Thames Water Water Resources Work Programme 2014 - 2019 This document presents Thames Water's work programme on water resources from 2014 to 2019. A report accompanies this programme which provides summary information on each activity. The information presented in this work programme is based on the best available information, TW will endeavour to adhere to the programme however there will be changes to the programme. A number of activities are reliant on approval of funding by Ofwat as part of the Business Plan, Thames Water (TW) will review these activities following approval of the Business Plan. The external projects (Section 2) includes a number of projects, some of which are still in discussion, these projects will involve a number of organisations and will be led by UKWir or the EA and therefore the delivery is not directly in TW's control. The programme will be updated quarterly and published on TW's website www.thameswater.co.uk/wrmp. We will work with regulators and stakeholders as we progress all aspects of the work programme. A stakeholder engagement plan has been published which accompanies the programme. Regulatory submissions 1.1 Annual Review 1.2 WRMP19 (timeline based on WRMP14) Review technical methods and development of models Baseline demand forecast Baseline supply forecast Headroom assessment Baseline supply demand balance Programme development draft WRMP19 to Defra Public consultation Statement of Response Revised draft WRMP19 1.3 Drought Plan (TWs DP approved July 2013. Timeline to be agreed with Defra) Review and update DP draft DP to Defra draft DP consultation Statement of Response Revised draft DP Approval from SoS 2 External projects - These projects are not under the direct control of TW 2.1 Water Resources in the South East (WRSE) Scope definition Technical work Strategic plan Phase 2 technical work (if required) 2.2 UKWir and EA Projects WRPG and Tables (EA) Climate Change (EA) Demand forecasting (UKWir) Decision making process (UKWir) E&S assessment - Alignment with WFD and ecosystem services approach (EA) Consideration of stochastic modelling for demand forecasting, planning allowances and SD balance (UKWIR) 3 Future Uncertainties 3.1 Climate change Consideration of the resilience of TW supply system under different climatic futures 3.2 Abstraction reform Close of formal Defra consultation Engagement with Defra/EA Assess implications for TW supply area 3.3 Sustainability Reductions Complete NEP investigations Abstraction licence reductions to be agreed with the EA 3.4 Multi-criteria performance modelling - Research with UCL and Manchester Universities Research and technical development Year 3 progress update Year 4 progress update Publication of research 4 Development of TW WR model - WARMS2 4.1 4.1.1 Assessment of Drought Schemes West Berkshire Groundwater Scheme (WBGS) Technical assessment of operational impacts, river flow impacts and inclusion in WARMs2 Interim Assessment of London and KV WRZ DO impact Formulation of operating strategy with EA Sign off operating strategy Programme TBC Programme TBC Programme TBC Programme TBC Programme TBC Programme TBC Scope, technical activity, timeline and outputs to be defined. Oct Dec Nov Jul Sep Jun Aug Apr Mar May Jan ### Feb Oct Dec Nov Jul Sep Jun Aug Apr Mar May Jan ### Feb Oct Dec Nov Jul Sep Jun Aug Apr Mar May Jan ### Feb Dec Oct Nov Jul Sep Aug Jun Apr Mar Approval from SoS (assuming no requirement for a public hearing or inquiry) May Jan ### Feb Dec Oct Nov Jul Sep Aug Jun Apr May Jan ### Feb Mar Dec Oct Sep Nov Jul Aug Jun Apr May Feb Jan ### 1 Mar Date: August 2014 4.1.2 North London Artificial Recharge Scheme (NLARS) Technical assessment including catchment impacts Updated assessment of London DO agreed with EA 4.1.3 Northern New River Wellfield (NNR) Technical assessment of bromate on Lee Valley operations Revised assessment of NNRW bromate impact on London WRZ DO 4.1.4 Agree DO of NNRW with EA Combined WRZ DO Impact assessment Interim Assessment of combined WRZ DO impact from NLARS, NNR and WBGWS 4.2 Optimisation of Lower Thames Control Diagram (LTCD) Technical assessment and engagement with EA Consultation on the environmental objectives Agreement on environmental requirements with EA Scenario testing and optimisation Consultation Refinement and further scenario testing Consultation Revised LTCD agreed TW & EA 4.3 DO Verification Audit of WARMS2 (HRW) Assess impact of 2011 & 2012 hydrometric data (dependent on receipt of data from EA) Sensitivity assessment 5 Water resource options 5.1 Phase 1: Critical review of options. Water Resources Forum: Introduction to programme Stakeholder Technical Meeting: Appraisal process Water Resources Forum: Interim results of appraisal process Draft report for comment Final report 5.2 Preliminary Detailed Investigations 5.2.1 River Severn Water Quality and Ecology Study Scope definition Tendering and appointment Technical activity Consultation Draft report for comment Final report 5.2.2 River Severn Flow Study Scope definition Tendering and appointment Technical activity Draft report for comment Final report 5.2.3 Wastewater re-use Consultation with Independent Expert Review Panel (IERP) on the research programme Technical research 5.3 Phase 2: Detailed investigation of supply options Water Resources Forum: Introduction to Phase 2 Investigation (Date TBC) 5.4 Phase 3: Update of cost estimates 5.5 Aquifer Storage and Recovery Design phase, planning permission and land access arrangements Phase 1 Drill and test boreholes Phase 2 Recharge and abstraction Phase 3 Hydraulic and water quality monitoring Final report 6 Demand management 6.1 Demand Management AMP6 Programme Monitoring 2 year benefits review 6.2 Innovative tariffs Tariff Trial Preparation Trial ( 2 years) Data review analysis Report 7 Catchment Management Scope definition Further work TBD Key Complete Activity agreed and programme defined Activity planned but programme not yet defined Output
© Copyright 2024 ExpyDoc