Download File

PROPANE CONVERSION INSTRUCTIONS
(INCLUDING HIGH ALTITUDE ADJUSTMENT)
Applies to: Gas-Fired, Tubular Radiant,
Low-Intensity Infrared Heater
Models VPS, VPT, VCS, VCT
Part no. 270686
VPS Conversion Step By Step
VPS MODEL NUMBERS
Conversion Kit Required
60
80
100
125
150
170
200
270619
270620
270621
270622
270623
270627
270628
Step
Operation
1
Burner Orifice
Replacement
2
Fit Turbulators
3
Fit Flame Plate
4
Replace Gas
Orifice
5
Install Baffle Plate
6
Refit Burner Head
SECTION 6
7
Convert Gas
Valve
SECTION 7a
8
Replace Air
Pressure Switch
NOT REQUIRED
SECT 8a
9
Replace Fan
Orifice
SECTION 9a
SECT 9b
10
Replace Data
Badge
SECTION 10
11
Re-commissioning
SECTION 11/12
SECTION 1
SECTION 2
NOT REQUIRED
SECTION 3
SECTION 4a
SECTION 5
SECTION 4b
NOT REQUIRED
Please note: The LPG gas pressure must be reset according to the values in Section 12.
2
VPT, VCS, VCT Conversion Step By Step
VPT, VCS, VCT MODEL NUMBERS
60
80
100
125
150
170
200
Conversion Kit Required
VCS
270619
270620
270621
270622
270623
270627
270628
Conversion Kit Required
VPT/VCT
270619
270620
270621
270622
270623
270626
270628
Step
Operation
1
Burner Orifice
Replacement
2
Fit Turbulators
3
Fit Flame Plate
4
Replace Gas
Orifice
5
Install Baffle Plate
6
Refit Burner Head
SECTION 6
7
Convert Gas
SECTION 7b
8
Replace Air
Pressure Switch
9
Replace Fan
Orifice
10
Replace Data
Badge
SECTION 10
11
Re-commissioning
SECTION 11/12
SECTION 1
SECTION 2
NOT REQUIRED
SECTION 3
SECTION 4a
SECTION 5
SECTION 4c
NOT REQUIRED
NOT REQUIRED
SECT
9c
NOT
REQ
SECTION 9c
SECT 8b
*
SECT 9d
* VCS 170 = SECTION 9c, VPT 170, VCT 170 SECT 9d
Please note: The LPG gas pressure must be reset according to the values in Section 12.
3
VPS Model
P
R
B
Q
H
M
S
Part Code
Description
B
Gas Valve
H
Gas orifice
L
Pressure Switch
M
Gaskets
P
Burner Orifice Plate
Q
Flame Plate Location (plate not shown)
R
Fan Orifice Plate
S
Baffle Plate Location (plate not shown)
4
L
VPT, VCS/T Models
Q
R
S
P
L
H
M
B
Not on VCS models
Part Code
Description
B
Gas Valve
H
Gas orifice
L
Pressure Switch
M
Gaskets
P
Burner Orifice Plate
Q
Flame Plate Location (plate not shown)
R
Fan Orifice Plate
S
Baffle Plate Location (plate not shown)
5
Section 1
Burner Orifice Plate Replacement (all models).
Step 1: Remove the four retaining screws securing
the burner casting using a no. 2 crosshead
screwdriver.
Step 4: The burner orifice plate can then be released
by removing the 3 fixing screws from the burner tube
using a No.2 crosshead screwdriver.
Step 2: Remove the supporting casting and gasket.
Step 5:
retaining
Remove
the old
plate.
Step 3: The burner head assembly can now be
disconnected by separating the connectors of the
ignition and flame probe lead assemblies and
removing the ground lead and pressure switch silicon
tube.
Step 6: Fit new propane burner orifice plate to burner
tube ensuring the impulse stud is facing the correct
direction. The cable grommet is fitted to the lower of
the 3 holes at the bottom of the plate (arrowed). Two
new gaskets are provided and should be used when
reconnecting to the burner housing. Dispose of the old
gaskets.
