Cost Transformation evolution in BT
IN CONFIDENCE
Our purpose, goal, strategy and culture
Our purpose
Our goal
To use the power of communications to make a better world
A growing BT: to deliver sustainable profitable revenue growth
Our strategy
Broaden and deepen our customer relationships
Deliver superior
customer service
Fibre
Our culture
Transform
our costs
TV and
content
Mobility
and
future
voice
Invest for
growth
UK
business
markets
A healthy organisation
Leading
global
companies
Broaden and deepen our customer relationships
Transform our costs
Deliver superior
customer service
Fibre
TV and
content
Transform
our costs
Mobility
and
future
voice
Invest for
growth
UK
business
markets
A healthy organisation
•
Tighten our grip on cost transformation
– Technology is constantly changing
– Our customers are demanding better value for money in highly
competitive markets
– It provides the oxygen to invest in growth
– Reducing the cost of failure in customer service also reduces costs
•
Deliver on our promises
•
It’s not cost transformation OR customer service - it’s both
Leading
global
companies
4 Year Cost base reduction1
£1,451m
Operational
CAPEX
CAPEX
£3,088
£1,030m
Operational
Transit
£929m
Operational
Transit
Transit
£m
£1,383m
Operational
CAPEX
Transit
OPEX, £18,182
OPEX, £17,153
OPEX
£16,545
CAPEX
£2,438
OPEX, £16,224
£4.8bn reduction
OPEX, £14,840
OPEX
£12,402
2008/2009 opex
& capex
2009/2010
2010/2011
2011/2012
2012/2013
2012/2013 opex
& capex
Further cost
saving
opportunities
 Further cost base
reductions being
targeted for 2013/14
c.£4.8bn reduction in costs over four years
Capex
Labour costs incl. contractors
Consultancy
Supplier renegotiation
Quick wins
1before
Overhead Value Analysis
Process reengineering
Right First Time
Forensic
specific items, depreciation & amortisation and other operating income
© British Telecommunications plc
BT centric
Insourcing
Output based pricing
Pan – BT
Cost transformation – Team history
2005
BT Retail centric
10 internal consultants
2011
Pan-BT
30 internal consultants
Forensic phase:
• Overhead value analysis
• Right-first-time process
reengineering
Pan-BT phase:
• E2E process improvement
• Insourcing
• Output based pricing
•
Six of original team achieved BT senior
positions:
•
•
•
•
•
•
Matt Davies (CFO BT Consumer)
Clare Watt (FD BT Group)
Shahzad Saleem (MD Cost transformation)
Samantha Booth (MD BT Cables)
Edward Briggs (OR transformation director)
Helen Miles (former CFO OR)
IN CONFIDENCE
•
•
•
•
2014
Pan-BT
100 internal consultants
…..and growing to ~120
Pan-BT top-down & bottom-up:
• E2E process improvement
• Continuous improvement
• Up-skill lob consultants
• In-house project management
• Academy
Combining top-down & bottom up change:
• Top-down cost transformation
• Bottom-up continuous improvement
Focus on cost and service improvement
2 - 3 year assignments, projects ~3-6 months
Developing leadership talent
• MBA
• Six sigma accreditation in-house
Cost
transformation
– Structure
How does
CI fit with BT’s change
management approach?
Cost transformation
Cost
transformation
E2E processes
Implementation
Change
management
Continuous
improvement
Bottom-up
change
Top-down
transformation
Top-down
transformation
Bottom-up
improvement
Focus:
• E2E process
improvement
• Sponsored by
board/CFO
• State of the art
tools &
methodology
• Significant
financial impact
Focus:
• Implementation
of large-scale
transformation
programmes
(£40M+)
• In-house
programme
management
expertise
Focus:
• Drive bottom-up
improvement
• Holistic focus on
cost, service and
engagement
• Coaches train
operational
teams to sustain
improvements
Practice
Training,
development &
method
BT-wide
training &
development
Focus:
• Development &
improvement of
in-house tools
• Training of BT
business
improvement
community
• BQF
accreditation
Managed as a single team – Consultants are encouraged to rotate across units
IN CONFIDENCE
Assessments
BT-wide business
improvement
BT-wide
assessments
Focus:
• Assessment of
the BT-wide
business
improvement
staff
• Provide fasttrack
development
Process re-engineering programmes
Reduce cost of failure and increase quality of service
Cost Base
Savings
12/13
13/14
14/15
Non
consumer
T2R
£0.4bn
• 25% fault reduction
• Improved utilisation and productivity
£60m
L
M
H
GS L2C
£0.1bn
• Reduced internal handoffs saving 24%
and improving customer experience
£40m
L
M
H
Network
Investment
£0.3bn
• 25% increase in productive time by
moving 35% of the workforce to a 3
day week
£45m
L
M
M
© British Telecommunications plc
Organisational structure
Removing organisational overlaps and inefficiencies
Cost Base
Operate/
Design
Operate with
Openreach &
Wholesale
Management
Layers
© British Telecommunications plc
Savings
12/13
13/14
14/15
£2.0bn
• Creation of TSO
• Reduced handovers in design, build
and run for Networks, Infrastructure
and IT
£100m
phase 1
L
M
H
£0.1bn
• Integration on field engineering
• Reducing handoffs in both delivering
services and resolving faults
£16m
L
H
H
£1.3bn
• Increasing span of control of
managers and reducing layers up
• Ensuring managers have appropriate
decision making authority
£50m
L
L
H
Group initiatives
Reducing cost through focus on a common approach
Cost Base
Travel
£0.1bn
• Pan-BT awareness programme
• Increased usage of preferred
suppliers with improved rates
Supply chain
£0.1bn
+ all
stock
• Organisation restructure
• Supplier savings
• Systems infrastructure investment
• Stock optimisation
© British Telecommunications plc
Savings
