BP 447 MAIN TICKET LOBBY - Orlando International Airport

LEGEND
BP 447 MAIN TICKET LOBBY
Greater Orlando Aviation Authority
Line of Existing Exterior Wall
As of: June 2014
A SIDE TERMINAL
Front of House (FOH)
Lobby Area (205,000 sf.)
Back of House (BOH)
(87,720 SF Total)
Ticketing Area
(18,850 SF Total)
Curb Exterior Tile
(55,713 sf)
103,300 SF
A1
A3
A2
12,900 SF
SCOPE SUMMARY - ARCHITECTURAL ELEMENTS
• Expand ticket halls on A/B sides
toward enplane curb.
• Provide new curb side check-in
counters under new canopies - at
‘A’ and ‘B’ sides.
• Add new storage rooms for wheel
chairs & carts at curbsides
• Replace all entry door systems in
new exterior wall systems
• Provide additional public seating in
ticket halls as alternate bid item.
• Add new self service kiosks and
check in positions (quantities &
locations) to be studied in design.
• Add & improve FIDS locations
& systems on both sides for
passenger convenience.
Ticket Lobby Program:
• Maximize passenger capacity of the north terminal
• Main objectives:
• Expand ticket halls to increase passenger queue.
• New self service check-in/assisted positions.
• New self service kiosks.
• New oversize baggage drops in ticket counters.
All work in this program will be designed & constructed
in accordance with GOAA EDC Standards
B1
• Upgrade interior finishes in ticket
halls / vomitories.
• Add ticket positions using new
design module for counters,
including an ADA station (one per
airline).
• Upgrade/replace light fixtures in
main ticket halls, over main ticket
counters, and back walls.
• Provide systems, signage &
wayfinding for ticket halls on both
sides.
• Provide new exterior finishes at
expanded lobby areas.
B2
13,070 SF
11,600 SF
4,580 SF
11,900 SF
OBJECTIVES AND STANDARDS
A4
MAIN PROJECT
• This improvement & expansion
program will include multiple bid
packages:
• Phase I: construct the
communications & associated
infrastructure (BP 440).
• Phase II: will relocate the
oversized baggage drops from
the curb side enplane in line with
the ticket counters (BP 446).
• Phase III: will construct the
renovation and expansion of
the main ticket lobbies on A & B
sides (BP 447).
B3
9,810 SF
9,700 SF
WORK AREAS
PROJECT
LEVEL 4 AHU’S
• 280 tons added essential upgrade
SCOPE: FOH + TA + BOH (LIMITED)
LEVEL 3
•
•
•
•
New exterior floor finish.
Front of house add/alter.
Ticket area – counters/monitors.
Back of house – only minor items
for code, electrical, systems.
• Except zone B4, old united area
“clean-up”.
SCHEDULE:
Phase I: BP 440 Comm. Rooms.
Phase II: BP 446 Oversized baggage.
Phase III: BP 447 Ticket Halls, by area.
Anticipated construction start date:
(pending funding) March 2015
LEVEL 2
• 2 New screening rooms at level 2
adjacent to 6-bank elevator core.
B4
9,160 SF
101,700 SF
B SIDE TERMINAL
C.T. HSU + ASSOCIATES, P.A.
ARCHITECTURE
PLANNING
820 IRMA AVE, ORLANDO FL 32803
TEL. 407-423-0098
INTERIORS
FAX. 407-423-4793
N
0
40
SCALE: 1” = 40’-0”
80
120
200
LEVEL 3
LANDSIDE TERMINAL
GREATER ORLANDO AVIATION AUTHORITY
BP 447 MAIN TICKET LOBBY BUILDING SECTIONS - EXISTING AND NEW
Greater Orlando Aviation Authority
B.9
As of: June 2014
C
C.2
C.3
C.5
C.7
D
D.7
B.9
E
C
C.2
C.3
C.5
C.7
D