Using a flathead screwdriver remove the
washer securing the impulse stud (arrowed).
the stud. Remove the cable grommet from
orifice plate and attach to the replacement
See Section 13 for correct burner orifice plate
identification.
Section 2
Turbulator Information.
These heaters have a different arrangement of
turbulators and tube inserts when operating on LPG.
This section will guide you through the process of
changing these components where necessary.
6
Step 1: Prior to conversion a number of the natural
gas heaters use a tube insert Part No. 270489
(201688) See Figure 1.
This is not required when operating on LPG, please
check inside the firing leg. If fitted, remove and
discard.
Step 3: Align the 5 holes in the flame plate (arrowed)
with the 5 holes on the outer edge of the burner
head as shown.
Figure 1: Tube Insert
Length 5ꞌ (1524mm)
Part No. 270489 (201688)
Step 4: Attach flame plate to the burner tube using
the 3 screws removed in step 1. Ensure the flame
plate is mounted ON TOP of the original burner
head.
Step 2: If your heater is a 20’ long model, fit the
turbulator Part No. 270495 (202422). See Figure 2.
Flame Plate Identification
(Note: This turbulator is already fitted to the 20’ VPT/
VCT heaters)
269960
Figure 2: Turbulator
Length 4ꞌ 3" (1277mm)
Part No. 270495 (202422)
269959
Section 3
Flame Plate Attachment (all models).
Step 1: Remove the 3 screws holding the burner head
in place with a no. 2 crosshead screwdriver.
Step 2: Discard the spacer bracket arrowed below.
269958
269957
7
Section 4a
Gas Orifice Replacement (60kBTU to 150kBTU
models only).
Step 1: Remove the burner casting as detailed in
section 1.
Step 2: Using a 12mm wrench remove the gas
orifice
from
the
jet
carrier
by
rotating
counter-clockwise.
.Step 4: The manifold/gas orifice can now be
detached from the gas valve. The two screws
retaining the gas valve can then be removed.
Step 3: Replace the gas orifice with the propane
alternative ensuring an approved gas sealant is used
on the thread. DO NOT OVERTIGHTEN.
Step 5: Replace the manifold/gas orifice with the
propane alternative ensuring an approved gas
sealant is used on the thread. DO NOT
OVERTIGHTEN.
See Section 13 for gas orifice identification.
See Section 13 for gas orifice identification.
Section 4b
Gas Orifice Replacement
200kBTU models only).
(VPS
170kBTU
to
Step 1: Remove the burner casting as detailed in
section 1.
Step 2: Remove the two securing screws from the
base of the manifold, noting the ground terminal
connection.
Step 3: Remove the four screws holding the rear
burner plate in position (arrowed). Remove the rear
plate.
8
Section 5
Section 4c
Gas Orifice Replacement (VPT/VCS[T] 170kBTU
to 200kBTU models only).
Baffle Plate Installation (60kBTU to 100kBTU
models only).
Step 1: Remove the burner casting as detailed in
section 1.
Step 1: Locate the baffle plate in the LP conversion
kit.
Step 2: Remove the two securing screws from the
base of the orifice manifold, noting ground terminal
connection.
Step 2: Carefully insert the baffle plate at an angle
through the combustion chamber opening, making
sure that the holes are positioned towards the holes
at the front of the burner box.
For VC burners there will already be 2 screws
located in these holes. Remove these screws before
proceeding.
Step 3: Remove the four screws securing the base
plate and remove.
Step 4: Remove the gas valve wiring connections,
noting their positions.
Step 5: Remove the four screws (arrowed) securing
the gas valve inlet plate to the burner housing and
remove plate. Remove gas valve rearwards.
Step 3: Align the holes and screw the baffle plate to
the burner box using the self tapping screws supplied.
Step 6: The jet manifold/gas orifice can now be
detached from the gas valve.
