Schlagmann Poroton – ACE Energy Day Brussels

Schlagmann Poroton – ACE Energy Day Brussels
Dr. Jens Geduhn
15.06.2015
Manufacturer of Backing Bricks
for the monlithic Wall Construction
Block-Brick
grinded Brick
2
Schlagmann in brief
1./2. generation
• founded in 1948: Lorenz Schlagmann
3./4. generation
• Family Schlagmann-Edmüller
general manager
• Johannes Edmüller, Dipl.-Kfm.
staff
sales in 2014
shareholder
locations
• 330 employees
• 70 Mio. € (+9,6% to 2012)
• 50% Schlagmann-Edmüller
• 50% Wienerberger AG, Vienna (Austria)
• 5 production plants in Bavaria
3
Poroton in Germany

16 plants

1820 employees

German Poroton GmbH,
located in Berlin, Kochstraße
Waldsassen
Zeilarn
chairman:
Johannes Edmüller
4
From the small Bavarian Brickyard…
5
… to the Market Leader in Bavaria!
6
Innovation as „Elixir of Life“
company motto:
„anyone who stops improving,
has stopped being good.“
Philip Rosenthal
7
Invention 2001: Perlite filled Brick
Perlite: expended volcanic
rock as integrated thermal
insulation
…thermal insulation more important…
8
Product Development in the Past
2001
2008
2009
T9
T8
T7 asym.
T7 sym.
2003
2006
2010
2011
2011
2000
9
T12
S12
S11
S10
S9
LEEMA – Project: Results
 main focus on 3I-insulating materials:
 substitution of natural expanded perlite with “artificial“ perlite
 equal lambda value (λ = ca. 36 mW/m K)
 with additives water repellency possible
 binding of granules with classical binding systems possible
 but less performance in moisture stability compared to natural perlite
 future goal: substitution of natural clay by geopolymeric pastes as brick shell
10.07.2015
10
Search for Efficient Particle Binders
10.07.2015
11
Bound 3I-insulating Materials
10.07.2015
12
New Product Development
 finite element simulation by MFPA Weimar
 λeq = λbrick shell + λinsulant + λmortar + λgeometry
 new “S 8”:
 lambda design values contain safety factors
λbrick shell
λinsulant
λmortar
λeq
[W/m K]
[W/m K]
[W/m K]
[W/m K]
0,220
0,037
0,270
0,0813
13
Residental Building in the Future
 mega trend: urban growth – need for more MFH:
 prediction for building:
consequence:
higher buidings, thus
higher compressive
strength for the
masonry
SFH
MFH
multi-story bricks
σ0 ≥ 1,2 ... 1,6 MN/m²
10.07.2015
14
Development in
Residential Building
object „Candis Punkto“ in Regensburg
with POROTON® multi-story brick 425 mm
Peterstor,
Regensburg
POROTON-S9 425
10.07.2015
POROTON-FZ9 425
16
Brick Panel for Refurbishment
ETICS:
External Thermal Insulation
Composite System
WDF:
German:
WärmeDämmFassade
POROTON®-WDF
Herkömmliches WDVS
WDF-80 for indoor insulation
10.07.2015
18
Project Indoor Insulation
Schlossstraße Schwerin
10.07.2015
19
Project Indoor Insulation
Schlossstraße Schwerin
10.07.2015
20
Summary / Outlook / Questions
 prototypes of brick body for Poroton-S8 and WDF-80 have been produced
 prototypes filled with 3I-insulating material are ready for wall measurements at
the MPA Stuttgart
 ability to bind 3I-granules without negative affecting thermal conductivity, also in
hydrophobic conditions
 further step: real upscaling to industrial scale
 Right time to market 3I-insulating materials?
 key property of inorganic insulants of this kind always weaker than organic ones
 low embodied energy as key property in sales?
10.07.2015
21
Zeiterfassung
 Ausfüllen „Time-Sheet“:
10.07.2015
22
Die besten „Zutaten“ aus der Natur für
gesundes Wohnen
Geprüft und empfohlen:
10.07.2015
23
Lagerfugendicke - Planziegel
 Sicherer und vollflächiger Mörtelauftrag mit V.Plus-System
Erfolgsstory gefüllte Ziegel
Mio. NF
160
Absatz Inland
140
130 135
Absatz Export + IC
116
120
101
100
73
80
60
40
20
0,6
13
22
27
35
44
55
80
57
0
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Plan
2014
25
In Mrd. € zu Preisen von 2000
Wohnungsbau in Deutschland
Quelle: DIW-Institut bis 2009 und Heinze Prognose 2015 – Stand Januar 2011
Expandiertes Perlit
 Blähfähigkeit durch Wassergehalt im Gestein
 schnelles Erhitzen führt zum Verdampfen des Wassers
 pyroplastischer Zustand zw. 600 °C und 900 °C
 Volumenvergrößerung auf das 5 – 20 fache
 Schüttdichte: 30 g/L bis 150g/L
 weißes Granulat
Bilder: Knauf Perlite GmbH
10.07.2015
27
Perlit – REM-Aufnahmen
Bild links:
Knauf Perlite; Bild rechts: S&B S.A.
10.07.2015
28
Wasserabweisendes Perlit
10.07.2015
29
Bau eines Forschungszentrums Ziegel (FZZ) am
Standort Zeilarn
2013
Spatenstich mit
Minister Marcel Huber
2014
Einweihung mit
Ministerin Ilse Aigner
30
Einmalig bei Mauzerziegel in Deutschland!
 1,6 Mio.€ Investition
 Bauzeit 11 Monate
 15 Mitarbeiter auf 650 m2 Nettogrundfläche
 Ziele: „Energie- und Ressourceneffizzienz verbessern
 Qualitätsoptimierung im Rahmen der
WPK (werkseigene Produktionskontrolle)
 Langfristiges Ziel: CO2-neutrale
Ziegelproduktion
10.07.2015
31
DIE ZIEGELHAUS
DER ZUKUNFT…
• produziert mehr Energie,
als es verbraucht.
• produziert Strom für
10.000 km Elektromobilität.
• bietet 100 % Wohngesundheit.
32
Effizienzhaus Plus
10.07.2015
33
Energiebilanz
STROM
17.06.2014
Auszug aus www.sunnyportal.com
10.07.2015
34
Bayerischer Mittelstandspreis für Schlagmann
Poroton
Horst Seehofer übergab uns am
Samstag, 08.11.2014 in Bamberg den
Bayerischen Mittelstandspreis 2014
10.07.2015
35
Projekt Außendämmung
Frankfurt, Friedrich-List-Str.
10.07.2015
36
Projekt Außendämmung
Frankfurt, Friedrich-List-Str.
10.07.2015
37
Projekt Außendämmung
Frankfurt, Friedrich-List-Str.
10.07.2015
38
VIELEN DANK
FÜR IHRE AUFMERKSAMKEIT!
10.07.2015
40