References Project JW Marriott Venice Resort & SPA Venice Italy Hotel Meliá Vienna Vienna Austria Lanserhof Tegernsee Waakirchen Germany Scope of performance Lots On behalf of the Aareal Bank AG, hagenauer GmbH was carrying out the complete interior construction of 266 guest rooms, suites and public areas on Sacca Sessola, an island in the Venetian Lagoon. carpenetry textiles decoration lighting loose furniture dry walling screed paint works natural stone Complete FF&E furnishings for 242 Standard Rooms, six Honeymoon Suites, four Suites, one Presidential Suite plus the entire Public Areas - two restaurants, three bars, Conference Rooms, three kitchens - as well as for the total of the Back of House area carpentry textiles decoration lighting loose furniture OS&E kitchen installations Interior fittings for 70 guestrooms dry walling interior doors carpentry glass works Value tiling metal works parquet carpets ~ 13 Mio. € Client La Sessola S.r.L. Via Mercadante 12/14 00198 Rom Italy Contact: Wilhelm Wüst +49 611 348 2791 ~ 5,3 Mio. € VIENNA DC Tower 1 Liegenschaftsbesitz GmbH Donau-City-Straße 1 1220 Vienna Austria Contact Dipl.-Ing. Thomas Jakoubek ~ 1,8 Mio. € Lanserhof Marienstein GmbH & Co. KG Gut Steinberg 1-4 83666 Waakirchen Germany Contact Michael Scheu T +43 (1) 513 47 74-0 Nils Behrens T +49 40 320 88 32 20 Page 1 of 14 Project Lindner Congress Hotel Düsseldorf Düsseldorf Germany Scope of performance Lots Interior fittings for 90 demolition guestrooms including corridors dry walling tiling paintworks flooring Value carpentry electrical installations sanitary installations lighting ~ 3,0 Mio. € Client Lindner Rheinstern GmbH & Co KG Emanuel-Leutze-Straße 17 40547 Düsseldorf Germany Contact Dirk Dietrich T +49 211 5997 1389 Siegfried Wenzelmann T +49 211 5997-337 25hours Hotel Bikini Berlin Complete fittings and interior fittings for 127 guestrooms and 22 suites, public areas (checkBerlin in, conference areas, wellness Germany area including sauna, restaurant, kitchen and bar) and back-of-house area (office, staff rooms, etc.) dry walling ventilation spaces and double floors screed industrial floor finishing sealing works plasterworks artificial stone works tiling metal works mirrors / glass paintworks paperhanging flooring carpentry doors fire protection doors ventilation / air conditioning sanitary installations sanitary objects ~ 6,0 Mio. € Bayerische Hausbau GmbH & Co. KG Niederlassung Berlin Hardenbergplatz 2 10623 Berlin Germany screed dry walling concrete works tiling paintworks flooring doors carpentry locking system ~ 2,1 Mio. € Ibing Immobilien GmbH & Co. KG Am Töllershof 31 40489 Düsseldorf Germany Refurbishment of approx. 6.000 m² industrial surface, transformation into a lifestyle hotel, implementation of a design concept INNSIDE by Melia Düsseldorf Düsseldorf Germany Transformation of an office building (Colorium) into a 4* design hotel. Interior fittings for guestrooms and public areas (check-in, bar, breakfast room and kitchen) Contact Kai 18 Projekte GmbH Oliver Ziehe René Lück T +49 211 - 540 750 0 Page 2 of 14 Project Büropark Mollstraße 1 Berlin Germany Generator Hostel Berlin Mitte Berlin Germany Doubletree by Hilton Luxembourg Luxemburg Scope of performance Lots Value Core reconstruction of an office building including facade works and building equipment (HVACR). 10.000 m² useable surface, excluding basement, consisting of a 10 storey high rise building and a 3-storey low rise building demolition shell works sealing works (roofs) facade works windows exterior doors outdoor facilities screed plaster and stucco works dry walling fire protection facilities tiling concrete works paintworks flooring fitting works electrical installations telecommunication circuit facilities sanitary installations ventilation and air conditioning facilities and appliances lifts ~ 13,5 Mio. € Core reconstruction and transformation of an office building into a design hostel. Fitting and furnishing for guestrooms and public areas (reception, bar, lobby, café, breakfast room and kitchen) demolition sealing works (basement) statics structural works masonry works exterior windows screed dry walling sealing works tiling electrical installations heating / ventilation