VALOR COSTOS DIRECTOS DE CONEXIÓN 2015 VALOR

TARIFAS VIGENCIA 2015
IPC 2014 =
0.0366
IPC 2014 + 2 puntos =
0.0566
VALOR COSTOS DIRECTOS DE CONEXIÓN 2015
SECTOR/ESTRATO
SECTOR
RESIDENCIAL
SECTOR NO
RESIDENCIAL
ESTRATO
VALOR A
COBRAR
2014
INCREMENTO
IPC 2014
TOTAL
PRECIOS
2015
TARIFA 2015
(APROX.MULTIMO
DE 1.000)
ESTRATO 1
$ 148,000.00
$ 8,376.80
$ 156,376.80
$ 156,000.00
ESTRATO 2
$ 181,000.00
$ 10,244.60
$ 191,244.60
$ 191,000.00
ESTRATO 3
$ 328,000.00
$ 18,564.80
$ 346,564.80
$ 347,000.00
ESTRATO 4
$ 378,000.00
$ 21,394.80
$ 399,394.80
$ 400,000.00
ESTRATO 5
$ 493,000.00
$ 27,903.80
$ 520,903.80
$ 521,000.00
ESTRATO 6
$ 525,000.00
$ 29,715.00
$ 554,715.00
$ 555,000.00
OFICIAL
$ 378,000.00
$ 21,394.80
$ 399,394.80
$ 400,000.00
COMERCIAL
$ 525,000.00
$ 29,715.00
$ 554,715.00
$ 555,000.00
INDUSTRIAL
$ 525,000.00
$ 29,715.00
$ 554,715.00
$ 555,000.00
ESPECIAL
$ 378,000.00
$ 21,394.80
$ 399,394.80
$ 400,000.00
VALOR REPOSICION DOMICILIARIA 2015
ESTRATO
CONCEPTO
Pavimento
Flexible (SIN
IVA) 2014
INCREMENTO TOTAL PRECIOS
IPC 2014
2015
TARIFA 2015
(APROX.MULTIMO
DE 1.000)
Primer Metro
Metro
Adicional
$ 530,100.00
$ 30,003.66
$ 560,103.66
$ 560,000.00
1y2
$ 125,800.00
$ 7,120.28
$ 132,920.28
$ 133,000.00
Primer Metro
Metro
Adicional
$ 583,100.00
$ 33,003.46
$ 616,103.46
$ 616,000.00
3y4
$ 138,400.00
$ 7,833.44
$ 146,233.44
$ 146,000.00
Primer Metro
Metro
Adicional
Primer Metro
$ 609,600.00
$ 34,503.36
$ 644,103.36
$ 644,000.00
$ 144,700.00
$ 8,190.02
$ 152,890.02
$ 153,000.00
$ 636,100.00
$ 36,003.26
$ 672,103.26
$ 672,000.00
$ 151,000.00
$ 8,546.60
$ 159,546.60
$ 160,000.00
Pavimento
Rígido (SIN
IVA) 2014
INCREMENTO
IPC 2014
TOTAL PRECIOS
2015
TARIFA 2015
(APROX.MULTIMO
DE 1.000)
$ 30,299.40
$ 565,624.40
$ 566,000.00
5y6
No residencial
ESTRATO
1y2
3y4
5y6
No residencial
Metro
Adicional
CONCEPTO
Primer Metro
$ 535,325.00
Metro Adicional
$ 131,700.00
$ 7,454.22
$ 139,154.22
$ 139,000.00
Primer Metro
$ 588,900.00
$ 33,331.74
$ 622,231.74
$ 622,000.00
Metro Adicional
$ 144,900.00
$ 8,201.34
$ 153,101.34
$ 153,000.00
Primer Metro
$ 615,600.00
$ 34,842.96
$ 650,442.96
$ 650,000.00
Metro Adicional
$ 151,500.00
$ 8,574.90
$ 160,074.90
$ 160,000.00
Primer Metro
$ 642,400.00
$ 36,359.84
$ 678,759.84
$ 679,000.00
Metro Adicional
$ 158,000.00
$ 8,942.80
$ 166,942.80
$ 167,000.00
VALOR ALQUILER DE MAQUINARIA 2015
EQUIPO
UNIDAD
VALOR A COBRAR
INCREMENTO
INCLUIDO IVA
IPC 2014