Step 7: Replace the jet manifold/gas orifice with the
propane alternative ensuring an approved gas
sealant is used on the thread.
DO NOT OVERTIGHTEN.
9
Section 7a
Section 6
Refitting Burner Head (all models).
Gas Valve LP Conversion (VPS).
Step 1: Reconnect the ignition and flame probe leads,
the ground lead and pressure switch silicon tube. Take
care to pass the leads and silicone tube through the
gasket. New gaskets are provided. The old gaskets
should be disposed of accordingly.
Step 1: To gain access to the gas valve loosen screw
in burner lid and open the right hand burner access
door.
Step 2: Remove the gas valve regulator cover screw
(brass).
Step 3: Remove the adjustment screw (white)
beneath cover screw.
Step 4: Remove natural gas regulator spring
(color-coded silver/plain) from regulator sleeve.
Step 2: Locate the burner head assembly over the
gas orifice ensuring the leads do not get pinched
between the orifice plate and burner housing.
Step 5: Insert the LP regulator spring (provided in the
conversion kit and color-coded white) into the
regulator sleeve.
Step 6: Replace the regulator adjustment screw and
adjust approximately 8 turns clockwise from the
beginning of the thread.
Step 3: Refit the gasket and casting over the burner
head tube and fix with the original screws.
Step 7: Adjust gas pressure as detailed in Section
11a or 11b.
Step 8: Replace regulator cover screw.
Step 9: Attach warning label to outside of burner
housing where it can be readily seen.
Step 10: Fit small round LP label to the top of the
converted gas valve cover screw.
10
Section 7b
Gas Valve LP Conversion (VPT, VCS/T).
VPT / VCT burners have a two-stage gas valve.
VCS burners have a single stage gas valve.
Step 1: To gain access to the gas valve, remove the 4
screws securing the bottom access panel with a no. 2
crosshead screwdriver. Remove panel.
Step 5: Insert the LP regulator spring(s) (provided in
the conversion kit and color-coded white) into the
regulator sleeve(s).
Step 6: Replace the regulator adjustment screw(s)
and adjust approximately 8 turns clockwise from the
beginning of the thread.
Step 7: Adjust gas pressure as detailed in Section
11a or 11b.
Step 2: Remove the gas valve regulator cover
screw(s) (brass).
Step 8: Replace regulator cover screw.
Step 3: Remove the adjustment screw(s) (white)
beneath cover screw/screws.
Step 9: Attach warning label to outside of burner
housing where it can be readily seen.
Step 4: Remove the natural gas regulator spring(s)
(color-coded silver/plain) from regulator sleeve(s).
Step 10: Fit small round LP label to the top of the
converted gas valve cover screw.
11
Step 4: Fit the new air pressure switch (with red
label), ensuring the cables and terminal cap are
installed correctly and the silicon tubes are connected
as shown below.
Section 8a
Air Pressure Switch Replacement (200kBTU VPS).
Step 5: Close access door and tighten screw in
burner lid.
Step 1: To gain access to the pressure switch loosen
screw in burner lid and open left hand access door.
The pressure switch has a brown label.
Section 8b
Air Pressure Switch Replacement (200kBTU VPT,
VCS/VCT).
Step 2: Disconnect the silicone tubes, cables and
terminal cap from the pressure switch.
Step 1: The pressure switch can be accessed by
removing the top panel at the rear of the burner. This
is secured by 4 screws.
Step 3: Remove the two screws arrowed below.
Step 2: Disconnect the silicone tubes, cables and
terminal cap from the pressure switch.
12
Step 3: Remove the two electrical chassis retaining
screws (arrowed).
Step 4: The air pressure switch can now be removed
by unscrewing from the back plate.
Step 2: Fit the replacement fan orifice plate. Re-attach
the 3 x 8mm nuts (arrowed) turning clockwise, using
the wrench to secure to the combustion fan.
It may be necessary to partially disconnect the chassis
wiring to access the pressure switch mounting screws
at the rear.
Take care not to cross thread the fasteners.
