LEGEND BP 447 MAIN TICKET LOBBY Greater Orlando Aviation Authority Line of Existing Exterior Wall As of: June 2014 A SIDE TERMINAL Front of House (FOH) Lobby Area (205,000 sf.) Back of House (BOH) (87,720 SF Total) Ticketing Area (18,850 SF Total) Curb Exterior Tile (55,713 sf) 103,300 SF A1 A3 A2 12,900 SF SCOPE SUMMARY - ARCHITECTURAL ELEMENTS • Expand ticket halls on A/B sides toward enplane curb. • Provide new curb side check-in counters under new canopies - at ‘A’ and ‘B’ sides. • Add new storage rooms for wheel chairs & carts at curbsides • Replace all entry door systems in new exterior wall systems • Provide additional public seating in ticket halls as alternate bid item. • Add new self service kiosks and check in positions (quantities & locations) to be studied in design. • Add & improve FIDS locations & systems on both sides for passenger convenience. Ticket Lobby Program: • Maximize passenger capacity of the north terminal • Main objectives: • Expand ticket halls to increase passenger queue. • New self service check-in/assisted positions. • New self service kiosks. • New oversize baggage drops in ticket counters. All work in this program will be designed & constructed in accordance with GOAA EDC Standards B1 • Upgrade interior finishes in ticket halls / vomitories. • Add ticket positions using new design module for counters, including an ADA station (one per airline). • Upgrade/replace light fixtures in main ticket halls, over main ticket counters, and back walls. • Provide systems, signage & wayfinding for ticket halls on both sides. • Provide new exterior finishes at expanded lobby areas. B2 13,070 SF 11,600 SF 4,580 SF 11,900 SF OBJECTIVES AND STANDARDS A4 MAIN PROJECT • This improvement & expansion program will include multiple bid packages: • Phase I: construct the communications & associated infrastructure (BP 440). • Phase II: will relocate the oversized baggage drops from the curb side enplane in line with the ticket counters (BP 446). • Phase III: will construct the renovation and expansion of the main ticket lobbies on A & B sides (BP 447). B3 9,810 SF 9,700 SF WORK AREAS PROJECT LEVEL 4 AHU’S • 280 tons added essential upgrade SCOPE: FOH + TA + BOH (LIMITED) LEVEL 3 • • • • New exterior floor finish. Front of house add/alter. Ticket area – counters/monitors. Back of house – only minor items for code, electrical, systems. • Except zone B4, old united area “clean-up”. SCHEDULE: Phase I: BP 440 Comm. Rooms. Phase II: BP 446 Oversized baggage. Phase III: BP 447 Ticket Halls, by area. Anticipated construction start date: (pending funding) March 2015 LEVEL 2 • 2 New screening rooms at level 2 adjacent to 6-bank elevator core. B4 9,160 SF 101,700 SF B SIDE TERMINAL C.T. HSU + ASSOCIATES, P.A. ARCHITECTURE PLANNING 820 IRMA AVE, ORLANDO FL 32803 TEL. 407-423-0098 INTERIORS FAX. 407-423-4793 N 0 40 SCALE: 1” = 40’-0” 80 120 200 LEVEL 3 LANDSIDE TERMINAL GREATER ORLANDO AVIATION AUTHORITY BP 447 MAIN TICKET LOBBY BUILDING SECTIONS - EXISTING AND NEW Greater