PDCI Upgrade Outage 2014-2016

POWER
SYSTEM
Pacific DC Intertie (PDCI) Upgrade
Outage / De-rate Schedule 2014-2016
Version No.
7 Effective Date: 01/9/2015 Introduction
The upcoming scheduled outages due to major upgrades on the Pacific DC Intertie (PDCI) will result in reduced available capacity on the line during various periods from 2014 to 2016. Most of the upgrades are convertor station and line work by the Bonneville Power Administration (BPA) to modernize its infrastructure at the Celilo Converter Station, which is the northern terminal of the PDCI. Other work will be performed by the Los Angeles Department of Water and Power (LADWP) in conjunction with the upgrades. SchedulingMWCapacity1
The schedule below will be updated as outages are scheduled. Start Date September 22, 2014 HE06 September 29, 2014 HE05 November 16, 2014 HE19 January 9, 2015 HE5 January 9, 2015 HE6 January 9, 2015 HE19 January 9, 2015 HE20 January 10, 2015 HE5 January 10, 2015 HE6 January 10, 2015 HE19 January 10, 2015 HE20 January 11, 2015 HE5 End Date September 22, 2014 HE05 September 29, 2014 HE04 November 16, 2014 HE18 January 9, 2015 HE5 January 9, 2015 HE6 January 9, 2015 HE19 January 9, 2015 HE20 January 10, 2015 HE5 January 10, 2015 HE6 January 10, 2015 HE19 January 10, 2015 HE20 January 11, 2015 HE5 January 11, 2015 HE6 Direction North – South South – North North – South South – North North – South South – North North – South South – North North – South South – North North – South South – North North – South South – North North – South South – North North – South South – North North – South South – North North – South South – North North – South South – North North – South South – North 1
Outages highlighted in yellow are yet to be confirmed with BPA. Page 1 of 3 Scheduling Capacity (MW) 2990 975 1956 975 0 0 1956 975 0 0 957 905 0 0 1956 975 0 0 957 905 0 0 1956 975 0 0 POWER
SYSTEM
Pacific DC Intertie (PDCI) Upgrade
Outage / De-rate Schedule 2014-2016
Version No.
7 Effective Date: 01/9/2015 Start Date End Date Direction Scheduling Capacity (MW) January 11, 2015 January 11, 2015 North – South 957 HE6 HE19 South – North 905 January 11, 2015 January 11, 2015 North – South 0 HE19 HE20 South – North 0 January 11, 2015 February 9, 2015 North – South 1956 HE20 HE7 South – North 975 February 9, 2015 February 22, 2015 North – South 0 HE7 HE21 South – North 0 February 22, 2015 June 27, 2015 North – South 1956 HE21 HE4 South – North 975 June 27, 2015 June 28, 2015 North – South 0 HE4 HE21 South – North 0 June 28, 2015 September 11, 2015 North – South 1956 HE21 HE6 South – North 975 September 11, 2015 October 16, 2015 North – South 0 HE6 HE21 South – North 0 October 16, 2015 November 3, 2015 North – South 1956 HE21 HE8 South – North 975 November 3, 2015 December 21, 2015 North – South 0 HE9 HE8 South – North 0 December 21, 2015 June 25, 2016 North – South 32202 HE8 HE4 South – North 975 June 25, 2016 June 26, 2016 North – South 0 HE5 HE21 South – North 0 June 26, 2016 September 16, 2016 North – South 32202 HE22 HE6 South – North 975 September 16, 2016 October 16, 2016 North – South 0 HE6 HE21 South – North 0 October 16, 2016 North – South 32202 HE21 South – North 975 From September 22, 2014 to November 3, 2015, Converter 1 & Converter 2 will be removed from service for reconstruction and the capacity of the PDCI will be at a maximum of 1956MW (N‐S) and 975MW (S‐N). From September 29, 2014 to November 16, 2014, the Celilo‐Sylmar Pole 3 1000kV Line and Celilo‐Sylmar Pole 4 1000kV Line will be removed from service and the PDCI will not be available [0MW (N‐S) and 0MW (S‐N)]. 1
Outages highlighted in yellow are yet to be confirmed with BPA. The scheduling capacity of 3220MW is not the scheduling capacity at NOB which is used by LADWP for the PDCI. It will be determined and revised at a later time 2
Page 2 of 3 POWER
SYSTEM
Pacific DC Intertie (PDCI) Upgrade
Outage / De-rate Schedule 2014-2016
Version No.
7 Effective Date: 01/9/2015 For January 9, 2015 to January 11, 2015, the Celilo‐Sylmar Pole 3 1000kV Line and Celilo‐Sylmar Pole 4 1000kV Line will be de‐rated and the PDCI will be available for 957MW (N‐S) and 905MW (S‐N) for HE6‐
HE19 each day. The PDCI will be unavailable [0MW (N‐S) and 0MW (S‐N)] from HE5‐HE6 and HE19‐HE20 each day from January 9, 2015 to January 11, 2015 due to switching out from bi‐pole/mono‐pole operation. The PDCI will be in bi‐pole operation and will be available for 1956MW (N‐S) and 976MW (S‐
N) from January 9, 2015 HE20 to January 10, 2015 HE5 and January 10, 2015 HE20 to January 11, 2015 HE5. From February 9, 2015 to February 22, 2015, the Celilo‐Sylmar Pole 3 1000kV and Celilo‐Sylmar Pole 4 1000kV Line will be out and the PDCI will not be available [0MW (N‐S) and 0MW (S‐N)]. From June 27, 2015 to June 28, 2015, Sylmar CS Converter 1 & Converter 2 will be going through a terminal wash and the PDCI will not be available [0MW (N‐S) and 0MW (S‐N)]. From September 11, 2015 to October 16, 2015, the Celilo‐Sylmar Pole 3 1000kV Line and Celilo‐Sylmar Pole 4 1000kV Line will undergo maintenance and the PDCI will not be available [0MW (N‐S) and 0MW (S‐N)]. From November 3, 2015 to December 21, 2015, the Celilo‐Sylmar Pole 3 1000kV Line and Celilo‐Sylmar Pole 4 1000kV Line will be removed from service and the PDCI will not be available [0MW (N‐S) and 0MW (S‐N)]. From June 25, 2016 to June 26, 2016, Sylmar CS Converter 1 & Converter 2 will be going through a terminal wash and the PDCI will not be available [0MW (N‐S) and 0MW (S‐N)]. From September 16, 2016 to October 16, 2016, the Celilo‐Sylmar Pole 3 1000kV Line and Celilo‐Sylmar Pole 4 1000kV Line will undergo maintenance and the PDCI will not be available [0MW (N‐S) and 0MW (S‐N)]. In addition, BPA will be performing work from October 5, 2016 to November 1, 2016 and the PDCI will not be available [0MW (N‐S) and 0MW (S‐N)].
Version
Version
1 2 3 4 5 6 7 Revised
Document Creation Corrected outage information
Corrected outage information
Updated outage information
Updated outage information
Updated outage information
Updated outage information
By
OASIS Group OASIS Group OASIS Group OASIS Group OASIS Group OASIS Group OASIS Group Page 3 of 3 Date
09/22/2014
10/14/2014
10/15/2014
10/16/2014
11/3/2014
12/23/2014
01/9/2015