6th National Conference on Safety Engineering & HSE Management

ag
em
en
t
NFPA 20
1
M
an
1
2013
) NFPA 20
2010
H
(
&
.
SE
.
ne
er
in
g
.
overdesign
y
En
gi
150
ce
on
Sa
fe
t
.
er
en
.
.
.
:
io
na
l
Co
nf
.
6t
h
N
at
3
.
1
Rated Capacity
2
ag
em
en
t
.
.
M
an
.
.
2010
H
.
ne
er
in
g
&
2010
.
SE
NFPA 20
.
[1] 2013
.
2-8-4
.
2010
2013 2010
([1]) 1-8-4
2
«
4.1
:
150
(
)
»
6t
h
N
at
io
na
l
.
Co
nf
er
en
ce
on
Sa
2013
NFPA 20
y
En
gi
Fire Water Demand
.
fe
t
.
4
2
4.8.1 A centrifugal fire pump for fire protection shall be selected so that the greatest single demand for any fire
protection system connected to the pump is less than or equal to 150 percent of the rated capacity (flow) of the
pump. [1]
(
150)
1.5
) 1.5
(1
[1] NFPA 20
.
)
en
.2-8-4
M
an
(1.4
.1
.2
.3
4
.
ne
er
in
.
g
.
&
H
.
ag
em
3
.
SE
:
t
.
NFPA 20
NFPA 20
gi
1.5
En
.
.
on
Sa
fe
t
.
1.4 0.9
y
.
en
ce
.
Co
nf
er
4.2
)
6t
h
N
at
io
na
l
.
3
4
“fire water demand” or “fire water requirement”
Oversized
.
(
.
.
150
ag
em
en
t
.
.
)
.
2.5
fe
t
.
ce
en
er
.
0.25
io
na
l
at
N
6t
h
.
0.17
.
6
Co
nf
.
)
H
60
on
90
(
.
Sa
250
.
y
.
)
&
25
100
g
(
150
ne
er
in
.[4] 5
(
3
gi
.
.
En
20
5
.1
SE
M
an
.
.2
.
(10
) 20
[9]: Sec 5.1.1.The equipment (including auxiliaries) covered API 610 shall be designed and constructed for a
minimum service life of 20 years (excluding normal wear parts as identified in Table 18) and at least 3 years of
uninterrupted operation. It is recognized that these requirements are design criteria and that service or duty severity,
misoperation or improper maintenance may result in a machine failing to meet these criteria.
.
en
M
an
)
.
SE
(
ag
em
.
t
.
.
/
(HR QR)
gi
[1])
Q0)
y
En
(2-8-4
140 90
(H0=Hmax
2.7
ne
er
in
g
&
H
.
.
fe
t
ce
on
Sa
-4
-5
150
.
Co
nf
er
en
6
/
6t
h
N
at
io
na
l
.
6
Fire Protection
.1
.
:
-1
-2
-3
/
5
8
7
.
(
(
en
t
.
.
)
120)
ag
em
)
M
an
(1
.
9
&
H
SE
.
10
.
60
3
En
50
0.9
2
[11] NPCS [10] IPS
on
Sa
fe
t
[12] Total
100
y
NFPA
.
gi
.
1.4
ne
er
in
g
6
.
.
6t
h
Co
nf
N
at
io
na
l
.
50
er
en
ce
100
.
7
Operating Point
Supply Curve
9
Demand Curve
10
configuration
8
100
.[12 11 10]
([10] IPS
)
40 33
60
)
([12] Total
3
)
.[12]
[1] NFPA 20
150
listed
12
.
(2 .( .1-2-6
[1])
.( .2-2-6
NFPA
.
(
90
ne
er
in
gi
fe
t
y
En
6.1
on
Sa
.
.
.
)
6t
h
N
at
io
na
l
Co
nf
er
en
ce
Fire Pump
(
11
shutoff head
Listed
13
Jockey Pump or Pressure Compensating Pumps
12
en
)
g
90
[1])
140
13
.
ag
em
140
.
M
an
(1
SE
150
11
t
.
&
65
4
H
6
.
.
.
6t
h
io
na
l
at
N
ce
en
er
Co
nf
on
5
14
Set Point
.
.
g
&
.
14
ne
er
in
gi
En
.
y
fe
t
4
Sa
.
(
200
SE
H
.
)
.
.
.
en
ag
em
M
an
t
NFPA
(
)
.
.
.
6.2
.
(
( )
)
ag
em
en
t
.
( )
M
an
.
SE
/
ne
er
in
g
&
H
)
140 90
)
.
«
»
8
Co
nf
er
NFPA® 20, Standard for the Installation of Stationary Pumps for Fire Protection, ed. 2013.
Stationary Fire Pumps Handbook, Edited by Chad R.W. Duffy, fourth edition, ed. 2013.
NFPA® 20, Standard for the Installation of Stationary Pumps for Fire Protection, ed.2010.
NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection, ed. 2007.
NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection, ed. 1999.
NFPA 20, Standard for the Installation of Centrifugal Fire Pumps, ed.1996.
NFPA 101, Life Safety Code, ed. 2009.
Fire Protection Handbook, NFPA ed. 2003.
API STD 610, Centrifugal Pumps for Petroleum, Petrochemical and N.G. Industries, 9th ed. 2003.
6t
h
N
at
io
na
l
[1].
[2].
[3].
[4].
[5].
[6].
[7].
[8].
[9].
en
ce
on
7
«
Sa
fe
t
y
En
gi
.
.
[10]. IPS-E-SF-220, ed. 1393.
[11]. NPCS-E-CI…
[12]. Total GS EP SAF 321: Fire Pump Stations and Fire Water Mains, ed. 2011.
»
9