GDOT TMC Redesign to Incorporate Tollway

2014 ITS 3C Summit
GDOT TMC Reconfiguration
September 16, 2014
Project Objectives
 Accommodate Current & Future Needs
 Improve Operational Efficiency
 Enhance GDOT-SRTA Operational Synergy
 Minimize Construction Impacts
 Design within Construction Budget Constraints
Current and Future Managed Lanes in Georgia
 Current Managed Lanes:
 I-85 Express Lanes
 Future Managed Lanes:
 I-75 South Metro
 12.24 miles, two barrier-separated reversible lanes
 Target Completion: Winter 2016/2017
 I-85 Extension
 11 mile extension of existing HOT lanes
 Target Completion: 2017
 Northwest Corridor
 29.7 miles, two barrier-separated reversible lanes
 Target Completion: 2018
Current TMC Functions and Operations
 Incident Management
 Traffic Management
 Regional Traffic Operations
Program (RTOP)
 Ramp Metering
 Traveler Information
 Emergency Management
Current TMC Functions and Operations
Current TMC Functions and Operations
Current TMC Functions and Operations
Current TMC Functions and Operations
TMC Work Stations & Video Wall (Future)
TMC of the Future Concept
Integrated
Corridor Management
Ramp
Metering
Traffic Operations
& Safety Studies
Real Time Signal
Operations
Traveler
Information
Incident
Management
Tunnel
Operations
Connected Vehicles
Applications
Parking
Management
Active Traffic
Management
Work Zone
Management
Dynamic
Pricing
Future TMC Functions and Operational Needs
 Managed Lanes Operations
 Reversible Lanes Operations
 Active Traffic Management
 Integrated Corridor Management
 Connected Vehicles Integration
Performance Measures
 Incident Clearance
 ITS Equipment Failures
 Communications Failures
 Speed Profiles
 Decision Support Systems
Schedule
Task Activity
Concept of Operations
Workshop No. 1
Workshop No. 2
Functional Requirements
Workshop No. 3
Workshop No. 4
Drawing, Specs, Estimates
60% Milestone
90% Milestone
100% Milestone
Construction
Punch List / Close-Out
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan - Jul
Existing GDOT Staff
Data Center
TMC Facility
Tech
GDOT Staff
GDOT Consultant
Vacant
Projection
Room
Training
Desk
Vacant
Media
Liaison
Control
Room
Vacant
Admin
19 Consoles
Vacant
Vacant
Supervisor
Floor
Supervisor
Vacant
Vacant
TMC Manager
Vacant
Facilities
Manager
Admin Ops
Manager
GDOT Client
Support (IT)
Procurement
Support
Assistant
Consultant
PM
Vacant
Vacant
TMC Ops
Engineers (2)
Vacant
Special
Studies
Engineer
Procurement
Vacant
Office
Assist.
State Traffic
Engineer
Current TMC Floor Layout
TMC 1st Floor &
Operations Center
Large Screen Video Display
RTOP RTOP
Operator
Operator
Operator
Dispatcher
Operator
Operator
Traffic
Specialist
Operator
Dispatcher
Operator
Operator
GSP
Traffic
Specialist
Operator
Dispatcher
Operator
Supervisor
Operator
Proposed Area Modifications
CONTROL
ROOM
(1,533 SF)
IT ROOM
(780 SF)
OFFICES
(1,323 SF)
CORRIDOR (1,375 SF)
OFFICES
(1,830 SF)
TOTAL
AREA
(6,815 SF)
Recent TMC Tour
SMART SunGuide TMC
Recent TMC Tour
Office Staff
GDOT I.T.
Contract
Staff
TMC and
Toll
Operations
Managers
SRTA
Facilities
Manager
Special
Studies
Engineer
Staff Position
# of Positions
Assistant State Traffic Engineer
TMC Manager
Facilities Manager
Administration Manager
Administration Group
Special Studies Engineer
GDOT IT
TMC and Toll Operations Managers
Contract Staff
SRTA Representative
1
1
1
1
5 (Multiple Positions in 1 Room)
1
1
2 (Multiple Positions in 1 Room)
5 (Multiple Positions in 1 Room)
2
Admin.
