing and check that all components are securely fastened. Check thermostat is set to maximum and is calling for heat. Switch on electrical supply. The red neon should now be illuminated. If restarting heater a delay of 15sec should be allowed. Turn off power and check that all components are securely fastened. The heater should now run through its start up sequence and ignite. NO A successful ignition is indicated by the amber light illuminating and remaining illuminated. Has the burner lit? YES Check operation on flame failure. Check gas pressure. Set gas pressure. (refer to Section 12a or 12b) Leave these instructions with a responsible person. Close control housing. Check operation of air pressure switch. Once gas outlet pressure has been set, replace gas valve regulator cover screw(s) and attach round LP label/labels to the top of the regulator cover screw(s). 15 Section 12a Orifice Pressure Adjustment (VPS/VCS). USA LP Gas 0- 2000 ft (0-610m) CANADA LP Gas 0- 2000 ft (0-610m) Size 60 Size 60 “WC 6.0 5.2 8.2 “WC 6.0 5.2 8.2 USA LP Gas 2001– 4000 ft (611-1220m) CANADA LP Gas 2001– 4500 ft (611-1371m) Size 60 200 Size 60 “WC 5.8 5.0 8.0 N/A “WC 5.8 5.0 8.0 USA LP Gas 4001– 6000 ft (1220-1829m) Size 60 “WC 5.7 4.9 7.9 USA LP Gas 6001– 10000 ft (1830-3048m) Size 60 “WC 5.6 4.8 7.7 80 100 125 150 170 200** 6.6 7.0 5.7 80 100 125 150 170* 6.4 6.8 6.8 80 100 125 150 170* 6.3 6.7 6.7 80 100 125 150 170* 6.1 6.3 6.3 5.7 200 N/A 200 N/A * De-rated from 169kBTU to 150kBTU. ** De-rated from 200kBTU to 169kBTU, not suitable for high altitude. 16 80 100 125 150 170 6.6 7.0 5.7 80 100 125 150 170* 6.4 6.8 6.8 200** 5.7 200 N/A Section 12b Orifice Pressure Adjustment (VPT/VCT). USA LP Gas 0- 2000 ft (0-610m) CANADA LP Gas 0– 2000 ft (0-610m) Size 60 Size 60 “WC Hi 6.1 5.2 8.2 7.6 7.2 6.8 6.8 “WC Hi 6.1 5.2 8.2 7.6 7.2 6.8 6.8 “WC Lo 3.5 3.0 3.7 4.4 3.3 3.9 3.9 “WC Lo 3.5 3.0 3.7 4.4 3.3 3.9 3.9 USA LP Gas 2001– 4000 ft (611-1220m) CANADA LP Gas 2001– 4500 ft (611-1371m) Size 60 Size 60 “WC Hi 6.0 5.0 8.0 7.4 7.0 N/A “WC Hi 6.0 5.0 8.0 7.4 7.0 N/A “WC Lo 3.4 2.9 3.5 4.2 3.1 N/A “WC Lo 3.4 2.9 3.5 4.2 3.1 N/A USA LP Gas 4001– 6000 ft (1220-1829m) Size 60 “WC Hi 5.9 4.9 7.9 7.3 6.9 N/A “WC Lo 3.3 2.8 3.4 4.1 3.0 N/A USA LP Gas 6001– 10000 ft (1830-3048m) Size 60 “WC Hi 5.7 4.8 7.7 7.1 6.5 N/A “WC Lo 3.1 2.6 3.2 3.9 2.8 N/A 80 100 125 150 170*** 200** 80 100 125 150 170 200 80 100 125 150 170 80 100 125 150 200 170 200 *** Not suitable for high altitude. ** De-rated from 200kBTU to 169kBTU, not suitable for high altitude. 17 80 100 125 150 170*** 80 100 125 150 170 200** 200 Section 13 Propane Conversion Kit Parts List/Technical Data REZNOR KIT PART NUMBER 270619 Part No. Quantity Description 270686 1 Propane Conversion Manual VC / VP 270412 1 Grommet 12.5 x 9.5mm 270459 1 M6 retaining washer 270653 2 Propane Data Conversion Label for VP1P18 / VC1P18 270654 2 Propane Data Conversion Label for VP2P18 / VC2P18 270374 1 Gas Valve Propane Conversion Kit 269948 1 Burner orifice plate 270366 2 3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive) 269957 1 Flame Plate Type 1 270398 1 Std. multi hole gas orifice 1.1mm 270328 1 Baffle Plate For Vision Burners 270414 2 No. 8 x 1/2" Stainless Steel Pozi Pan Self Tapper 269925 1 Blown fan orifice plate to suit 2576T, 10 x 10mm sq. 269924 