See Section 13 Table 1 for correct fan orifice
plate identification.
Step 5: Fit the new air pressure switch (with a red
label) ensuring the cables and terminal cap are
installed correctly and the silicon tubes are connected
as shown below.
For high altitude conversion see Section 12 for
correct high altitude fan orifice plate identification.
Section 9b
Fan Orifice Plate Replacement (4 screws VPS).
Step 1: Using a No.2 crosshead screwdriver remove
the four screws (arrowed) securing the fan orifice plate.
Remove plate.
Step 6: Close access door and replace the fixing
screws.
Section 9a
Fan Orifice Plate Replacement (3 screws VPS).
Step 1: Remove the 3 off 8mm nuts (arrowed) securing
the fan orifice plate with an 8mm wrench. Slide orifice
plate off the 3 protruding studs.
Step 2: Fit the replacement fan orifice plate and
secure with the same four screws.
See Section 13 Table 2 for correct fan orifice
plate identification.
Take care not to cross thread the screws.
13
Section 9d
Section 9c
Fan Orifice Plate Replacement (3 screws VPT, VCS/
VCT).
Fan Orifice Plate Replacement (4 screws VPT, VCS/
VCT).
Step 1: Remove the top cover of the burner using a no.2
crosshead screwdriver to expose the combustion fan.
Step 1: Remove fan following procedure in Section 8c.
Step 2: Follow procedure in Section 8b to change the
fan orifice plate.
See Section 13 Table 4 for correct fan orifice
plate identification.
Step 3: Refit the fan and cover.
Section 10
Data Badge Replacement (all models).
Ensure the single stage LP conversion label is
used on VPS/VCS burners and the two-stage LP
conversion label is used when converting VPT/VCT
burners.
Step 1: Locate the LP conversion data label.
Step 2: Remove the four screws (arrowed), three of
which can not be seen in the photograph. Lift out the
fan assembly to access the fan.
Step 2: Indicate the altitude setting of the appliance by
placing an ‘X’ in the appropriate box highlighted below.
Step 3: Affix new label over the technical data section
of the natural gas data label as shown below.
Step 3: Follow the procedure in Section 8a to change
the fan orifice plate.
See Section 13 Table 3 for correct fan orifice
plate identification.
Step 4: Refit the fan and cover.
14
Section 11
Re-commissioning (all models).
Check installation has been
carried out to these instructions.
Replace burner on tube
and secure.
Reconnect gas hose. Open manual valve.
Check soundness.
Open control housing and check that
all components are securely fastened.
Check thermostat is set to
maximum and is calling for heat.
Switch on electrical supply. The red
neon should now be illuminated. If
restarting heater a delay of 15sec
should be allowed.
Turn off power and check
that all components are
securely fastened.
The heater should now
run through its start up
sequence and ignite.
NO
A successful ignition is indicated
by the amber light illuminating
and remaining illuminated.
Has the
burner lit?
YES
Check operation on flame failure.
Check gas pressure.
Set gas pressure.
(refer to Section 12a or 12b)
Leave these instructions
with a responsible person.
Close control housing.
Check operation of
air pressure switch.
Once gas outlet pressure has been set, replace gas valve regulator cover screw(s) and attach
round LP label/labels to the top of the regulator cover screw(s).
15
Section 12a
Orifice Pressure Adjustment (VPS/VCS).
USA
LP Gas 0- 2000 ft (0-610m)
CANADA LP Gas 0- 2000 ft (0-610m)
Size
60
Size
60
“WC
6.0 5.2 8.2
“WC
6.0 5.2 8.2
USA
LP Gas 2001– 4000 ft (611-1220m)
CANADA LP Gas 2001– 4500 ft (611-1371m)
Size
60
200
Size
60
“WC
5.8 5.0 8.0
N/A
“WC
5.8 5.0 8.0
USA
LP Gas 4001– 6000 ft (1220-1829m)
Size
60
“WC
5.7 4.9 7.9
USA
LP Gas 6001– 10000 ft (1830-3048m)
Size
60
“WC
5.6 4.8 7.7
80 100 125 150 170 200**
6.6
7.0
5.7
80 100 125 150 170*
6.4
6.8
6.8
80 100 125 150 170*
6.3
6.7
6.7
80 100 125 150 170*
6.1
6.3
6.3
5.7
200
N/A
200
N/A
* De-rated from 169kBTU to 150kBTU.
