Thames Water Water Resources Work Programme 2014

Thames Water Water Resources Work Programme 2014 - 2019
This document presents Thames Water's work programme on water resources from 2014 to 2019. A report accompanies this programme which provides summary information on each activity. The information presented in this work
programme is based on the best available information, TW will endeavour to adhere to the programme however there will be changes to the programme. A number of activities are reliant on approval of funding by Ofwat as part of
the Business Plan, Thames Water (TW) will review these activities following approval of the Business Plan. The external projects (Section 2) includes a number of projects, some of which are still in discussion, these projects will
involve a number of organisations and will be led by UKWir or the EA and therefore the delivery is not directly in TW's control. The programme will be updated quarterly and published on TW's website
www.thameswater.co.uk/wrmp. We will work with regulators and stakeholders as we progress all aspects of the work programme. A stakeholder engagement plan has been published which accompanies the programme.
Regulatory submissions
1.1
Annual Review
1.2
WRMP19 (timeline based on WRMP14)
Review technical methods and development of models
Baseline demand forecast
Baseline supply forecast
Headroom assessment
Baseline supply demand balance
Programme development
draft WRMP19 to Defra
Public consultation
Statement of Response
Revised draft WRMP19
1.3
Drought Plan (TWs DP approved July 2013. Timeline to be agreed with Defra)
Review and update DP
draft DP to Defra
draft DP consultation
Statement of Response
Revised draft DP
Approval from SoS
2
External projects - These projects are not under the direct control of TW
2.1
Water Resources in the South East (WRSE)
Scope definition
Technical work
Strategic plan
Phase 2 technical work (if required)
2.2
UKWir and EA Projects
WRPG and Tables (EA)
Climate Change (EA)
Demand forecasting (UKWir)
Decision making process (UKWir)
E&S assessment - Alignment with WFD and ecosystem services
approach (EA)
Consideration of stochastic modelling for demand forecasting, planning
allowances and SD balance (UKWIR)
3
Future Uncertainties
3.1
Climate change
Consideration of the resilience of TW supply system under different
climatic futures
3.2
Abstraction reform
Close of formal Defra consultation
Engagement with Defra/EA
Assess implications for TW supply area
3.3
Sustainability Reductions
Complete NEP investigations
Abstraction licence reductions to be agreed with the EA
3.4
Multi-criteria performance modelling - Research with UCL and
Manchester Universities
Research and technical development
Year 3 progress update
Year 4 progress update
Publication of research
4
Development of TW WR model - WARMS2
4.1
4.1.1
Assessment of Drought Schemes
West Berkshire Groundwater Scheme (WBGS)
Technical assessment of operational impacts, river flow impacts and
inclusion in WARMs2
Interim Assessment of London and KV WRZ DO impact
Formulation of operating strategy with EA
Sign off operating strategy
Programme TBC
Programme TBC
Programme TBC
Programme TBC
Programme TBC
Programme TBC
Scope, technical activity, timeline and outputs to be defined.
Oct
Dec
Nov
Jul
Sep
Jun
Aug
Apr
Mar
May
Jan ###
Feb
Oct
Dec
Nov
Jul
Sep
Jun
Aug
Apr
Mar
May
Jan ###
Feb
Oct
Dec
Nov
Jul
Sep
Jun
Aug
Apr
Mar
May
Jan ###
Feb
Dec
Oct
Nov
Jul
Sep
Aug
Jun
Apr
Mar
Approval from SoS (assuming no requirement for a public hearing or
inquiry)
May
Jan ###
Feb
Dec
Oct
Nov
Jul
Sep
Aug
Jun
Apr
May
Jan ###
Feb
Mar
Dec
Oct
Sep
Nov
Jul
Aug
Jun
Apr
May
Feb
Jan ###
1
Mar
Date: August 2014
4.1.2
North London Artificial Recharge Scheme (NLARS)
Technical assessment including catchment impacts
Updated assessment of London DO agreed with EA
4.1.3
Northern New River Wellfield (NNR)
Technical assessment of bromate on Lee Valley operations
Revised assessment of NNRW bromate impact on London WRZ DO
4.1.4
Agree DO of NNRW with EA
Combined WRZ DO Impact assessment
Interim Assessment of combined WRZ DO impact from NLARS, NNR and
WBGWS
4.2
Optimisation of Lower Thames Control Diagram (LTCD)
Technical assessment and engagement with EA
Consultation on the environmental objectives
Agreement on environmental requirements with EA
Scenario testing and optimisation
Consultation
Refinement and further scenario testing
Consultation
Revised LTCD agreed TW & EA
4.3
DO Verification
Audit of WARMS2 (HRW)
Assess impact of 2011 & 2012 hydrometric data (dependent on receipt
of data from EA)
Sensitivity assessment
5
Water resource options
5.1
Phase 1: Critical review of options.
Water Resources Forum: Introduction to programme
Stakeholder Technical Meeting: Appraisal process
Water Resources Forum: Interim results of appraisal process
Draft report for comment
Final report
5.2
Preliminary Detailed Investigations
5.2.1
River Severn Water Quality and Ecology Study
Scope definition
Tendering and appointment
Technical activity
Consultation
Draft report for comment
Final report
5.2.2
River Severn Flow Study
Scope definition
Tendering and appointment
Technical activity
Draft report for comment
Final report
5.2.3
Wastewater re-use
Consultation with Independent Expert Review Panel (IERP) on the
research programme
Technical research
5.3
Phase 2: Detailed investigation of supply options
Water Resources Forum: Introduction to Phase 2 Investigation (Date
TBC)
5.4
Phase 3: Update of cost estimates
5.5
Aquifer Storage and Recovery
Design phase, planning permission and land access arrangements
Phase 1 Drill and test boreholes
Phase 2 Recharge and abstraction
Phase 3 Hydraulic and water quality monitoring
Final report
6
Demand management
6.1
Demand Management AMP6 Programme Monitoring
2 year benefits review
6.2
Innovative tariffs
Tariff Trial Preparation
Trial ( 2 years)
Data review analysis
Report
7
Catchment Management
Scope definition
Further work TBD
Key
Complete
Activity agreed and programme defined
Activity planned but programme not yet defined
Output