TECHNOLOGY TOUR CODELCO CHILE DIVISIÓN CHUQUICAMATA DATE Tuesday May 12th, 2015 DATE: a) Program: Hours 07:00 Hrs. 10:30Hrs. 11:00Hrs. 12:00Hrs. 13:00 Hrs. 14:00Hrs. 15:00 Hrs. 15:30 Hrs. 18:30 Hrs. Activity Departure from Hotel Antofagasta (Prat and Balmaceda street) General Management • DCH Welcome and Presentation Smelting and Refinery Management • Induction talk • Visit Casting wheels Gerencia Refinerías • Charla de Inducción de Seguridad y procesos • Visita a Nave Electrolítica • Visita a Sala de Máquinas • Visita a Patio de Embarque Industrial Canteen • Lunch at the Canteen Truck Workshop • Visit Truck Workshop (Yard 65) Chuquicamata Mine Management • Visit Mirador Chuquicamata Mine Transportation back to Antofagasta Arrival Hotel Antofagasta b) Background: Start of operations Distance from Antofagasta Height Field Fine Copper Production Level Envelope (no contractors) 1915 340 km. 2.870 m.s.n.m 450.000 Ton/year 6.400 c) Personal Protective Equipment (PPE) carried by the participant: participant: Safety shoes Long sleeve shirt Trousers Sunblock Individual Bottle of water
© Copyright 2025 ExpyDoc