D.7
E
EXISTING CANOPY
EXISTING CANOPY
EXISTING CANOPY SYSTEM
EXISTING CANOPY SYSTEM
EXISTING ROOF SYSTEM
EXISTING ROOF SYSTEM
11’ - 0”11' - 0"
COLUMN BEYOND
WALL TO BE DEMOLISHED
EXISTING CIP CONCRETE
EXISTING CURTAIN WALL
TO BE DEMOLISHED
EXISTING SECTION [ENTRANCE]
LANDSIDE TERMINAL
GREATER ORLANDO AVIATION AUTHORITY
24’ - 2”
11' - 0"
COLUMN BEYOND
WALL TO BE DEMOLISHED
EXISTING DOGHOUSE
EXISTING CIP CONCRETE
EXISTING CURTAIN WALL
TO BE DEMOLISHED
[a]
EXISTING SECTION
LANDSIDE TERMINAL
GREATER ORLANDO AVIATION AUTHORITY
31’ - 9”
EXPANSION
EXPANSION
EXISTING SKYLIGHT ASSEMBLY
EXISTING CANOPY
NEW MECHANICAL
ROOM
INSULATED METAL PANEL SYSTEM
NEW ROOF SYSTEM
EXISTING CANOPY
NEW ROOF SYSTEM
EXISTING ROOF
SYSTEM
EXISTING ROOF SYSTEM
SKYLIGHT ASSEMBLY
13’ - 0”
13’ - 0”
GYP WB CEILING
WOODGRILLE CEILING
SUSPENDED
CURVED WOOD
PANEL
WOOD TRELLIS
ASSEMBLY
GYP WB CEILING
NEW CURTAINWALL
SYSTEM
CURBSIDE CHECK IN KIOSK
NEW SECTION [ENTRANCE]
LANDSIDE TERMINAL
GREATER ORLANDO AVIATION AUTHORITY
[a]
WOOD GRILLE CEILING
SUSPENDED CURVED
WOOD PANEL
EXISTING TICKET
COUNTERS
2’X2’ PORCELAIN TILE BASE
INSULATED METAL PANEL
SYSTEM
TICKET KIOSK
SOLID SURFACE PANEL SYSTEM
ACT CEILING
BAGGAGE CONVEYER
NEW CURTAINWALL SYSTEM
NEW SECTION [SELF CHECK-IN]
LANDSIDE TERMINAL
GREATER ORLANDO AVIATION AUTHORITY
ADDITIONAL INTERIOR SPACE
C.T. HSU + ASSOCIATES, P.A.
ARCHITECTURE
PLANNING
820 IRMA AVE, ORLANDO FL 32803
TEL. 407-423-0098
INTERIORS
FAX. 407-423-4793
[b]
LEVEL 3
LANDSIDE TERMINAL
GREATER ORLANDO AVIATION AUTHORITY
[b]
A SIDE START DATE:
TBD - UPON FORMAL NOTICE TO PROCEED (NTP) AND AFTER PRE-CONSTRUCTION CONFERENCE - AS DIRECTED BY OAR.
PHASE 1 & 2 IS 270 DAYS
0.9
1
2
3
4
4.2 4.3
5
5.2
6
6.1
7
8
8.7
9
9.5
PHASE 1 150 DAYS
10
11 11.3
12
PHASE 3 & 4 IS 240 DAYS
13 13.9 14 14.1 14.3 15 15.2
16
16.5
17
18
PHASE 2 120 DAYS
18.1 18.5
19
20
21
22
23
23.5
24
25
PHASE 3 120 DAYS
26 26.1
27
28
29
GREATER ORLANDO AVIATION AUTHORITY
30
31
32
33
34
BP - 447
MAIN TICKET
LOBBY
MODIFICATIONS
35 35.1 35.2 36
PHASE 4 120 DAYS
B.9
C
C.2
C.5
AED
AED
AED
C.3
C.7
c
c
A1
A4
c
A2
c
A3
D
c
c
c
CONTRACTOR
D.7
c
c
ORLANDO
INTERNATIONAL
AIRPORT
E
E.5
F
F.5
C.T. HSU + ASSOCIATES, P.A.
G
ARCHITECTURE
PLANNING
INTERIOR DESIGN
FL. LIC. # AA-C001322
820 Irma Avenue
Orlando, Fl 32803
Tel 407.423.0098
Fax 407.423.4793
H
J
K
K.5
L
M
O
O.5
P
Sign/Seal
Q
c
c
c
No
Date
Description
c
c
B2
B4
B3
c
R
c
AED
c
AED
c
AED
B1
R.5
S
S.1
1
10
C
G
18
26
36
A1
A2
A3
A4
B1
B2
B3
B4
K.5
PHASE 5 120 DAYS
PHASE 6 120 DAYS
PHASE 7 120 DAYS
O
PHASE 8 120 DAYS
S
TRUE
NORTH
PHASE 5 & 6 IS 240 DAYS
PHASE 7 & 8 IS 240 DAYS
B SIDE START DATE: NTP + 150 DAYS
1
KEY PLAN
PHASING OVERALL PLAN LEVEL 3
1" = 40'-0"
40'
0
40'
80'
120'
Project No.:
1207.05
Designed By:
Designer
Author
Drawn By:
Checked By:
Checker
Issue Date:
PHASING PRIORITIES - SEQUENCE OF WORK
1. MECHANICAL SEE M7.0.0 AIR HANDLING UNITS SEQUENCE AND PRIORITIES
EARLY PROCUREMENT PACKAGE: 4 UNITS ON LEVEL 4 - PRIORITY H1
PHASING PLAN SEQUENCE BY A SIDE & B SIDE:
1. A SIDE: QUADRANTS BY ORDER A1/A2/A3/A4
PHASING ASSUMPTIONS:
1. OVERALL PHASING PLANS WILL MAINTAIN CIRCULATION AND OPERATIONS FOR
TRAVELING PUBLIC AND ALL SERVICES IN ALL QUADRANTS.