1 Blown fan orifice plate to suit 2576T, 9 x 10mm sq. 269928 1 Blown fan orifice plate to suit 2576T, 12 x 10mm sq. REZNOR KIT PART NUMBER 270620 Part No. Quantity Description 270686 1 Propane Conversion Manual VC / VP 270412 1 Grommet 12.5 x 9.5mm 270459 1 M6 retaining washer 270655 2 Propane Data Conversion Label for VP1P25 / VC1P25 270656 2 Propane Data Conversion Label for VP2P25 / VC2P25 270374 1 Gas Valve Propane Conversion Kit 269949 1 Burner orifice plate 270366 2 3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive) 269958 1 Flame Plate Type 2 270399 1 Std. multi hole gas orifice 1.3mm 270328 1 Baffle Plate For Vision Burners 270414 2 No. 8 x 1/2" Stainless Steel Pozi Pan Self Tapper 269925 1 Blown fan orifice plate to suit 2576T, 10 x 10mm sq. 269928 1 Blown fan orifice plate to suit 2576T, 12 x 10mm sq. 18 Propane Conversion Kit Parts List. REZNOR KIT PART NUMBER 270621 Part No. Quantity Description 270686 1 Propane Conversion Manual VC / VP 270412 1 Grommet 12.5 x 9.5mm 270459 1 M6 retaining washer 270657 2 Propane Data Conversion Label for VP1P30 / VC1P30 270658 2 Propane Data Conversion Label for VP2P30 / VC2P30 270374 1 Gas Valve Propane Conversion Kit 269950 1 Burner orifice plate 270366 2 3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive) 269958 1 Flame Plate Type 2 270399 1 Std. multi hole gas orifice 1.3mm 270328 1 Baffle Plate For Vision Burners 270414 2 No. 8 x 1/2" Stainless Steel Pozi Pan Self Tapper 269928 1 Blown fan orifice plate to suit 2576T, 12 x 10mm sq. 269930 1 Blown fan orifice plate to suit 2576T, 15 x 10mm sq. REZNOR KIT PART NUMBER 270622 Part No. Quantity Description 270686 1 Propane Conversion Manual VC / VP 270412 1 Grommet 12.5 x 9.5mm 270459 1 M6 retaining washer 270659 2 Propane Data Conversion Label for VP1P38 / VC1P38 270660 2 Propane Data Conversion Label for VP2P38 / VC2P38 270374 1 Gas Valve Propane Conversion Kit 269951 1 Burner orifice plate 270366 2 3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive) 269959 1 Flame Plate Type 3 270400 1 Std. multi hole gas orifice 1.5mm 269931 1 Blown fan orifice plate to suit 2576T, 18 x 10mm sq. 269932 1 Blown fan orifice plate to suit 2576T, 21 x 10mm sq. 19 Propane Conversion Kit Parts List. REZNOR KIT PART NUMBER 270623 Part No. Quantity Description 270686 1 Propane Conversion Manual VC / VP 270412 1 Grommet 12.5 x 9.5mm 270459 1 M6 retaining washer 270661 2 Propane Data Conversion Label for VP1P45 / VC1P45 270662 2 Propane Data Conversion Label for VP2P45 / VC2P45 270374 1 Gas Valve Propane Conversion Kit 269952 1 Burner orifice plate 270366 2 3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive) 269959 1 Flame Plate Type 3 270401 1 Std. multi hole gas orifice 1.7mm 269933 1 Blown fan orifice plate to suit 2576T, 26 x 10mm sq. 269934 1 Blown fan orifice plate to suit 2576T, 37 x 10mm sq. REZNOR KIT PART NUMBER 270626 Part No. Quantity Description 270686 1 Propane Conversion Manual VC / VP 270412 1 Grommet 12.5 x 9.5mm 270459 1 M6 retaining washer 270664 2 Propane Data Conversion Label for VP2P50 / VC2P50 270374 1 Gas Valve Propane Conversion Kit 269953 1 Burner orifice plate 270366 2 3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive) 269960 1 Flame Plate Type 4 270403 1 Std. multi hole gas orifice 1.9mm 269936 1 Blown fan orifice plate to suit 