2014
TOTAL
PRECIOS 2015
TARIFA 2015
(APROX.MULTIMO
DE 1.000)
RETROEXCAVADORA
HORA
$ 135,000.00
$ 7,641.00
$ 142,641.00
$ 143,000.00
VOLQUETA
VIAJE
$ 160,000.00
$ 9,056.00
$ 169,056.00
$ 169,000.00
EQUIPO DE LIMPIEZA
HORA
$ 503,000.00
$ 28,469.80
$ 531,469.80
$ 531,000.00
EQUIPO DE
INSPECCIÓN (*)
HORA
$ 404,000.00
$ 22,866.40
$ 426,866.40
$ 427,000.00
CARROTANQUE
VIAJE
$ 242,000.00
$ 13,697.20
$ 255,697.20
$ 256,000.00
$ 4,450,000.00 $ 251,870.00 $ 4,701,870.00
$ 4,702,000.00
FUERA DE LA ZONA
GEOGRAFICA
DÍA
VALOR ELEMENTOS Y PREFABRICADOS 2015
VALOR A
COBRAR
INCLUIDO IVA
2014
ELEMENTO
TAPA POZO TIPO PESADO
(vehicular)
TAPA POZO TIPO LIVIANO
(peatonal)
REJILLA DE CONCRETO
TAPA REGISTRO
CORONA SIN ARO Y
CONTRARO
TAPA SUMIDERO
PLANCHÓN
INCREMENTO
IPC 2014
TOTAL PRECIOS
2015
TARIFA 2015
(APROX.MULTIMO
DE 1.000)
$ 188,000.00
$ 10,640.80
$ 198,640.80
$ 199,000.00
$ 116,000.00
$ 6,565.60
$ 122,565.60
$ 123,000.00
$ 283,000.00
$ 86,000.00
$ 16,017.80
$ 4,867.60
$ 299,017.80
$ 90,867.60
$ 299,000.00
$ 91,000.00
$ 435,000.00
$ 24,621.00
$ 459,621.00
$ 460,000.00
$ 90,000.00
$ 138,000.00
$ 5,094.00
$ 7,810.80
$ 95,094.00
$ 145,810.80
$ 95,000.00
$ 146,000.00
VALOR ACCESORIOS DE CONEXIÓN 2015
ACCESORIO
VALOR A COBRAR
INCLUIDO IVA 2014
INCREMENT
O IPC 2014
TOTAL
PRECIOS 2015
TARIFA 2015
(APROX.MULTIMO
DE 1.000)
SILLA YEE KIT DE 200 X 160 MM
$ 180,000.00
$ 10,188.00
$ 190,188.00
$ 190,000.00
SILLA YEE KIT DE 250 X 160 MM
$ 191,000.00
$ 10,810.60
$ 201,810.60
$ 202,000.00
SILLA YEE KIT DE 315 X 160 MM
$ 380,000.00
$ 21,508.00
$ 401,508.00
$ 402,000.00
SILLA YEE DE 400 X 160
$ 536,000.00
$ 30,337.60
$ 566,337.60
$ 566,000.00
$ 94,000.00
$ 5,320.40
$ 99,320.40
$ 99,000.00
ACCESORIOS DE CONEXIÓN
TUBERIA DE CEMENTO Y GRES
VALOR VERTIMIENTOS RESIDUOS SOLIDOS
CONCEPTO
VERTIMIENTOS
PORTÁTILES
UNIDAD
BAÑOS
VERTIMIENTOS RESIDUOS
ESPECIALES (VACTOR)
VALOR A
COBRAR
INCLUIDO IVA
2014
INCREMENTO
IPC 2014
TARIFA 2015
TOTAL
(APROX.MULTIMO
PRECIOS 2015
DE 1.000)
M3
$ 111,680.00
$ 6,321.09
$ 118,001.09
$ 118,000.00
M3
$ 85,910.00
$ 4,862.51
$ 90,772.51
$ 91,000.00
VALOR EMISION DE DOCUMENTOS
CONCEPTO
Fotocopias
UNIDAD
HOJA
VALOR A
COBRAR
INCLUIDO IVA
2014
INCREMENTO
IPC 2014
TOTAL
PRECIOS 2015
TARIFA 2015
(APROX.MULTIMO
DE 1.000)
$ 100.00
$ 5.66
$ 105.66
$ 100.00
Copia de Factura
UNIDAD
$ 5,000.00
$ 283.00
$ 5,283.00
$ 5,300.00
Certificaciones
UNIDAD
$ 5,000.00
$ 283.00
$ 5,283.00
$ 5,300.00