Download PDF (4 MB)

Add-ons paper sack machines
Add-ons Tuber
Add-ons Bottomer
Add-ons Rotaliner
- Page 2 - 11
- Page 12 – 22
- Page 23
EXTRUSION | PRINTING | CONVERTING
More Uptime! Add-on „Easy Stop“
location
advantages
impressions
up to 2 minutes saving per roll change
improved time & staff management
automated speed down-ramping
deliveries
setup for 4 plies: 8 magnet rings, 8 sensors
updated software/control
integrated into machine control; or
separate handling & display for older machines
installation time – approx. 4 days
AM
2130
2140
2145
2150
2155
2160
2170
2180
AM
8105
Standard
8115
8125
8135
Standard
EXTRUSION | PRINTING | CONVERTING
More Uptime! Add-on „Non Stop“
location
advantages
impressions
extra production time
semi-automatic roll change while tuber is
running
deliveries
Drive for speed synchronization the rolls
Pneumatic pressing of the accelerator roll
Stopping brake for exact prepositioning
Pivoting roller for splice pressing
Pneumatic separating station
Access safety sensors
Function “easy stop” required
0,5m space per stand needed
installation time – approx. 1 week
AM
2130
2140
2145
2150
2155
2160
2170
2180
Non Stop
Faster ramp down
AM
8105
8115
Time saved
Faster ramp up
8125
8135
EXTRUSION | PRINTING | CONVERTING
Print Control System = use of Pre-printed Material
location
advantages
impressions
use of pre-printed material is possible
faster changeover
prerequisite for retrofitting of slave drive printers
deliveries
optical sensor for scanning of the print mark
operator panel with membrane keyboard and LCD
AC servo motor
drive control in the switch cabinet
ring clamping couplings
installation time – approx. 1 week
AM
2130
2140
2145
2150
2155
standard
2160
2170
2180
AM
8105
8115
8125
8135
standard
standard
standard
standard
EXTRUSION | PRINTING | CONVERTING
Quicker Filling Process through Venthole Perforation
location
advantages
impressions
quicker filling
anti slip
alternative to the use of highly porous paper
deliveries
1. newer machines: integrated system, rolls, attachments
2. older machines: perforation tower
optional
I.additional rolls, e.g. microperforation (5mm x 5mm)
II.skipped perforation
III.turret system
installation time – approx. 1 week
AM
2130
2140
2145
2150
2155
2160
2170
2180
AM
8105
8115
8125
8135
EXTRUSION | PRINTING | CONVERTING
PE-Film Processing-Set
location
advantages
impressions
controlled web tension of PE-Film
capability of thin-film processing
higher productivity – easier processing
3
1
deliveries
1. 4Q-Drive
2. Ionisation-Unit
3. Dispersion Glue Pump
2
installation time – approx. 2 - 4 days
AM
2130
2140
2145
2150
2155
2160
2170
2180
AM
8105
8115
8125
8135
EXTRUSION | PRINTING | CONVERTING
Quick Change - Central Clamping Unit
location
advantages
impressions
upgrade to quick change tooling, rapid mounting instead
of several screws (cross pasting and stepped end)
shorter setup time
savings: About 3 minutes per ply per setup
deliveries
new platen carrier shaft and assembly
possibly new cross-pasting plates necessary
installation time – approx. 1 day
AM
2130
2140
2145
2150
2155
standard
2160
2170
2180
AM
8105
8115
8125
8135
standard
standard
standard
standard
EXTRUSION | PRINTING | CONVERTING
Produce Clean Sacks - Web Cleaning Unit
location
advantages
impressions
clean inner ply
new markets (food, hygiene)
deliveries
vacuum station for 1700 mm web width
one anti-static bar each before and after the vacuum station
two brushes arranged between the anti-static bars
dust removal unit incl. dust collection container
attachment parts
installation time – approx. 2 days
AM
2130
2140
2145
2150
2155
2160
2170
2180
AM
8105
8115
8125
8135
EXTRUSION | PRINTING | CONVERTING
High-Performance Tear-Off
location
advantages
impressions
less marks on tubes – improved sack quality
handling of modern papers (high porous/sensitive surfaces)
improved packet forming (belt system)
faster changeover (belt system)
1.
2.
3.
rubber covered snatchers
belt conversion kit
new Tear Off Unit
1.
2.
3.
2
1
installation time
deliveries
approx. 2 days
approx. 1 week
approx. 1 week
3
AM
2130
2140
2145
2150
2155
standard
standard
2160
2170
2180
AM
8105
8115
8125
8135
standard
standard
standard
standard
EXTRUSION | PRINTING | CONVERTING
Use the Advantages of Flush-Cut & Tracking per PCS
location
advantages
impressions
less web breaks – less downtimes
less waste & faster changeover
less costs for tooling
print related quality improvements through PCS
deliveries
adjustable cross perforation unit
knife bars
sensor-guided adjustment during operation
installation time – approx. 4 days
AM
2130
2140
2145
2150
2155
2160
2170
2180
AM
8105
8115
8125
8135
EXTRUSION | PRINTING | CONVERTING
Ready for Automation - Packet Forming Station
location
advantages
better packets
ready for automation
improved quality for feeding of bottomer
increased production speed
less waste
impressions
deliveries
separate drives for shingling conveyor
transfer and packeting conveyors
integrated control cabinet
installation time – approx. 2 days up to 1 week
AM
2130
2140
2145
2150
2155
standard
2160
2170
2180
AM
8105
8115
8125
8135
standard
standard
standard
standard
EXTRUSION | PRINTING | CONVERTING
Bottom Patch Unit
location
impressions
advantages
improved sack filling process
additional space for marketing issues
additional features available e.g.