** De-rated from 200kBTU to 169kBTU, not suitable for high altitude.
16
80 100 125 150 170
6.6
7.0
5.7
80 100 125 150 170*
6.4
6.8
6.8
200**
5.7
200
N/A
Section 12b
Orifice Pressure Adjustment (VPT/VCT).
USA
LP Gas 0- 2000 ft (0-610m)
CANADA LP Gas 0– 2000 ft (0-610m)
Size
60
Size
60
“WC Hi
6.1 5.2 8.2
7.6
7.2
6.8
6.8
“WC Hi
6.1 5.2 8.2
7.6
7.2
6.8
6.8
“WC Lo
3.5 3.0 3.7
4.4
3.3
3.9
3.9
“WC Lo
3.5 3.0 3.7
4.4
3.3
3.9
3.9
USA
LP Gas 2001– 4000 ft (611-1220m)
CANADA LP Gas 2001– 4500 ft (611-1371m)
Size
60
Size
60
“WC Hi
6.0 5.0 8.0
7.4
7.0
N/A
“WC Hi
6.0 5.0 8.0
7.4
7.0
N/A
“WC Lo
3.4 2.9 3.5
4.2
3.1
N/A
“WC Lo
3.4 2.9 3.5
4.2
3.1
N/A
USA
LP Gas 4001– 6000 ft (1220-1829m)
Size
60
“WC Hi
5.9 4.9 7.9
7.3
6.9
N/A
“WC Lo
3.3 2.8 3.4
4.1
3.0
N/A
USA
LP Gas 6001– 10000 ft (1830-3048m)
Size
60
“WC Hi
5.7 4.8 7.7
7.1
6.5
N/A
“WC Lo
3.1 2.6 3.2
3.9
2.8
N/A
80 100 125 150 170*** 200**
80 100 125 150 170
200
80 100 125 150 170
80 100 125 150
200
170
200
*** Not suitable for high altitude.
** De-rated from 200kBTU to 169kBTU, not suitable for high altitude.
17
80 100 125 150 170***
80 100 125 150 170
200**
200
Section 13
Propane Conversion Kit Parts List/Technical Data
REZNOR KIT PART NUMBER 270619
Part No.
Quantity
Description
270686
1
Propane Conversion Manual VC / VP
270412
1
Grommet 12.5 x 9.5mm
270459
1
M6 retaining washer
270653
2
Propane Data Conversion Label for VP1P18 / VC1P18
270654
2
Propane Data Conversion Label for VP2P18 / VC2P18
270374
1
Gas Valve Propane Conversion Kit
269948
1
Burner orifice plate
270366
2
3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive)
269957
1
Flame Plate Type 1
270398
1
Std. multi hole gas orifice 1.1mm
270328
1
Baffle Plate For Vision Burners
270414
2
No. 8 x 1/2" Stainless Steel Pozi Pan Self Tapper
269925
1
Blown fan orifice plate to suit 2576T, 10 x 10mm sq.
269924
1
Blown fan orifice plate to suit 2576T, 9 x 10mm sq.
269928
1
Blown fan orifice plate to suit 2576T, 12 x 10mm sq.
REZNOR KIT PART NUMBER 270620
Part No.
