3. Building Simple Project (Practice)

Sep. 7, 2012
Runoff Analysis using
CommonMP
Yoshito KIKUMORI, River Dept. NILIM
NILIM
Ministry of Land, Infrastructure, Transport and Tourism
National Institute for Land and Infrastructure
1
NILIM
1.
2.
3.
4.
5.
What is CommonMP? What can we do with CommonMP?
Configuration of CommonMP
Building Simple Simulation Project
River Channel Discharge at Flood Time (Practice)
Parameter Sensibility Analysis of Storage Function
Runoff Model (Practice)
2
NILIM
1. What is CommonMP? What can we do with CommonMP?
・ CommonMP is the Common Platform on which various hydraulic and hydrology
models run simultaneously in cooperate with each other.
・ Element Models is various hydraulic and hydrology models which run on
CommonMP.
Element Model
Runoff
CommonMP
Element Model
流出
計算
○○
計算
inundation
River
氾濫
計算
•We can make simulation of hole river basin utilizing CommonMP
3
NILIM
1. What is CommonMP? What can we do with CommonMP?
•Simulation Project and Element Models have high portablity.
From A to B
Element Model
降雨
予測
Element Model
B
Building Simulation
Project
CommonMP
○○
計算
河道
計算
A
Building Element
Model
From B to A
Simulation Project
4
NILIM
1. What is CommonMP? What can we do with CommonMP?
•Frequently used Element models are already built by NILIM
5
NILIM
1. What is CommonMP? What can we do with CommonMP?
■オフライン入力モジュール群
1.降雨観測値・予測値
の入力モジュール
・地上観測雨量
・レーダ雨量
■オンライン入出力モジュール群
2.水位観測値等の入力
モジュール
12.統一河川情報システムの
入出力
・観測水位
・河口潮位
・ダムや排水機場などの
施設の流入・放流量
・地上観測雨量
・レーダ雨量
・観測水位
・河口潮位
・ダムや排水機場などの施設
の流入・放流量
※wisef形式のcsvデータを読み込む
•Using element models building
by NILIM etc. you can conduct
hydraulic and hydrology.
■演算モジュール群
3.降水量モジュール
5.河川管理施設の
操作モジュール
8.調整のモジュール
・面積雨量
・ダム
・放水路
・ニューラルネットワーク
・分布型雨量
・排水機場
・堰
・定数固定現時刻合わせ方式
・遊水地
・樋門樋管
・累加雨量、欠測処理
・降雨量手動入力
・水閘門(大規模)
・内水域
・放流量手動入力
4.流出モデルのモジュール
(集中型モデル)
13.水位相関による
予測モジュール
(分布型モデル)
・貯留関数
・有効降雨モデル
・タンクモデル
・表面流
・合理式
・表層
・準線型貯留
関数
・中間層上段
6.河道モデルのモジュール
・単相関
・重相関
・等流
・不等流
・S-Q関係
・中間層下段
・地下層
7.水位ー流量関係
モジュール
・実績HーQ
・H-Q式算定
■出力モジュール群
9.グラフ表示のモジュール
・流出予測結果のグラフ表示
・基準水位との対比
・洪水規模の評価
11.データ保存のモジュール
・降雨値
・潮位・流入量・放流量
・調節のモジュールの算出結果
10.リスク表示のモジュール
下記に対し、アラートを行う
・雨量、水位
・調整のモジュールの出力
・誤差評価
14.誤差評価のモジュール
・洪水予測モデルチェックマニュ
アルの誤差評価
凡例
入力要素
演算要素
出力要素
1つの要素モデル
データ伝送
CommonMP仕様
6
NILIM
2. Configuration of CommonMP
7
国土技術政策総合研究所
2. Directories and Files for CommonMP
●CommonMP\Execute\bin
for Executable files
●CommonMP\Execute\conf
for Configuration flies
●CommonMP\CommonMPData
for Simulation Projecto Files
●CommonMP\Source\HYMCO\OptionImpl
Source of Element Model
8
NILIM
3. Building Simple Project (Practice)
9
NILIM
3. Building Simple Project (Practice)
Boot of CommonMP
Double Click Icon of CommonMP
Double Click
10
NILIM
3. Building Simple Project (Practice)
Bulid New Project
Choose Menu [File →Project → New]
11
NILIM
3. Building Simple Project (Practice)
Input of Projct Info
Project Group and Project Name are necessary.
