Item 15_Visual RNAV evaluation in France

Visual RNAV
evaluation in
France
13th March 2014
Direction Générale de l’Aviation Civile
Ministère de l'Écologie, du Développement durable, et de l’Énergie
RNAV visual concept
• Perform a visual approach while
following a RNAV track
• Predictability for the ATC and the crew,
flyability of the procedure (safety)
• Track optimized for the environment
(noise and fuel emission, CDO)
• RNAV Visual or Visual RNAV?
Direction générale de l’Aviation civile
Ministère de l'Écologie, du Développement durable, et de l’Énergie
Context
- RNAV visual in service at a number of
airports
- No harmonized regulation and guidance
- Work has started at IFPP
Direction générale de l’Aviation civile
Ministère de l'Écologie, du Développement durable, et de l’Énergie
Operational evaluation in France
• Letter of interest from Air France
• Working group with Air France,
the ANSP, the Surveillance, and
the Regulatory entities
• 1st evaluation to be performed at
Bordeaux airport, summer 2014
Direction générale de l’Aviation civile
Ministère de l'Écologie, du Développement durable, et de l’Énergie
Current regulation in France
• (Abstract RCA3 = French Doc. 4444)
• RCA3, 4.3.3 : Visual approach clearance
Visibility and ceiling to be defined
RNAV track can be prescribed
Pilot or ATC can propose the
RNAV visual (day), pilot (night)
• Design of the procedure based on VPT
and RNAV criteria
Direction générale de l’Aviation civile
Ministère de l'Écologie, du Développement durable, et de l’Énergie
Criteria for the procedure design
• Protection area and obstacle clearance
from the VPT criteria (until the start of
the final approach segment)
• 30’’ flight minimum on the final
approach segment
• Minimal length of RNAV segment for
flyability
• RF segment
• GNSS only
Direction générale de l’Aviation civile
Ministère de l'Écologie, du Développement durable, et de l’Énergie
Draft procedure
Direction générale de l’Aviation civile
Ministère de l'Écologie, du Développement durable, et de l’Énergie
Procedure
• The altitude at the first waypoint will
allow to perform a CDO
• Go around procedure similar to the
planned Missed approach procedure
• Validation : one simulator session
requested
• Published by AIP Supplement, partner
airline only
Direction générale de l’Aviation civile
Ministère de l'Écologie, du Développement durable, et de l’Énergie
Phraseology
• Pilot :
- ENAC, Citron Air 3245, requesting RNAV
Visual SOGBO runway 05
• ATC :
- Citron Air 3245, cleared RNAV Visual
SOGBO runway 05
Or
• ATC :
- Citron Air 3245, do you accept RNAV
visual SOGBO runway 05?
Direction générale de l’Aviation civile
Ministère de l'Écologie, du Développement durable, et de l’Énergie
Conclusion
• Operational trial should start this
summer, 6-month period
• Lessons learned will be used to help at
developing harmonized documents for
the aviation community
Direction générale de l’Aviation civile
Ministère de l'Écologie, du Développement durable, et de l’Énergie