Manager
Administration
Group
TMC
Manager
Assistant
State
Traffic
Engineer
CONFERENCE
ROOM
Control Room Staff
Managed Lanes Console
(Shared GDOT-SRTA)
GDOT Managed Lanes Supervisor
SRTA Managed Lanes Supervisor
GDOT Traffic Specialist
GDOT I-85 Managed Lanes Operator
SRTA I-85 Managed Lanes Operator
GDOT NW Corridor Managed Lanes Operator
SRTA NW Corridor Managed Lanes Operator
GDOT I-75 South Managed Lanes Operator
SRTA I-75 South Managed Lanes Operator
Subtotal
1
1
1
1
2
2
2
2
2
14
GDOT TMC Operations Console
with Traffic Specialist
GDOT Traffic Specialist
GDOT TMC Operators
GDOT TMC Dispatcher
Subtotal
1
2
1
4
GDOT TMC Operations
GDOT TMC Operators
GDOT TMC Dispatcher
Subtotal
2
1
3
GDOT TMC Operations
GDOT TMC Operators
GDOT TMC Dispatcher
Subtotal
2
1
3
GDOT TMC Operations
GDOT TMC Operators
GDOT TMC Dispatcher
Subtotal
2
1
3
GDOT TMC Operations (Future Staff)
GDOT TMC Operators
GDOT TMC Dispatcher
Subtotal
2
1
3
RTOP Corridor Managers
RTOP Corridor Managers
2
GDOT TMC Supervisor / GSP Dispatch
GDOT TMC Supervisor
GSP Dispatcher
Subtotal
1
1
2
Total Number of Workstations
34
Control Room Design
 Lighting
 Acoustics
 Ergonomic Console Design
 Technology Integration
 Traffic and Workflow Analysis
 Use of Video Walls
 “Green” Products
Workstation Console Options
EVANS CONSOLES
Workstation Console Options
Individual Climate Control
Task Lighting
Wire Management
Design Option 1
MECHANICAL
ROOM
DATA
CENTER
WORKSHOP
PROJECTION
ROOM
CONTROL ROOM (3,485 SF)
POD
D
21 Operator Consoles
1 Supervisor Consoles
2 Optional Consoles
POD
C
GDOT I.T.
POD
B
POD
G
POD
E
Copy / Mail
Room
BREAK ROOM
POD
A
Cont.
Admin
POD
F
Project
Manager
LOBBY
Facilities
Manager
Special
Studies
Engineer
SRTA
Operations
Managers
(2)
TMC
Manager
Traffic
Engineer
CONFERENCE
ROOM
Design Option 2
MECHANICAL
ROOM
DATA
CENTER
WORKSHOP
PROJECTION
ROOM
POD
B
POD
A
CONTROL ROOM
27 Operator Consoles
1 Supervisor Console
GDOT I.T.
POD
C
POD
D
POD
E
BREAK ROOM
Copy / Mail
Room
Cont.
Admin
POD
F
POD
G
Project
Manager
LOBBY
Facilities
Manager
Special
Studies
Engineer
SRTA
Operations
Managers
(2)
TMC
Manager
Traffic
Engineer
CONFERENCE
ROOM
Design Option 3
MECHANICAL
ROOM
DATA
CENTER
WORKSHOP
PROJECTION
ROOM
CONTROL ROOM
23 Operator Consoles
1 Supervisor Console
GDOT I.T.
POD
A
BREAK ROOM
Copy / Mail
Room
Cont.
Admin
Project
Manager
LOBBY
Facilities
Manager
Special
Studies
Engineer
SRTA
Operations
Managers
(2)
TMC
Manager
Traffic
Engineer
CONFERENCE
ROOM
Proposed Floor Plan
CONTROL ROOM (3,485 SF)
MECHANICAL
ROOM
DATA
CENTER
WORKSHOP
New Monitors
PROJECTION
ROOM
POD
D
New Monitors
POD
J
POD
F
POD
B
POD
E
POD
A
New Monitors
Contract
Staff
TMC and
Toll
Operations
Managers
POD
K
POD
G
POD
C
GDOT I.T.
BREAK ROOM
POD
H
ENTRY
FOYER
SRTA
Glass Wall
Facilities
Manager
Special
Studies
Engineer
Admin.
Manager
Administration
Group
TMC
Manager
Assistant
State
Traffic
Engineer
CONFERENCE
ROOM
36 Total Operator Consoles
29 GDOT Consoles
7 SRTA Consoles
Console for Proposed Control Room Layout
Wire Management
Located in Slatwall
Cool Air Module
User Configurable
Slatwall with Front and
Rear Access
Prewired for Power,
Voice and Data
Control Panel
Single or Double
Work Surface
Options
Adjustable Height
with Safety Features
Pop-up Power
Radiant or Forced Air Heat
Console size accommodates
the following monitor sizes:
8 – 19” monitors (stacked)
6 – 27” monitors (stacked)
4 – 32” monitors (stacked)
Summary / Next Steps
 Develop 60% Construction Submittal
 Architectural and Furniture Design
 Mechanical and Electrical Design
 Construction Drawings
 Communications and Systems Design
 Specifications
 Cost Estimates