carrying handle
Easy Opening
patch wrap around
sealed valves
deliveries
unwind stands including web guiding
paste applicators & monitoring
expansion clamp paster carriers
automatic lift-off of paster carriers when a sack is missing
mounting assembly
installation time – approx. 2 weeks
AD
2360
2366
2368
2377
2378
2379
2390
AD
8300
8310
8320
8330
EXTRUSION | PRINTING | CONVERTING
Easy Opening incl. Carrying Handle Unit
location
advantages
impressions
additional feature for customer
Unique Selling Point for Do-It-Yourself markets
deliveries
driven knife shaft with segmental knives
unwind stands PE-string
installation time – approx. 1 day per Unit
AD
2360
2366
2368
2377
2378
2379
2390
AD
8300
8310
8320
8330
EXTRUSION | PRINTING | CONVERTING
Print Control System for Bottom Patch Unit
location
advantages
impressions
automatic registering of bottom patch print
faster changeover, by use of pre-printed rolls
less waste during run-up
deliveries
sensor for print mark scanning
servo motor and differential drive
Drive control, frequency inverter and software package
Input and display of operating information
installation time – approx. 3 days per Unit
AD
2360
2366
2368
2377
2378
2379
standard
2390
AD
8300
8310
8320
8330
standard
standard
EXTRUSION | PRINTING | CONVERTING
Bottom Patch Printers
location
impressions
advantages
flexibility in production, no pre-print
additional space for marketing issues
safety information
Flexo
Miniflex
deliveries
printing units
anilox transfer roller
alignment of the print to the cut
automatic plate cylinder lift-off at machine stop
installation time – approx. 3 days per Unit
AD
2360
2366
2368
2377
2378
2379
2390
AD
8300
8310
8320
8330
EXTRUSION | PRINTING | CONVERTING
Wash-Up System for Bottom Patch Printer Miniflex
location
advantages
impressions
semi-automatic cleaning of the color decks
faster changeover
wash up time: 3 minutes
deliveries
fresh and waste water tank
connecting lines, valves, waste water tank between tanks
and doctor chambers
software for wash-up program
installation time – approx. 1 day
AD
2360
2366
2368
2377
2378
2379
2390
AD
8300
8310
8320
standard
8330
standard
EXTRUSION | PRINTING | CONVERTING
diagonal creasing station with elastic counter elements
location
advantages
impressions
improved geometry
improved sack quality
no damage to paper
waste reduction
faster changeover
deliveries
creasing elements
elastic counter elements
installation time – approx. 2 days
AD
2360
2366
2368
2377
2378
2379
2390
standard
AD
8300
8310
8320
8330
standard
standard
standard
standard
EXTRUSION | PRINTING | CONVERTING
Improved Seam Pasting for Preformed Tubular Valves
location
advantages
impressions
uniform glue application
interruption of glue bead on the cut edge
high speeds even with difficult to handle
materials and products
deliveries
stand alone application unit
installation time – approx. 2 days
AD
2360
2366
2368
2377
2378
2379
2390
AD
8300
8310
8320
8330
EXTRUSION | PRINTING | CONVERTING
New Valve Design: Mirror-inverted Tubular Valves
location
advantages
impressions
easier opening when filling sacks
improved sack integrity
different product designs available
deliveries
mirror-inverted closing
installation time – approx. 2 days
AD
2360
2366
2368
2377
2378
2379
2390
AD
8300
8310
8320
8330
EXTRUSION | PRINTING | CONVERTING
PE-Film Perforating Tools: avoid blocking!
location
advantages
impressions
prerequisite for sealed valves
no blocking of preformed tubular valves
deliveries
special knive arrangement
grooved roller
prerequisite: drive for thumb notch cutter
installation time – approx. 1 day
AD
2360
2366
2368
2377
2378
2379
2390
AD
8300
8310
8320
8330
EXTRUSION | PRINTING | CONVERTING
Bottom Width Checking Unit
location
advantages
impressions
scan of the bottom width for dimensional
quality check
detecting of bottom patch wrap-around
deliveries
pair of opto-electronic sensors on both sides
installation time – approx. 2 days
AD
2360
2366
2368
2377
2378
2379
2390
AD
8300
8310
8320
8330
EXTRUSION | PRINTING | CONVERTING
State of the art pressing: 2 Drum delivery & accumulator
location
advantages
improved integrity and sift proofness with less glue
intense, continuous adjustable pressing
more sacks per pallet, increased storage capacity
prerequisite for automation/palletizing
impressions
deliveries
belt sections with two deviating drums
motorized transverse adjustment of the drive side
pneumatically adjustable pressing rollers
electronic counter, adjustable up to 25 sacks / packet
shingle interrupter, switch cabinet and AC drive
AD
2360
2366
2368
2377
2378
2379
standard
installation time – approx. 1 week
2390
standard
AD
8300
8310
8320
8330
standard
standard
standard
standard
EXTRUSION | PRINTING | CONVERTING
Rotaliner Add-Ons
available upgrades
•
•
•
•
Servo drive for cross-perforation
Driven auxilliary draw
Servo drive for vacuum belts at the Z-fold
Sealing bar monitoring
advantages
REDUCED MAINTENANCE & IMPROVED ROTALINER PERFORMANCE
•
reduced maintenance, synchronization settings, reduced wear & tear, reduced waste,
avoidance of contamination from the chain drive
HIGHER & MORE CONSISTANT QUALITY OF FINAL PRODUCT
•
through monitoring of the sealing bars
•
more precise positions of the seals, perforations and Z-fold
reduced waste