Project Gr: AAA_Basin
Project Name:Sample
12
NILIM
3. Building Simple Project (Practice)
Data
Copy Rain.csv in Input Dir of Project Dir.
13
NILIM
3. Building Simple Project (Practice)
Placement of Element Model
Partical Gr
Basin
Convergence Gr
User Difinition
Channel
Input
Marge
接続要素
Output
NILIM
3. Building Simple Project (Practice)
Sample Project
Storage Function
CSV Input
Monitor Output
河道貯留関数
(S-Q関係)
15
NILIM
3. Building Simple Project (Practice)
Placement of Element Model
Choose Input Element
, and the place it.
16
NILIM
3. Building Simple Project (Practice)
Placement of Element Model
Input the time series CSV
17
NILIM
3. Building Simple Project (Practice)
Setting Parameters
Double click Input Element and click advanced setting for pramenter
setting.
入力要素モデルを
ダブルクリックします
クリックします
18
NILIM
3. Building Simple Project (Practice)
Setting Parameter
Data File(Rain.csv)
観測所地点数(5)を入力
地点指定(1)を入力
Click “Configuration”
※:..\..\CommonMPData\AAAグループ\InputData\Rain.csv
19
国土技術政策総合研究所
3. Building Simple Project (Practice)
Placement of Element
Basin Element
20
NILIM
3. Building Simple Project (Practice)
Placement of Element
Sample Storage Function
21
NILIM
3. Building Simple Project (Practice)
Setting Parameter
Double Click
Time Step:360sec
Basin Area:50km2
Parameter K:43.1
Parameter P:0.31
Delay Time:0.3hr
F1:0.5
Rsa:80mm
Base Flow:4.8m3/sec
Input parameters
22
NILIM
3. Building Simple Project (Practice)
Placement of Element
Stream Element
23
国土技術政策総合研究所
3. Building Simple Project (Practice)
Placement of Element
(S-Q関係)
(S-Q関係)
24
NILIM
3. Building Simple Project (Practice)
Setting Parameter
各パラメータに任意の値を
入力します
ダブルクリックします
K: 11.8
P: 0.6
Tl: 0.3hr
Tlz:0.3hr
25
NILIM
3. Building Simple Project (Practice)
Placement of Element
Output Element
26
国土技術政策総合研究所
3. Building Simple Project (Practice)
Placement of Element
27
NLIM
3. Building Simple Project (Practice)
Conneting Element
28
国土技術政策総合研究所
3. Building Simple Project (Practice)
Conneting Element
接続要素を選択した状態で、
「1次元配列時系列情報」を
選択し、ダブルクリックします
29
NILIM
3. Building Simple Project (Practice)
Conneting Element
30
NILIM
3. Building Simple Project (Practice)
Connecting Element
31
NILIM
3. Building Simple Project (Practice)
Connecting Element
32
NILIM
3. Building Simple Project (Practice)
Connecting Element
33
NILIM
3. Building Simple Project (Practice)
Monitor Output
34
NILIM
3. Building Simple Project (Practice)
Model Check
Click Model check
Errot
35
NILIM
3. Building Simple Project (Practice)
Setting Simulation Period
※2007/7/7 10:00~2007/7/10 23:00
36
NILIM
3. Building Simple Project (Practice)
Execution of Project
37
NILIM
3. Building Simple Project (Practice)
Save Project
38