Price List ONTRAS (1. January 2016)

Price list for Network Access
ONTRAS Gastransport GmbH
Valid from 01 January 2016
ONTRAS Gastransport GmbH
price list
for network access
Valid from 01 January 2016
Entry and exit tariffs are preliminary in accordance with
section 20 paragraph 1 sentence 2 EnWG.
This English translation of the price list for network access of
ONTRAS Gastransport GmbH shall not be legally binding and is for convenience only.
The legally binding access to the network shall only be granted on the basis of the German
version of the price list for network access.
1. Charge
The payable capacity charge is the result of following formulas for each specific capacity.
a) For free allocable capacity (FZK):
E = K ∙ d ∙ fuj ∙ EK
b) For interruptible capacity:
E = K ∙ d ∙ fuj ∙ EK ∙ futb
c) For firm dynamically allocable capacity (DZK) at exit point Deutschneudorf:
E = K ∙ d ∙ fuj ∙ EK ∙ 0.93
d) For conditional firm, freely allocable capacity (bFZK) at storage facilities:
E = K ∙ d ∙ fuj ∙ EK ∙ 0.93
Metering charge, accounting charge, biogas redistribution levy, market area conversion
charge and metering operating charge were calculated - without reference to these formulas - per day according to the appendix. No short-term factors for these tariff components
are estimated.
Variable
E
…
K
…
d
…
fuj
…
EK …
futb …
Meaning
Capacity charge in cent
Capacity
Contract period in days
Short-term multipliers (see article 2)
Specific basic capacity tariff per day (see appendix) in cent/kWh/h/d
Factor for the probability of interruption per network point (see appendix)
2. Short-term multipliers
(in accordance with Ordinance BK9-14-608 of Bundesnetzagentur from 24.03.2015)
Contract period in days
from
until
0
28
90
365
27
89
364
∞
Price list of ONTRAS Gastransport GmbH
Version: 9.1
Type
Day
Month
Quarter
Year
Short-term multiplier
fuj
1.4
1.25
1.1
1.0
Page 2 / 7
Last Update: 05 November 2015
Valid from: 01 January 2016
3. Tariff for the Nomination Replacement Procedure
The balancing group manager shall pay the following charges for the Nomination Replacement Procedure. Contractual details in section 6 of the Supplementary Terms and
Conditions of Trade of ONTRAS.
a)
One-off set-up charge
Service
Charge in EUR
Setting-up per balancing group contract
b)
2,000.00
Monthly charge
Service
Charge in EUR
Operation charge per balancing group contract
Price list of ONTRAS Gastransport GmbH
Version: 9.1
Page 3 / 7
1,000.00
Last Update: 05 November 2015
Valid from: 01 January 2016
Appendix: entry and exit tariffs for firm and interruptible capacity
Entry and exit tariffs include costs for implementation and operation of the platform for primary and secondary capacity in accordance with section 12 paragraph 1 sentence 2, paragraph 2 sentence 3 GasNZV.