Quantity
Description
270686
1
Propane Conversion Manual VC / VP
270412
1
Grommet 12.5 x 9.5mm
270459
1
M6 retaining washer
270655
2
Propane Data Conversion Label for VP1P25 / VC1P25
270656
2
Propane Data Conversion Label for VP2P25 / VC2P25
270374
1
Gas Valve Propane Conversion Kit
269949
1
Burner orifice plate
270366
2
3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive)
269958
1
Flame Plate Type 2
270399
1
Std. multi hole gas orifice 1.3mm
270328
1
Baffle Plate For Vision Burners
270414
2
No. 8 x 1/2" Stainless Steel Pozi Pan Self Tapper
269925
1
Blown fan orifice plate to suit 2576T, 10 x 10mm sq.
269928
1
Blown fan orifice plate to suit 2576T, 12 x 10mm sq.
18
Propane Conversion Kit Parts List.
REZNOR KIT PART NUMBER 270621
Part No.
Quantity
Description
270686
1
Propane Conversion Manual VC / VP
270412
1
Grommet 12.5 x 9.5mm
270459
1
M6 retaining washer
270657
2
Propane Data Conversion Label for VP1P30 / VC1P30
270658
2
Propane Data Conversion Label for VP2P30 / VC2P30
270374
1
Gas Valve Propane Conversion Kit
269950
1
Burner orifice plate
270366
2
3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive)
269958
1
Flame Plate Type 2
270399
1
Std. multi hole gas orifice 1.3mm
270328
1
Baffle Plate For Vision Burners
270414
2
No. 8 x 1/2" Stainless Steel Pozi Pan Self Tapper
269928
1
Blown fan orifice plate to suit 2576T, 12 x 10mm sq.
269930
1
Blown fan orifice plate to suit 2576T, 15 x 10mm sq.
REZNOR KIT PART NUMBER 270622
Part No.
Quantity
Description
270686
1
Propane Conversion Manual VC / VP
270412
1
Grommet 12.5 x 9.5mm
270459
1
M6 retaining washer
270659
2
Propane Data Conversion Label for VP1P38 / VC1P38
270660
2
Propane Data Conversion Label for VP2P38 / VC2P38
270374
1
Gas Valve Propane Conversion Kit
269951
1
Burner orifice plate
270366
2
3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive)
269959
1
Flame Plate Type 3
270400
1
Std. multi hole gas orifice 1.5mm
269931
1
Blown fan orifice plate to suit 2576T, 18 x 10mm sq.
269932
1
Blown fan orifice plate to suit 2576T, 21 x 10mm sq.
19
Propane Conversion Kit Parts List.
REZNOR KIT PART NUMBER 270623
Part No.
Quantity
Description
270686
1
Propane Conversion Manual VC / VP
270412
1
Grommet 12.5 x 9.5mm
270459
1
M6 retaining washer
270661
2
Propane Data Conversion Label for VP1P45 / VC1P45
270662
2
Propane Data Conversion Label for VP2P45 / VC2P45
270374
1
Gas Valve Propane Conversion Kit
269952
1
Burner orifice plate
270366
2
3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive)
269959
1
Flame Plate Type 3
270401
1
Std. multi hole gas orifice 1.7mm
269933
1
Blown fan orifice plate to suit 2576T, 26 x 10mm sq.
269934
1
Blown fan orifice plate to suit 2576T, 37 x 10mm sq.
REZNOR KIT PART NUMBER 270626
Part No.
Quantity
Description
270686
1
Propane Conversion Manual VC / VP
270412
1
Grommet 12.5 x 9.5mm
270459
1
M6 retaining washer
270664
2
Propane Data Conversion Label for VP2P50 / VC2P50
270374
1
Gas Valve Propane Conversion Kit
269953
1
Burner orifice plate
270366
2
3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive)
269960
1
Flame Plate Type 4
270403
1
Std. multi hole gas orifice 1.9mm
269936
1
Blown fan orifice plate to suit 2560-1, 14 x 10mm sq.
270375
1
1/2" NPT Standard Jet Carrier
20
Propane Conversion Kit Parts List.
REZNOR KIT PART NUMBER 270627
Part No.