sanitary installations flooring paintworks doors carpentry loose furniture lighting lift facilities facade works outdoor installations advertising structures signage ~ 8,0 Mio. € Refurbishment of guestrooms and 6 suites and public areas (lobby, reception, business centre, restaurant, bar, meeting areas) demolition paintworks natural stone tiling flooring carpentry loose furniture textile decoration sanitary installations electric installations in an operational hotel Client Mollstraße 1, Objektgesellschaft mbH c/o Suprema Immobilienverwaltung GmbH Rosenthaler Straße 13 10119 Berlin Germany Contact Suprema Immobilienverwaltung GmbH Dipl.-Ök. Janet Greulich T +49 30 612 86 662 Patron Mitte Properties GmbH Generator Hostels Storkowerstraße 160 10407 Berlin Germany Contact Generator Hostels LTD Tarna Schmidt T +49 30 417 24044 ~ 6,0 Mio. € Westmont Hospitality Group Europe SW19 4DT London United Kingdom Contact Westmont Hospitality Group Europe Mitchell Binks T +44 208 944 6666 Page 3 of 14 Project Steigenberger Hotel Bad Neuenahr Germany Hilton Munich Park Hotel Munich Germany Panoramahotel Oberjoch Germany Scope of performance Lots Value Interior fittings for 63 guestrooms including bathrooms (7 suites, 56 rooms), conference rooms an corridors, public areas, hotel hall including lobby, check-in and bar demolition masonry windows screed dry walling natural stone tiling paintworks flooring doors carpentry loose furniture textile decoration decorative lighting glass plates sanitary installations ~ 2,6 Mio. € Refurbishment of guestrooms and suites, public areas, lobby, restaurants, bar, executive lounge, ball room and kitchen demolition screed dry walling tiling paintworks flooring doors carpentry loose furniture textile decoration electrical installations lighting sanitary installations ~ 8,0 Mio. € carpentry furniture textile decoration lighting sanitary objects sanitary accessories Interior fittings for 113 guestrooms and suites plus public areas Client Steigenberger Hotels AG Lyonerstrasse 40 60528 Frankfurt / Main Germany Contact Steigenberger Hotels AG Dr. Michael Schicker T +49 69 665 646 39 Hilton München Park Zweigniederlassung der Hilton International Co. Am Tucherpark 7 80538 München Germany Contact Hilton München Park Zweigniederlassung der Hilton International Co. Christoph Glaser T +49 89 384 523 00 ~ 1,5 Mio. € Wellnesshotel Oberjoch GmbH Salzstraße 10 87435 Kempten Germany Contact BreFa Bauunternehmung GmbH Gerhard Breher T +49 170 61 38 07 5 Page 4 of 14 Project Hotel Giardino Mountain St. Moritz Switzerland Hotel Austria Trend Park Royal Palace Vienna Austria Scope of performance Refurbishment of 78 guestrooms and suites including bathrooms Interior fittings for 232 guestrooms and suites including bathrooms and public areas Lots Value screed dry walling natural stone tiling plasterworks glass elements paintworks flooring doors carpentry furniture lighting textile decoration accessories sanitary items sanitary accessories ~ 4,5 Mio. € sealing works natural stone tiling paintworks paperhanging flooring doors carpentry loose furniture textile decoration ~ 5,0 Mio. € Client Centaurium Immobilien AG Schulstrasse 27 2572 Möringen Switzerland Contact Hotel Giardino Mountain Philippe Frutiger T +41 91 785 88 88 Mariahilferstrasse 212 Verwertungs GmbH Favoritenstrasse 7/2 1040 Wien Austria Contact PD Projektmanagement GmbH Karl Resch T +43 67 655 55 99 0 Mövenpick Hotel Lausanne Refurbishment of 72 guestrooms including bathrooms, corridors, Lausanne staircases, meeting rooms an Switzerland public bathrooms dry walling sealing works paintworks natural stone tiling flooring doors carpentry loose furniture textile decoration lighting ~ 2,5 Mio. € CLAIR AG MAS Immobilienmanagement Seestrasse 1 6330 Cham Switzerland Contact CLAIR AG MAS Immobilienmanagement Tobias Achermann T +41 41 783 8052 Page 5 of 14 Project Apart-Hotel operated by Hilton Zürich Zurich Switzerland Scope of performance Montreux Switzerland Value ~ 0,38 Mio. € Refurbishment of 67 demolition guestrooms including corridors flooring loose furniture textile decoration lighting Marriott Renaissance Paris Refurbishment of 100 guestrooms and 20 suites Le Parc Trocadero Hôtel including