1. Tariffs for entry capacities (without storages)
Entry points
Cross border points
Deutschneudorf
Kamminke
Lasow
Gubin
Market area interconnection point
Steinitz
Biogas entry points
BGA Altenhof
BGA Barleben
BGA Dargun
BGA Forst
BGA Gordemitz
BGA Gröbern
BGA Gröden
BGA Güstrow
BGA Haßlau
BGA Jabel
BGA Kodersdorf
BGA Lehma
BGA Leizen
BGA Neuburg-Steinhausen
BGA Neudorf
BGA Sachsendorf
BGA Satuelle
BGA Schöpstal
BGA Stralsund
BGA Thierbach
BGA Thronitz
BGA Wolfshagen
BGA Zernin
PtG-Anlage Falkenhagen
PtG-Anlage Prenzlau
Downstream-upstream flow points
NKP-Zone NBB Rückspeisung Biogas
NKP-Zone E.DIS Rückspeisung Biogas
Other entry points
ONTRAS-MITGAS-Netz Bernburg-Peißen
Salzwedel Entry
Price list of ONTRAS Gastransport GmbH
Version: 9.1
Netpoint
ID
Tariff zone
Factor
Basic
capacity tariff
(E K )
for interruptible
capacity
(f utb )
ct/(kWh/h)/d
-
12304
10004
469
2494
Entry
Entry
Entry
Entry
1.23
1.23
1.23
1.23
0.90
0.90
0.89
0.90
770
Entry
1.23
0.90
6073
6009
5798
6117
6010
6116
6011
5731
5830
6097
6129
6004
6012
6096
6013
6014
6015
5827
6016
6130
6017
6098
6039
6081
6119
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
Entry biogas
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
6085
6090
Entry biogas
Entry biogas
0.00
0.00
0.90
0.90
2851
6003
Entry storage
Entry
0.615
1.23
0.90
Page 4 / 7
Last update: 05 November 2015
Valid from: 01 January 2016
2. Tariffs for exit capacities (without storages)
Exit points
Cross border points
Deutschneudorf
Gubin
Kamminke
Lasow
Market area interconnection point
Steinitz
Network connection points
NAP Ahrensfelde
NAP Bernburg
NAP Bitterfeld GuD
NAP Chemnitz
NAP Coswig II
NAP Dallmin
NAP Dieselstraße
NAP Dresden
NAP Eigenverbrauch UGS Bad Lauchstädt
NAP Eigenverbrauch UGS Bernburg
NAP Eigenverbrauch UGS Buchholz
NAP Eigenverbrauch UGS Kirchheilingen
NAP Eisenhüttenstadt Zone
NAP Frömmstedt
NAP Gräfenhainichen
NAP Hennigsdorf II
NAP HKW/HW Schwerin Zone
NAP Kirchmöser
NAP Lenz
NAP Ludwigsfelde
NAP Marienehe
NAP Melamine Piesteritz
NAP Merseburg Zone
NAP Mosel
NAP Obertopfstedt
NAP Piesteritz
NAP Radsystem Mosel
NAP Salzwedel
NAP Schwarze Pumpe II
NAP Schwarzheide I
NAP Schwarzheide II
NAP Thyrow
NAP Torgau
NAP Trotha
NAP Wolfen Areal A
NAP Wolfen II
NAP Wolfen Kraftwerk
Commercial exit zones
NKP-Zone Avacon HDN
NKP-Zone DOW Böhlen
NKP-Zone DOW Schkopau
NKP-Zone DREWAG Netz
NKP-Zone E.DIS
NKP-Zone EMS
NKP-Zone EMS 2
NKP-Zone ENSO Netz
NKP-Zone EV Schwarze Elster
NKP-Zone EVG
NKP-Zone EVIP
Price list of ONTRAS Gastransport GmbH
Version: 9.1
Netpoint
ID
Tariff zone
Factor
Basic
capacity tariff
(E K )
for interruptible
capacity
(f utb )
Metering
charge
Accounting
charge
Specific biogas
redistribution levy
Market area
conversion
charge
Metering
operation
charge 1
ct/(kWh/h)/d
-
ct/(kWh/h)/d
ct/(kWh/h)/d
ct/(kWh/h)/d
ct/(kWh/h)/d
EUR/d
12304
2494
10004
469
Zone 2
Zone 1
Zone 3
Zone 1
1.00
1.24
1.59
1.24
0.89
0.90
0.90
0.89
0.0016
0.0016
0.0016
0.0016
0.0107
0.0107
0.0107