Orlando Aviation Authority B.9 As of: June 2014 C C.2 C.3 C.5 C.7 D D.7 B.9 E C C.2 C.3 C.5 C.7 D D.7 E EXISTING CANOPY EXISTING CANOPY EXISTING CANOPY SYSTEM EXISTING CANOPY SYSTEM EXISTING ROOF SYSTEM EXISTING ROOF SYSTEM 11’ - 0”11' - 0" COLUMN BEYOND WALL TO BE DEMOLISHED EXISTING CIP CONCRETE EXISTING CURTAIN WALL TO BE DEMOLISHED EXISTING SECTION [ENTRANCE] LANDSIDE TERMINAL GREATER ORLANDO AVIATION AUTHORITY 24’ - 2” 11' - 0" COLUMN BEYOND WALL TO BE DEMOLISHED EXISTING DOGHOUSE EXISTING CIP CONCRETE EXISTING CURTAIN WALL TO BE DEMOLISHED [a] EXISTING SECTION LANDSIDE TERMINAL GREATER ORLANDO AVIATION AUTHORITY 31’ - 9” EXPANSION EXPANSION EXISTING SKYLIGHT ASSEMBLY EXISTING CANOPY NEW MECHANICAL ROOM INSULATED METAL PANEL SYSTEM NEW ROOF SYSTEM EXISTING CANOPY NEW ROOF SYSTEM EXISTING ROOF SYSTEM EXISTING ROOF SYSTEM SKYLIGHT ASSEMBLY 13’ - 0” 13’ - 0” GYP WB CEILING WOODGRILLE CEILING SUSPENDED CURVED WOOD PANEL WOOD TRELLIS ASSEMBLY GYP WB CEILING NEW CURTAINWALL SYSTEM CURBSIDE CHECK IN KIOSK NEW SECTION [ENTRANCE] LANDSIDE TERMINAL GREATER ORLANDO AVIATION AUTHORITY [a] WOOD GRILLE CEILING SUSPENDED CURVED WOOD PANEL EXISTING TICKET COUNTERS 2’X2’ PORCELAIN TILE BASE INSULATED METAL PANEL SYSTEM TICKET KIOSK SOLID SURFACE PANEL SYSTEM ACT CEILING BAGGAGE CONVEYER NEW CURTAINWALL SYSTEM NEW SECTION [SELF CHECK-IN] LANDSIDE TERMINAL GREATER ORLANDO AVIATION AUTHORITY ADDITIONAL INTERIOR SPACE C.T. HSU + ASSOCIATES, P.A. ARCHITECTURE PLANNING 820 IRMA AVE, ORLANDO FL 32803 TEL. 407-423-0098 INTERIORS FAX. 407-423-4793 [b] LEVEL 3 LANDSIDE TERMINAL GREATER ORLANDO AVIATION AUTHORITY [b] A SIDE START DATE: TBD - UPON FORMAL NOTICE TO PROCEED (NTP) AND AFTER PRE-CONSTRUCTION CONFERENCE - AS DIRECTED BY OAR. PHASE 1 & 2 IS 270 DAYS 0.9 1 2 3 4 4.2 4.3 5 5.2 6 6.1 7 8 8.7 9 9.5 PHASE 1 150 DAYS 10 11 11.3 12 PHASE 3 & 4 IS 240 DAYS 13 13.9 14 14.1 14.3 15 15.2 16 16.5 17 18 PHASE 2 120 DAYS 18.1 18.5 19 20 21 22 23 23.5 24 25 PHASE 3 120 DAYS 26 26.1 27 28 29 GREATER ORLANDO AVIATION AUTHORITY 30 31 32 33 34 BP - 447 MAIN TICKET LOBBY MODIFICATIONS 35 35.1 35.2 36 PHASE 4 120 DAYS B.9 C C.2 C.5 AED AED AED C.3 C.7 c c A1 A4 c A2 c A3 D c c c CONTRACTOR D.7 c c ORLANDO INTERNATIONAL AIRPORT E E.5 F F.5 C.T. HSU + ASSOCIATES, P.A. G ARCHITECTURE PLANNING INTERIOR DESIGN FL. LIC. # AA-C001322 820 Irma Avenue Orlando, Fl 32803 Tel 407.423.0098 Fax 407.423.4793 H J K K.5 L M O O.5 P Sign/Seal Q c c c No Date Description c c B2 B4 B3 c R c AED c AED c AED B1 R.5 S S.1 1 10 C G 18 26 36 A1 A2 A3 A4 B1 B2 B3 B4 K.5 PHASE 5 120 DAYS PHASE 6 120 DAYS PHASE 7 120 DAYS O PHASE 8 120 DAYS S TRUE NORTH PHASE 5 & 6 IS 240 DAYS PHASE 7 & 8 IS 240 DAYS B SIDE START DATE: NTP + 150 DAYS 1 KEY PLAN PHASING OVERALL PLAN LEVEL 3 1" = 40'-0" 40' 0 40' 80' 120' Project No.: 1207.05 Designed By: Designer Author Drawn By: Checked By: Checker Issue Date: PHASING PRIORITIES - SEQUENCE OF WORK 1. MECHANICAL SEE M7.0.0 AIR HANDLING UNITS SEQUENCE AND PRIORITIES EARLY PROCUREMENT PACKAGE: 4 UNITS ON LEVEL 4 - PRIORITY H1 PHASING PLAN SEQUENCE BY A SIDE & B SIDE: 1. A SIDE: QUADRANTS BY ORDER A1/A2/A3/A4 PHASING ASSUMPTIONS: 1. OVERALL PHASING PLANS WILL MAINTAIN CIRCULATION AND OPERATIONS FOR TRAVELING PUBLIC AND ALL SERVICES IN ALL QUADRANTS. 