corridors, lift-landings, staircases, public areas, hotel Paris hall, check-in, bar, concierge France and office accommodations Fairmont Le Montreux Palace Lots Phase 3: Refurbishment of 41 guestrooms and 8 suites Phase 1+2: Refurbishment of 80 guestrooms and 23 suites including bathrooms and corridors Client Westmont Hospitality Group - Europe SW19 4DT London United Kingdom Contact Westmont Hospitality Group - Europe Mitchell Binks T +44 208 944 6666 demolition structural works sealing works steel construction dry walling doors / fire protection doors handicapped accessible furnishings stucco works natural stone n tiling paintworks flooring fitting works carpentry mirrors / glass furniture fittings furniture textile decoration electrical installations lighting sanitary installations fire protection sprinkler system alarm system ventilation / air conditioning ~ 5,6 Mio. € demolition dry walling stucco works paintworks fitting works doors flooring mirrors / glass furniture electrical installations lighting textile decoration ~ 8,4 Mio. € Westmont Hospitality Group - Europe SW19 4DT London United Kingdom Contact Westmont Hospitality Group - Europe Mitchell Binks T +44 208 944 6666 Fairmont Le Montreux Palace Grand Rue 100 1820 Montreux Switzerland Contact Fairmont Le Montreux Palace Michael Smithuis T +41 219 621 000 in an operational hotel Page 6 of 14 Project Hilton Stockholm Slussen Stockholm Sweden Scope of performance Lots Refurbishment of 178 demolition guestrooms including corridors paintworks plus executive lounge flooring carpentry mirrors / glass in an operational hotel Value loose furniture textile decoration electrical installations lighting ~ 2,8 Mio. € Client Hilton Stockholm Slussen Guldgränd 8 Box 15270 10465 Stockholm Sweden Contact Hilton Stockholm Slussen Mr Peter Eriksson T +46 8517 353 00 Hilton Berlin Hotel am Gendarmenmarkt Berlin Germany Refurbishment of public areas (lobby, restaurant, executive lounge, meeting rooms) plus 597 guestrooms and suites including corridors in an operational hotel Copenhagen Marriott Hotel Refurbishment of the reservation back office, checkin, lobby, restaurant and bar Copenhagen including „front-cooking area“ Denmark demolition structural works screed dry walling natural stone tiling paintworks flooring fitting works carpentry mirrors / glass furniture textile decoration electrical installations lighting ventilation / air conditioning demolition dry walling natural stone n tiling paintworks paperhanging flooring doors carpentry furniture fittings upholstered furniture loose furniture textile decoration electrical installations kitchen technology and installations technical and decorative lighting fire protection ~ 13,1 Mio. € Domhotel GmbH Mohrenstrasse 30 10117 Berlin Germany Contact Hilton Berlin Zweigniederlassung der Hilton International Co. Ronald van Weezel T +49 30 20 23 40 00 ~ 1,2 Mio. Marriott Copenhagen Hotelinvest Kalvebod A/S / Kalvebod Brygge 5 1560 Copenhagen Denmark Contact Axios Hospitality Real Estate Mr. Guy Greer T +44 208 879 5140 Page 7 of 14 Project Scope of performance Radisson Blu Ambassador Refurbishment of public areas (lobby, hotel hall, bar, Hotel Paris conference rooms, fitness studio, executive lounge and Paris board rooms) France in an operational hotel The Ritz Carlton, Vienna Vienna Austria Mövenpick Hotel Egerkingen Egerkingen Switzerland Interior fittings for 177 guestrooms, 29 suites and 1 presidential suite including bathrooms and corridors Refurbishment of 95 guestrooms and suites including corridors plus board rooms and fitness centre Lots Value demolition dry walling natural stone tiling paintworks flooring carpentry mirrors / glass furniture textile decoration electrical installations lighting sanitary installations ~ 1,5 Mio. € dry walling sealing works natural stone paintworks flooring fitting works carpentry mirrors / glass furniture textile decoration electrical installations lighting sanitary installations ~ 11,0 Mio. € demolition structural works dry walling natural stone tiling paintworks flooring fitting works carpentry mirrors / glass furniture textile decoration electrical installation lighting ventilation / air conditioning ~ 1,82 Mio. € Client Westmont Hospitality Group SW19 