0.0107
-
0.02363
0.02363
0.02363
0.02363
-
770
Zone 2
1.00
0.89
0.0016
0.0107
-
0.02363
-
5789
1176
2493
6133
1466
6108
5125
1429
5775
5774
5773
5772
41002
887
672
1131
5802
1275
1726
6099
5266
6000
41041
36
885
5760
5832
5120
6042
363
1040
5791
5009
2132
5582
1869
5581
Zone 1
Zone 2
Zone 2
Zone 2
Zone 1
Zone 2
Zone 2
Zone 1
Zone 2
Zone 2
Zone 2
Zone 2
Zone 1
Zone 2
Zone 2
Zone 1
Zone 3
Zone 2
Zone 1
Zone 1
Zone 3
Zone 2
Zone 2
Zone 2
Zone 2
Zone 2
Zone 2
Zone 2
Zone 1
Zone 1
Zone 1
Zone 1
Zone 2
Zone 2
Zone 2
Zone 2
Zone 2
1.24
1.00
1.00
1.00
1.24
1.00
1.00
1.24
1.00
1.00
1.00
1.00
1.24
1.00
1.00
1.24
1.59
1.00
1.24
1.24
1.59
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.24
1.24
1.24
1.24
1.00
1.00
1.00
1.00
1.00
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
118.17
61.30
57.26
30.65
12.88
12.88
61.30
92.41
38.64
25.76
38.64
12.88
61.30
12.88
12.88
43.53
157.20
57.26
12.88
56.41
114.52
12.88
92.41
12.88
12.88
92.41
12.88
70.14
43.53
12.88
57.26
135.94
61.30
43.53
25.76
30.65
30.65
41010
6123
6124
41001
41013
41009
6103
41034
41026
41024
6030
Zone 2
Zone 2
Zone 2
Zone 1
Zone 3
Zone 2
Zone 2
Zone 1
Zone 1
Zone 2
Zone 2
1.00
1.00
1.00
1.24
1.59
1.00
1.00
1.24
1.24
1.00
1.00
-
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
-
Page 5 / 7
-
Last update: 05 November 2015
Valid from: 01 January 2016
Exit points
NKP-Zone EW Bautzen
NKP-Zone EWA
NKP-Zone EWE Netz
NKP-Zone EWE Wendorf
NKP-Zone GSW Grimmen
NKP-Zone GV Eisenhüttenstadt
NKP-Zone GV Görlitz
NKP-Zone GV Greifswald
NKP-Zone GV Vorpommern Netz
NKP-Zone Halle Netz
NKP-Zone HanseWerk AG
NKP-Zone inetz 1
NKP-Zone ISB Arneburg
NKP-Zone Köthen Energie Netz
NKP-Zone MITNETZ Gas 1
NKP-Zone MITNETZ Gas 2
NKP-Zone MITNETZ Gas HD
NKP-Zone NBB 1
NKP-Zone NBB 2
NKP-Zone NBB 3
NKP-Zone NBB 4
NKP-Zone Netz Leipzig
NKP-Zone Netzgesellschaft Potsdam
NKP-Zone NG Schwerin
NKP-Zone PVU
NKP-Zone Redinet Zeitz
NKP-Zone SÜW Lübben
NKP-Zone SÜW Luckau-Lübbenau
NKP-Zone SW Bernau
NKP-Zone SW Burg Energienetze
NKP-Zone SW Döbeln
NKP-Zone SW Elbtal
NKP-Zone SW Finsterwalde
NKP-Zone SW Freiberg
NKP-Zone SW Güstrow
NKP-Zone SW Haldensleben
NKP-Zone SW Ludwigsfelde
NKP-Zone SW Lutherstadt Wittenberg
NKP-Zone SW Magdeburg
NKP-Zone SW Meißen
NKP-Zone SW Neustrelitz
NKP-Zone SW Ribnitz-Damgarten
NKP-Zone SW Riesa
NKP-Zone SW Rostock
NKP-Zone SW Senftenberg
NKP-Zone SW Spremberg
NKP-Zone SW Stendal
NKP-Zone SW Wittenberge
NKP-Zone SW Zittau
NKP-Zone SWS Netze
NKP-Zone TEN
NKP-Zone TW Naumburg
NKP-Zone VB Hoyerswerda
NKP-Zone ZEV
1
Netpoint
ID
Tariff zone
6043
41028
41029
6057
6084
6044
41039
6056
5718
41025
41019
41022
6045
5084
41042
41043
6126
41003
41077
41078
6074
41065
41031
41027
41051
41073
6047
41064
41057
6050
6051
41059
41060
41032
41061
41062
6122
41071
41066
6046
5126
6052
41067
41068
6054
41069
41070
6053
41072
5803
41056
61009
6055
41075
Zone 1
Zone 2
Zone 1
Zone 3
Zone 3
Zone 1
Zone 1
Zone 3
Zone 3
Zone 2
Zone 3
Zone 2
Zone 2
Zone 2
Zone 2
Zone 2