2560-1, 14 x 10mm sq. 270375 1 1/2" NPT Standard Jet Carrier 20 Propane Conversion Kit Parts List. REZNOR KIT PART NUMBER 270627 Part No. Quantity Description 270686 1 Propane Conversion Manual VC / VP 270412 1 Grommet 12.5 x 9.5mm 270459 1 M6 retaining washer 270661 2 Propane Data Conversion Label for VP1P45 / VC1P45 270374 1 Gas Valve Propane Conversion Kit 269952 1 Burner orifice plate 270366 2 3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive) 269959 1 Flame Plate Type 3 270401 1 Std. multi hole gas orifice 1.7mm 269933 1 Blown fan orifice plate to suit 2576T, 26 x 10mm sq. 269934 1 Blown fan orifice plate to suit 2576T, 37 x 10mm sq. 270375 1 1/2" NPT Standard Jet Carrier REZNOR KIT PART NUMBER 270628 Part No. Quantity Description 270686 1 Propane Conversion Manual VC / VP 270412 1 Grommet 12.5 x 9.5mm 270459 1 M6 retaining washer 270663 2 Propane Data Conversion Label for VP1P50 / VC1P50 270664 2 Propane Data Conversion Label for VP2P50 / VC2P50 270374 1 Gas Valve Propane Conversion Kit 269953 1 Burner orifice plate 270366 2 3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive) 269960 1 Flame Plate Type 4 270403 1 Std. multi hole gas orifice 1.9mm 269937 1 Blown fan orifice plate to suit 2560-1, 15 x 10mm sq. 269936 1 Blown fan orifice plate to suit 2560-1, 14 x 10mm sq. 270375 1 1/2" NPT Standard Jet Carrier 270442 2 Huba Pressure Switch Zinc Plated Fixing Screw 270386 1 Huba pressure switch, trip 77-87Pa / reset =<98Pa, with red label 21 Conversion Kit Part Conversion Kit Part Natural Gas Model Number (VPS/VCS) Number (VPT/VCT) LP Gas Model/BTU per hour AFTER CONVERSION High Altitude LP Conversion Available 60 270619 270619 18/60,000 YES 80 270620 270620 25/80,000 YES 100 270621 270621 30/100,000 YES 125 270622 270622 38/125,000 YES 150 270623 270623 45/150,000 YES 170 270627 270626 VPS/VCS 45/150,000 VPS/VCS ONLY 200 270628 270628 50/169,000 NO These instructions must be used in conjunction with the standard heater installation manual. These are generic conversion kits for each rating. Any extra components that come with the conversion kit need to be disposed of accordingly. 22 TABLE 1 VPS/VCS LP Gas 0-2000 ft (0-610m) Size 60 80 100 125 150 170* 200** Fan Orifice 269925 269925 269928 269931 269933 269937 269937 Part No. Quantity 10 10 12 18 26 26 15 10mm Holes TABLE 2 VPS/VCS LP Gas 2001ft + (611m +) Size 60 80 100 125 150 170* 200 Fan Orifice 269928 269928 269930 269932 269934 269934 Part No. Quantity 12 12 15 21 37 37 10mm Holes N/A N/A * De-rated from 169kBTU to 150kBTU. ** De-rated from 200kBTU to 169kBTU. TABLE 3 VPT/VCT LP Gas 0-2000 ft (0-610m) Size 60 80 100 125 150 170*** 200** Fan Orifice 269924 269925 269928 269931 269933 269936 269936 Part No. Quantity 9 10+ 12 18 26 14 14 10mm Holes TABLE 4 VPT/VCT LP Gas 2001ft + (611m +) Size 60 80 100 125 150 Fan Orifice 269928 269928 269930 269932 269934 Part No. Quantity 12 12 15 21 37 10mm Holes + No fan orifice plate change required. *** Not suitable for high altitude. ** De-rated from 200kBTU to 169kBTU. 23 170 200 N/A N/A Specifications & illustrations subject to change without notice or incurring obligations. ©2014 All rights reserved. All marks are the property of their respective organizations. O’Fallon, MO | Printed in U.S.A. (09/14) 245E-0914 CP-VC/VP-GC 24
© Copyright 2024 ExpyDoc