Quantity
Description
270686
1
Propane Conversion Manual VC / VP
270412
1
Grommet 12.5 x 9.5mm
270459
1
M6 retaining washer
270661
2
Propane Data Conversion Label for VP1P45 / VC1P45
270374
1
Gas Valve Propane Conversion Kit
269952
1
Burner orifice plate
270366
2
3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive)
269959
1
Flame Plate Type 3
270401
1
Std. multi hole gas orifice 1.7mm
269933
1
Blown fan orifice plate to suit 2576T, 26 x 10mm sq.
269934
1
Blown fan orifice plate to suit 2576T, 37 x 10mm sq.
270375
1
1/2" NPT Standard Jet Carrier
REZNOR KIT PART NUMBER 270628
Part No.
Quantity
Description
270686
1
Propane Conversion Manual VC / VP
270412
1
Grommet 12.5 x 9.5mm
270459
1
M6 retaining washer
270663
2
Propane Data Conversion Label for VP1P50 / VC1P50
270664
2
Propane Data Conversion Label for VP2P50 / VC2P50
270374
1
Gas Valve Propane Conversion Kit
269953
1
Burner orifice plate
270366
2
3.0mm EPDM Sponge Gasket to suit Burner Casting (with adhesive)
269960
1
Flame Plate Type 4
270403
1
Std. multi hole gas orifice 1.9mm
269937
1
Blown fan orifice plate to suit 2560-1, 15 x 10mm sq.
269936
1
Blown fan orifice plate to suit 2560-1, 14 x 10mm sq.
270375
1
1/2" NPT Standard Jet Carrier
270442
2
Huba Pressure Switch Zinc Plated Fixing Screw
270386
1
Huba pressure switch, trip 77-87Pa / reset =<98Pa, with red label
21
Conversion Kit Part Conversion Kit Part
Natural Gas Model
Number (VPS/VCS) Number (VPT/VCT)
LP Gas Model/BTU
per hour AFTER
CONVERSION
High Altitude LP
Conversion
Available
60
270619
270619
18/60,000
YES
80
270620
270620
25/80,000
YES
100
270621
270621
30/100,000
YES
125
270622
270622
38/125,000
YES
150
270623
270623
45/150,000
YES
170
270627
270626
VPS/VCS
45/150,000
VPS/VCS ONLY
200
270628
270628
50/169,000
NO
These instructions must be used in conjunction with the standard heater installation manual.
These are generic conversion kits for each rating. Any extra components that come with the
conversion kit need to be disposed of accordingly.
22
TABLE 1
VPS/VCS LP Gas 0-2000 ft (0-610m)
Size
60
80
100
125
150
170*
200**
Fan Orifice
269925 269925 269928 269931 269933 269937 269937
Part No.
Quantity
10
10
12
18
26
26
15
10mm Holes
TABLE 2
VPS/VCS LP Gas 2001ft + (611m +)
Size
60
80
100
125
150
170*
200
Fan Orifice
269928 269928 269930 269932 269934 269934
Part No.
Quantity
12
12
15
21
37
37
10mm Holes
N/A
N/A
* De-rated from 169kBTU to 150kBTU.
** De-rated from 200kBTU to 169kBTU.
TABLE 3
VPT/VCT LP Gas 0-2000 ft (0-610m)
Size
60
80
100
125
150
170***
200**
Fan Orifice
269924 269925 269928 269931 269933 269936 269936
Part No.
Quantity
9
10+
12
18
26
14
14
10mm Holes
TABLE 4
VPT/VCT LP Gas 2001ft + (611m +)
Size
60
80
100
125
150
Fan Orifice
269928 269928 269930 269932 269934
Part No.
Quantity
12
12
15
21
37
10mm Holes
+ No fan orifice plate change required.
*** Not suitable for high altitude.
** De-rated from 200kBTU to 169kBTU.
23
170
200
N/A
N/A
Specifications & illustrations subject to change without notice or incurring obligations.
©2014 All rights reserved.
All marks are the property of their respective organizations.
O’Fallon, MO | Printed in U.S.A. (09/14)
245E-0914
CP-VC/VP-GC
24