Zone 2
Zone 1
Zone 1
Zone 1
Zone 1
Zone 2
Zone 1
Zone 3
Zone 2
Zone 2
Zone 1
Zone 1
Zone 1
Zone 2
Zone 1
Zone 1
Zone 1
Zone 1
Zone 3
Zone 2
Zone 1
Zone 2
Zone 2
Zone 1
Zone 3
Zone 3
Zone 1
Zone 3
Zone 1
Zone 1
Zone 2
Zone 2
Zone 1
Zone 3
Zone 2
Zone 2
Zone 1
Zone 2
Basic
capacity tariff
(E K )
Factor
for interruptible
capacity
(f utb )
Metering
charge
Accounting
charge
Specific biogas
redistribution levy
Market area
conversion
charge
Metering
operation
charge 1
ct/(kWh/h)/d
-
ct/(kWh/h)/d
ct/(kWh/h)/d
ct/(kWh/h)/d
ct/(kWh/h)/d
EUR/d
1.24
1.00
1.24
1.59
1.59
1.24
1.24
1.59
1.59
1.00
1.59
1.00
1.00
1.00
1.00
1.00
1.00
1.24
1.24
1.24
1.24
1.00
1.24
1.59
1.00
1.00
1.24
1.24
1.24
1.00
1.24
1.24
1.24
1.24
1.59
1.00
1.24
1.00
1.00
1.24
1.59
1.59
1.24
1.59
1.24
1.24
1.00
1.00
1.24
1.59
1.00
1.00
1.24
1.00
-
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.16245
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
-
The metering operation charge is payable, if ONTRAS is meter operator. Details in section 23 of the Terms and Conditions of Trade of ONTRAS.
Price list of ONTRAS Gastransport GmbH
Version: 9.1
Page 6 / 7
Last update: 05 November 2015
Valid from: 01 January 2016
3. Tariffs for entry capcaties at storages (UGS)
Storage point
Netpoint
ID
Factor
Basic capacity tariff
(E K )
Tariff zone
for interruptible
capacity
(f utb )
ct/(kWh/h)/d
UGS Buchholz
UGS Katharina
UGS Kirchheilingen
UGS Kraak
UGS Peckensen
UGS Staßfurt
VGS Storage Hub
2200
5828
2158
2564
1322
61004
4290
Entry zone storage
Entry zone storage
Entry zone storage
Entry zone storage
Entry zone storage
Entry zone storage
Entry zone storage
Netpoint
ID
Tariff zone
Jan
Feb | Mrz
0.3075
0.3075
0.3075
0.3075
0.3075
0.3075
0.3075
Apr | Mai | Sep
Okt | Nov | Dez
0.615
0.615
0.615
0.615
0.615
0.615
0.615
Jun | Jul
Aug
0.9225
0.9225
0.9225
0.9225
0.9225
0.9225
0.9225
0.90
0.90
0.90
0.90
0.90
0.90
0.90
4. Tariffs for exit capcaties at storages (UGS)
Storage point
Factor
Basic capacity tariff
(E K )
for interruptible
capacity
(f utb )
ct/(kWh/h)/d
UGS Allmenhausen
UGS Buchholz
UGS Katharina
UGS Kirchheilingen
UGS Kraak
UGS Peckensen
UGS Staßfurt
VGS Storage Hub
Price list of ONTRAS Gastransport GmbH
Version: 9.1
6105
2200
5828
2158
2564
1322
61004
4290
Exit zone 2 storage
Exit zone 2 storage
Exit zone 2 storage
Exit zone 2 storage
Exit zone 2 storage
Exit zone 2 storage
Exit zone 2 storage
Exit zone 2 storage
Jan
Feb | Mrz
0.75
0.75
0.75
0.75
1.19
0.75
0.75
0.75
Apr | Mai | Sep
Okt | Nov | Dez
0.50
0.50
0.50
0.50
0.80
0.50
0.50
0.50
Page 7 / 7
Jun | Jul
Aug
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.90
0.89
0.90
0.90
0.89
0.90
0.90
0.90
Metering
charge
Accounting
charge
Market area
conversion
charge
ct/(kWh/h)/d
ct/(kWh/h)/d
ct/(kWh/h)/d
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0016
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.0107
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
0.02363
Last update: 05 November 2015