4DT London United Kingdom Contact Westmont Hospitality Group Mitchell Binks T +44 208 944 6666 BAI Bauträger Austria Immobilien GmbH 1020 Wien Austria Contact BAI Bauträger Austria Immobilien GmbH DI Robert Hahn T +43 1 33 146 45 20 Mövenpick Hotel Egerkingen Höhenstrasse 12 4622 Egerkingen Switzerland Contact Chandler KBS Baukonstruktion & Kostenmanagement Dane Hutchinson T +49 211 992 101 Page 8 of 14 Project Hilton Munich Park Hotel Munich Germany Scope of performance Refurbishment of check-in area, ball room, conference rooms and interior fittings for a new fitness centre Lots demolition dry walling tiling paintworks fitting works Value flooring carpentry textile decoration fire protection doors ~ 1,03 Mio. € Client Hilton München Park Zweigniederlassung der Hilton International Co. Am Tucherpark 7 80538 München Germany in an operational hotel Contact Hilton Berlin Zweigniederlassung der Hilton International Co. Kurt Marosky T +49 30 2023 1232 Mock-up Room Starwood Hotel Prince de Galles Mock-up guestroom Paris France Hilton Zürich Airport Hotel Zurich Switzerland screed dry walling stucco works paintworks flooring doors carpentry mosaic displays mirrors / glass GLEEDS 7, rue d’Artois 75008 Paris France Contact GLEEDS David Grant T +33 40 38 64 24 3 phase refurbishment of 259 guestrooms including bathrooms and corridors, executive lounge, meeting rooms and restaurant in an operational hotel demolition dry walling natural stone tiling paintworks flooring carpentry loose furniture textile decoration electric installation lighting sanitary installations heating / air conditioning ~ 6,3 Mio. € Elba I Swiss GmbH Hohenbühlstrasse 10 8152 Opfikon Switzerland Contact: Chandler KBS Baukonstruktion & Kostenmanagement Dane Hutchinson +49 211 992 101 Page 9 of 14 Project Hotel Breidenbacher Hof Düsseldorf, a Cappella Hotel Scope of performance Lots Interior fittings for 79 guestrooms, 6 junior suites, 8 executive suites, 2 presidential suites and public areas dry walling stucco works natural stone paintworks Value flooring doors carpentry ~ 6,5 Mio. € Düsseldorf Germany Client Chandler KBS Baukonstruktion & Kostenmanagement Königsallee 11 40212 Düsseldorf Germany Contact Chandler KBS Baukonstruktion & Kostenmanagement Craig Maunder T +49 211 992 101 The Dolder Grand Zürich Zürich Switzerland Interior fittings for 114 guestrooms and junior suites including corridors dry walling stucco works natural stone paintworks flooring carpentry fire protection elements for corridors ~ 10,5 Mio. € The Dolder Grand Kurhausstrasse 65 8032 Zürich Switzerland Contact Itten & Brechbühl AG Kuno Zimmermann T +41 796 890 892 Grand Hôtel de Bordeaux Bordeaux France Interior fittings for 150 guestrooms, public areas and shopping arcade dry walling sealing works stucco works natural stone paintworks flooring doors carpentry furniture textile decoration lighting ~ 13,5 Mio. € SNC Paris Le Havre 33000 Bordeaux France Contact HF Architecture Henrich Fitger T +33 671 74 96 47 Page 10 of 14 Project Hilton Dresden Hotel Dresden Germany Scope of performance Refurbishment of executive and business floors: 311 guestrooms including corridors, construction of an executive lounge including business centre and of a conference centre Lots demolition dry walling tiling paintworks flooring Value doors carpentry textile decoration lighting ~ 2,67 Mio. € Heidelberg Germany Refurbishment of 232 demolition guestrooms including corridors dry walling natural stone tiling paintworks flooring Hilton Dresden An der Frauenkirche 5 01067 Dresden Germany Contact Chandler KBS Baukonstruktion & Kostenmanagement Dane Hutchinson T +49 211 992 101 in an operational hotel Crowne Plaza Heidelberg Client doors carpentry furniture textile decoration electric installations lighting ~ 3,0 Mio. € Limnä Hotelbetriebs GmbH & Co. Verwaltungs KG Kurfürstenanlage 1 69221 Heidelberg Germany Contact Westmont Hospitality Group Mitchell Binks T +44 208 944 6666 Luxury Apartments Divonne-les-Bains France Turnkey construction of 3 earthworks residential buildings comprising building shell 19 luxury apartments carpentry / roofing exterior windows screed dry walling sealing works natural stone, tiling electrical installations sanitary installations