2. B SIDE: START IS NTP + 150 DAYS; QUADRANTS BY ORDER B1/B2/B3/B4 2. LIFE SAFETY / FIRE ALARM / FIRE PROTECTION / SMOKE CONTROL SYSTEMS 3. BAGGAGE DROPS/BELTS - SEQUENCE BY QUADRANT 4. ARCHITECTURE / STRUCTURE - SEQUENCE BY QUADRANT 5. LIGHTING / ELECTRICAL / COMMUNICATION - SEQUENCE BY QUADRANT 3. FOR EACH PHASE, OPEN THE ENTIRE CEILING IN THE QUAD AND VOMITORY. 4.MAINTENANCE OF TRAFFIC (MOT) AND SAFETY PLANS WILL BE REQUIRED FOR ALL PHASES ON EACH SIDE AS REVIEWED AND APPROVED BY THE AUTHORITY AND OPERATIONS, SAFETY OFFICES, AND OARS. 5. ONE CURB SIDE BAGGAGE DROP IN EACH QUAD (ON BOTH A/B SIDES) WILL REMAIN OPEN AT ALL TIMES. Plot Date: 8/1/2014 11:08:24 AM 2. CONTRACTORS WILL BE RESPONSIBLE FOR DEVELOPING AND SUBMITTING DETAILED CONSTRUCTION PHASING PLANS AND SCHEDULES; GC'S CAN SHOW ADJUSTMENT IN SEQUENCE AND DEMISING BASED UPON FIELD CONDITIONS WHERE AND AS APPROVED BY THE AUTHORITY AND OARS. 3. ASBESTOS REMOVAL BY AUTHORITY ACM CONTRACTOR TO BE COORDINATED BY GC'S, AUTHORITY SAFETY OFFICE, AND OARS. 4. CEILING WORK MUST BE PERFORMED DURING NIGHT-TIME HOURS OR IN COMPLETELY DEMISED / CONTROLLED ENVIRONMENT BY ZONES TO PROTECT THE PUBLIC. THIS INCLUDES MONTHLY AIR QUALITY TESTING AND AIR CONTROL MEASURES BY THE GC. March 31, 2014 Drawing Scale: Drawing Title: OVERALL PHASING FLOOR PLAN LANDSIDE LEVEL 3 95 % PROGRESS Drawing No. LS3 PH-1.3.00 BP 447 MAIN TICKET LOBBY CURBSIDE VIEW Greater Orlando Aviation Authority As of: June 2014 C.T. HSU + ASSOCIATES, P.A. ARCHITECTURE PLANNING 820 IRMA AVE, ORLANDO FL 32803 TEL. 407-423-0098 INTERIORS FAX. 407-423-4793 LEVEL 3 LANDSIDE TERMINAL GREATER ORLANDO AVIATION AUTHORITY BP 447 MAIN TICKET LOBBY MAIN ENTRANCE Greater Orlando Aviation Authority As of: June 2014 C.T. HSU + ASSOCIATES, P.A. ARCHITECTURE PLANNING 820 IRMA AVE, ORLANDO FL 32803 TEL. 407-423-0098 INTERIORS FAX. 407-423-4793 LEVEL 3 LANDSIDE TERMINAL GREATER ORLANDO AVIATION AUTHORITY BP 447 MAIN TICKET LOBBY INTERIOR Greater Orlando Aviation Authority As of: June 2014 C.T. HSU + ASSOCIATES, P.A. ARCHITECTURE PLANNING 820 IRMA AVE, ORLANDO FL 32803 TEL. 407-423-0098 INTERIORS FAX. 407-423-4793 LEVEL 3 LANDSIDE TERMINAL GREATER ORLANDO AVIATION AUTHORITY BP 447 MAIN TICKET LOBBY INTERIOR Greater Orlando Aviation Authority As of: June 2014 C.T. HSU + ASSOCIATES, P.A. ARCHITECTURE PLANNING 820 IRMA AVE, ORLANDO FL 32803 TEL. 407-423-0098 INTERIORS FAX. 407-423-4793 LEVEL 3 LANDSIDE TERMINAL GREATER ORLANDO AVIATION AUTHORITY BP 447 MAIN TICKET LOBBY INTERIOR Greater Orlando Aviation Authority As of: June 2014 C.T. HSU + ASSOCIATES, P.A. ARCHITECTURE PLANNING 820 IRMA AVE, ORLANDO FL 32803 TEL. 407-423-0098 INTERIORS FAX. 407-423-4793 LEVEL 3 LANDSIDE TERMINAL GREATER ORLANDO AVIATION AUTHORITY
© Copyright 2024 ExpyDoc