2. B SIDE: START IS NTP + 150 DAYS; QUADRANTS BY ORDER B1/B2/B3/B4
2. LIFE SAFETY / FIRE ALARM / FIRE PROTECTION / SMOKE CONTROL SYSTEMS
3. BAGGAGE DROPS/BELTS - SEQUENCE BY QUADRANT
4. ARCHITECTURE / STRUCTURE - SEQUENCE BY QUADRANT
5. LIGHTING / ELECTRICAL / COMMUNICATION - SEQUENCE BY QUADRANT
3. FOR EACH PHASE, OPEN THE ENTIRE CEILING IN THE QUAD AND VOMITORY.
4.MAINTENANCE OF TRAFFIC (MOT) AND SAFETY PLANS WILL BE REQUIRED FOR ALL PHASES
ON EACH SIDE AS REVIEWED AND APPROVED BY THE AUTHORITY AND OPERATIONS, SAFETY
OFFICES, AND OARS.
5. ONE CURB SIDE BAGGAGE DROP IN EACH QUAD (ON BOTH A/B SIDES) WILL REMAIN OPEN AT
ALL TIMES.
Plot Date: 8/1/2014 11:08:24 AM
2. CONTRACTORS WILL BE RESPONSIBLE FOR DEVELOPING AND SUBMITTING
DETAILED CONSTRUCTION PHASING PLANS AND SCHEDULES; GC'S CAN SHOW
ADJUSTMENT IN SEQUENCE AND DEMISING BASED UPON FIELD CONDITIONS
WHERE AND AS APPROVED BY THE AUTHORITY AND OARS.
3. ASBESTOS REMOVAL BY AUTHORITY ACM CONTRACTOR TO BE COORDINATED BY
GC'S, AUTHORITY SAFETY OFFICE, AND OARS.
4. CEILING WORK MUST BE PERFORMED DURING NIGHT-TIME HOURS OR IN
COMPLETELY DEMISED / CONTROLLED ENVIRONMENT BY ZONES TO PROTECT
THE PUBLIC. THIS INCLUDES MONTHLY AIR QUALITY TESTING AND AIR CONTROL
MEASURES BY THE GC.
March 31, 2014
Drawing Scale:
Drawing Title:
OVERALL PHASING
FLOOR PLAN
LANDSIDE LEVEL 3
95 % PROGRESS
Drawing No.
LS3
PH-1.3.00
BP 447 MAIN TICKET LOBBY CURBSIDE VIEW
Greater Orlando Aviation Authority
As of: June 2014
C.T. HSU + ASSOCIATES, P.A.
ARCHITECTURE
PLANNING
820 IRMA AVE, ORLANDO FL 32803
TEL. 407-423-0098
INTERIORS
FAX. 407-423-4793
LEVEL 3
LANDSIDE TERMINAL
GREATER ORLANDO AVIATION AUTHORITY
BP 447 MAIN TICKET LOBBY MAIN ENTRANCE
Greater Orlando Aviation Authority
As of: June 2014
C.T. HSU + ASSOCIATES, P.A.
ARCHITECTURE
PLANNING
820 IRMA AVE, ORLANDO FL 32803
TEL. 407-423-0098
INTERIORS
FAX. 407-423-4793
LEVEL 3
LANDSIDE TERMINAL
GREATER ORLANDO AVIATION AUTHORITY
BP 447 MAIN TICKET LOBBY INTERIOR
Greater Orlando Aviation Authority
As of: June 2014
C.T. HSU + ASSOCIATES, P.A.
ARCHITECTURE
PLANNING
820 IRMA AVE, ORLANDO FL 32803
TEL. 407-423-0098
INTERIORS
FAX. 407-423-4793
LEVEL 3
LANDSIDE TERMINAL
GREATER ORLANDO AVIATION AUTHORITY
BP 447 MAIN TICKET LOBBY INTERIOR
Greater Orlando Aviation Authority
As of: June 2014
C.T. HSU + ASSOCIATES, P.A.
ARCHITECTURE
PLANNING
820 IRMA AVE, ORLANDO FL 32803
TEL. 407-423-0098
INTERIORS
FAX. 407-423-4793
LEVEL 3
LANDSIDE TERMINAL
GREATER ORLANDO AVIATION AUTHORITY
BP 447 MAIN TICKET LOBBY INTERIOR
Greater Orlando Aviation Authority
As of: June 2014
C.T. HSU + ASSOCIATES, P.A.
ARCHITECTURE
PLANNING
820 IRMA AVE, ORLANDO FL 32803
TEL. 407-423-0098
INTERIORS
FAX. 407-423-4793
LEVEL 3
LANDSIDE TERMINAL
GREATER ORLANDO AVIATION AUTHORITY