12/13
13/14
14/15
£25m
M
H
H
£20m
M
H
H
Line of business – Openreach
Detailed forensic approach
Cost Base
Fault
reduction
Fleet
Planning
© British Telecommunications plc
£0.3bn
• 800k less repair visits by focusing on
repeats, improved working practises,
new installs and resolving in one visit
£0.04bn
• 10% reduction in fuel usage through
retuning engines for environmental
and fuel efficiency
£0.1bn
• Improved processes and automation
which means we spend less time
planning
Savings
12/13
13/14
14/15
£65m
M
H
H
£4m
L
H
H
£39m
M
M
H
Procurement
Business as usual plus strategic programmes
Strategic
Category
Sourcing
Tail
Access
overseas
* Gross savings
© British Telecommunications plc
Savings
12/13
13/14
14/15
• Top 15 Strategic Categories (30% spend)
• Transformational pan LoB programme
• Increase preferred suppliers usage
£90m
L
M
H
• Review of smaller supplier spend
• Pan –LoB supply base consolidation
• Tighter supplier creation/stop controls
£35m
M
H
H
£154m*
M
H
H
• Benchmark and optimise pricing
• Exploit new technologies
• Insource to BT own infrastructure
• Consolidate suppliers
Insourcing
 Success from creating new jobs and opportunities for BT people through
insourcing work from 3rd parties
 Will continue insourcing and further development of our flexible
resourcing models
Savings
12/13
13/14
14/15
Facilities
Management
• Insourced facilities services
• Supply chain management
• Invested in people, process & technology
£16m
M
H
H
Contact centre
• 500 roles in Sandwell and Accrington
• 100 roles flexible sales/service in Belfast
£4m
L
M
H
£17m
M
H
H
Software
design
development
&
maintenance
© British Telecommunications plc
• Insourcing of roles from India and in the UK
• Displacement of UK subcontractors backfilled with
retrained BT employees
Cost transformation & continuous improvement
Cost transformation (CT)
Process,
Organisation
and systems
Cost
transformation
Process
redesign
Incremental
change
Improvement type
Cost transformation and The BT Way
Value stream (VS)
Value stream
•
•
•
•
Continuous
improvement
Key process redesign within unit (C2M, L2C, T2R)
Within business units or across units
Focus on process redesign and value stream mapping
Improving service and cost, by engaging teams and
taking out the process waste
Continuous improvement (CI)
Team
Business units
Pan-BT
Improvement scope
IN CONFIDENCE
• E2E transformation projects – often spanning across
multiple LOBs
• Focus on process, organisation structure, systems,
incentives, etc.
• Understanding cost & service impact for transformational
change to allow business to make the right decision
• Continuous improvement, bottom-up
• Within teams (~200 to 400 people), focused on process
(step) improvements and simple system fixes
• Improving service, cost and team engagement by
empowering bottom-up change
Continuous improvement - Rollout plan
Coverage
Team
Method
2013/2014
2014/2015
~7,000 FTE
~20,000
Established group
CI team to support
rollout. ~30 group
CI coaches with six
sigma & lean
training
Group coaches
supporting
training &
development of
operational
coaches
Mandate
4 weeks
Agree scope &
benefit
IN CONFIDENCE
Mobilise
4 weeks
Baseline
Wave
2015/2016
2016/2017
Full coverage
Wave
4 weeks
4 weeks
Voice of customer To-be process
Process mapping
Wave
Implement
8 weeks
4 weeks
A3 & planning Realise benefits
(10- 20%)
Continuous improvement – Six sigma & lean based method
Lean tools:
Value stream analysis
PDCA
Kaizen workshops
Six sigma tools:
Control plans
Control charts
Process capability
Lean tools:
(Daily) PDCA
A3 solving
Gemba walk
Waste elimination
Six sigma tools:
Line rebalancing
BT Continuous
improvement
IN CONFIDENCE
Lean tools: Gemba walk
Six sigma tools:
Mandate project charter
Lean & six sigma tools:
Voice of the customer
CTQ identification
Stakeholder maps
Risk register
Method
PDCA
Lean tools:
Value stream mapping
Waste identification (7 waste), Kaizen
Root cause analysis, FMEA
Issue prioritisation
Team based problem solving
A3 problem solving
Process PDCA
Six sigma tools:
System measurement
Data collection plan
Root cause analysis & fishbone
Baseline capability
Statistical analysis (regression, ANOVA), takt time
Six sigma framework
& analytics
Continuous improvement – Holistic benefits
All Continuous
improvement waves
need to deliver all 3
types of benefits
Improved cost base
Measured through cost & volumes
Cost
transformation
Holistic benefits
Customer
experience
Improved organisational customer experience
Measured through “right-first-time” and service levels
IN CONFIDENCE
Employee
engagement
Improved organisational health
Measured through OHI survey
Continuous
improvement
Consumer Change
Governance – Governance
Goal is to provide seamless alignment of all change activities
Governance model
OC
Cost transformation
Business unit transformation
Local continuous improvement coaches
- Trained by Cost Transformation -
Operational teams
Operational coaches
- - Trained by Cost Transformation -
-
IN CONFIDENCE
Roles & responsibilities
•
•
Overall accountability for delivery
Point of escalation where necessary
•
•
•
Plan & deliver CI waves, accountable for results
Training of LOB unit coaches
Develop & maintain the BT CI method
•
•
•
•
Support & delivery CI waves in unit
Alignment with unit transformation plans
Sustain CI waves in-life
Achieve benefits in unit
•
•
•
•
Implement the CI way of working
Drive continuous improvement in-life
Create a continuous improvement culture
Achieve benefits on the wave in the team