heating / ventilation metal works flooring paintworks doors wooden staircases carpentry fixtures sanitary objects elevators facade works garages outdoor facilities ~ 7,8 Mio. € Chandler KBS Baukonstruktion & Kostenmanagement Königsallee 11 40212 Düsseldorf Germany Contact Chandler KBS Baukonstruktion & Kostenmanagement Craig Maunder T +49 211 992 101 Page 11 of 14 Project Grand Elysée Hotel Hamburg Hamburg Germany "Pride of Hawaii" Cruise liner Norwegian Cruise Line Scope of performance Lots Value screed dry walling sealing works stucco works natural stone New construction of an annexe tiling building plus refurbishment of paintworks existing areas flooring fitting works doors / fire protection doors carpentry mobile partition walls loose furniture textile decoration lighting ~ 11,7 Mio. € Cruise liner fittings for the areas Italian Restaurant, Cigar Lounge, Champagne Bar, Tepanyaki Bar, Beer Bar doors carpentry metal ceilings fire-retarding sealing ~ 1,5 Mio. € Refurbishment of 230 guestrooms and suites including public areas, ball room, wellness area dry walling natural stone tiling fitting works Cruise liner Norwegian Cruise Line Papenburg Germany Atacasa Grundstücksver-waltungsgesellschaft mbH & Co 55252 Wiesbaden Germany Contact Anwaltskanzlei Costard Dr. Andreas Costard T +49 40 303 88 80 Meyer Werft GmbH Postfach 1555 26855 Papenburg Germany Contact Meyer Werft GmbH Hannes Wüstnienhaus T +49 160 471 8541 Papenburg Germany "Norwegian Jewel" Client Cruise liner fittings for the areas French Restaurant, Cigar Lounge, Champagne Bar, Martini Bar, Beer Bar dry walling natural stone tiling fitting works doors carpentry metal ceilings fire-retarding sealing ~ 1,4 Mio. € Meyer Werft GmbH Postfach 1555 26855 Papenburg Germany Contact Meyer Werft GmbH Hannes Wüstnienhaus +49 160 471 8541 Page 12 of 14 Project Jewel of the Seas Scope of performance Ship-Refurbishment for the area Sportsbar Cruise liner Royal Caribbean International Lots dry walling natural stone tiling fitting works Value doors carpentry metal ceilings fire-retarding sealing ~ 500 T€ Ship-Refurbishment for the area Sportsbar dry walling natural stone tiling fitting works doors carpentry metal ceilings fire-retarding sealing Refurbishment in 3 phases of 493 guestrooms including corridors, public areas (lobby, reception, business centre) plus construction of an executive lounge in an operational hotel demolition dry walling tiling paintworks flooring doors carpentry lighting technical facility equipment - HVAC Royal Caribbean International ~ 520 T€ Papenburg Germany Hilton München City Hotel Munich Germany Meyer Werft GmbH Postfach 1555 26855 Papenburg Germany Contact: Meyer Werft GmbH Hannes Wüstnienhaus +49 160 471 8541 Papenburg Germany Serenade of the Seas Cruise liner Client ~ 4,3 Mio. € Meyer Werft GmbH Postfach 1555 26855 Papenburg Germany Contact: Meyer Werft GmbH Hannes Wüstnienhaus +49 160 471 8541 Hilton International Germany GmbH Zweigniederlassung München Rosenheimer Str. 15 81667 München Germany Contact Chandler KBS Baukonstruktion & Kostenmanagement Ulf Oebius +49 211 992 101 Page 13 of 14 Project Deutsche Lufthansa First Class Terminal Frankfurt Airport Frankfurt Germany Hilton Düsseldorf Hotel Düsseldorf Germany Scope of performance Lots Value Interior fittings for the customer dry walling area of the first class lounge, sealing works approx. 1.800 m² natural stone tiling paintworks flooring fitting works doors / fire protection doors carpentry electrical installations lighting textile decoration metal ceiling technical equipment ~ 2,5 Mio. € Refurbishment of 375 guestrooms and suites including corridors, public areas (lobby, reception, bar, restaurant, wellness area, ball room) flooring doors / fire protection doors carpentry textile decoration ~ 8,02 Mio. € in an operational hotel demolition masonry dry walling natural stone tiling paintworks Client Deutsche Lufthansa AG 50679 Köln Germany Contact Architekten K2 Klaus Kampmann T +49 241 989 033 11 Hilton International Germany GmbH Zweigniederlassung Düsseldorf Georg-Glock-Str. 20 40474 Düsseldorf Germany Contact Chandler KBS Baukonstruktion & Kostenmanagement Andreas Schulz T +49 211 992 101 Page 14 of 14
© Copyright 2024 ExpyDoc